ODOT contract 268005 bid tabulation

MED-IR 71 Rest Areas TP (PARKING AREAS). Let by Ohio DOT on April 9, 2026, MED. 3 bids received; low bid $5,035,276 by Great Lakes Construction Co, -8.1% against the engineer's estimate of $5,482,000.

Owner
Ohio DOT
Letting
09 APR 2026
Pay items
123
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Great Lakes Construction Co$5,035,276Low-8.0%
2Kokosing Construction Company Inc$5,434,867+8.0%-1.0%
3Karvo Companies Inc$5,528,408+10%+1.0%
ODOT contract 268005: bids by rank

Engineer's estimate: $5,482,000.

Bid tabulation

LinePay itemUnitQuantity1. Great Lakes Construction Co2. Kokosing Construction Company Inc3. Karvo Companies Inc
1Clearing and grubbing, as per plan (201E11001)LS1$46,750$31,570$50,000
2Pavement removed (202E23000)SY20,688$9.00$9.00$20.50
3Walk removed (202E30000)SF13,676$1.20$2.25$1.75
4Curb removed (202E32000)FT5,486$1.65$3.15$8.50
5Pipe removed, 24" and under (202E35100)FT404$16.50$14.00$22.00
6Guardrail removed (202E38000)FT1,509$2.00$2.00$2.00
7Manhole removed (202E58000)EACH4$700.00$1,100.00$500.00
8Catch basin removed (202E58100)EACH5$700.00$750.00$500.00
9Special - drilled water well abandoned (202E66000)EACH2$4,795.00$1,750.00$750.00
10Fence removed (202E75000)FT63$5.00$5.00$7.00
11Removal misc.: ground mounted signs and post suppo (202E98000)LS1$1,300.00$1,500.00$1,575.00
12Removal misc.: sanitary pump station (202E98000)LS1$13,000$9,500.00$6,500.00
13Removal misc.: boulder (202E98100)EACH1$200.00$150.00$500.00
14Removal misc.: concrete picnic table (202E98100)EACH27$100.00$150.00$100.00
15Removal misc.: drinking fountain (202E98100)EACH1$250.00$350.00$250.00
16Removal misc.: flag pole (202E98100)EACH2$500.00$1,000.00$250.00
17Removal misc.: grill (202E98100)EACH9$400.00$125.00$100.00
18Removal misc.: newspaper boxes (202E98100)EACH1$250.00$650.00$225.00
19Removal misc.: vending machine (202E98100)EACH3$500.00$725.00$150.00
20Removal misc.: wood post (202E98100)EACH1$100.00$32.00$250.00
21Removal misc.: concrete pad (202E98400)SF4,972$2.00$2.00$2.50
22Excavation (203E10000)CY13,458$20.30$21.00$20.00
23Embankment (203E20000)CY6,291$10.50$2.40$12.00
24Subgrade compaction (204E10000)SY102$5.00$12.50$3.00
25Proof rolling (204E45000)HR17$400.00$160.00$250.00
26Cement (206E10500)TON927$190.00$185.00$199.00
27Curing coat (206E11000)SY35,817$1.20$1.20$1.10
28Cement stabilized subgrade, 14 inches deep (206E15020)SY35,817$3.31$4.80$2.50
29Guardrail, type MGS (606E15050)FT837.50$21.60$21.60$21.60
30Anchor assembly, type E (606E26100)EACH2$2,075.00$2,075.00$2,075.00
31Anchor assembly, type T (606E26500)EACH2$850.00$850.00$850.00
32Fence, misc.: dumpster screen wall (607E98000)FT100$192.00$192.00$192.00
33Preconstruction survey monument verification and report (623E50000)LS1$3,300.00$4,000.00$5,000.00
34Post construction survey monument verification and report (623E51000)LS1$3,300.00$4,000.00$5,000.00
35Special - bollard (690E50600)EACH9$720.00$720.00$500.00
36Tied concrete block mat with type 1 underlayment (601E21050)SY8$120.00$180.00$200.00
37Tied concrete block mat with type 2 underlayment (601E21060)SY403$115.00$85.00$50.00
38Rock channel protection, type C with filter (601E32200)CY2$515.00$450.00$800.00
39Soil analysis test (659E00100)EACH2$70.00$135.00$70.00
40Topsoil (659E00300)CY2,891$40.00$17.50$10.00
41Seeding and mulching, class 1 (659E00500)SY19,299$1.10$0.79$1.10
42Repair seeding and mulching (659E14000)SY922$1.10$0.80$1.10
43Inter-seeding (659E15000)SY922$0.80$0.80$0.80
44Commercial fertilizer (659E20000)TON2.57$850.00$939.01$850.00
45Lime (659E31000)ACRE3.81$35.00$157.87$35.00
46Water (659E35000)MGAL102$1.00$1.00$1.00
47Slope erosion protection (670E00500)SY7,595$1.80$1.32$1.80
48Ditch erosion protection mat, type B (670E00720)SY324$1.80$1.49$1.80
49Storm water pollution prevention plan (832E15000)LS1$3,400.00$3,200.00$5,000.00
50Storm water pollution prevention inspections (832E15002)LS1$8,000.00$6,420.00$15,000
51Storm water pollution prevention inspection software (832E15010)LS1$10,000$500.00$15,000
52Erosion control (832E30000)EACH94,398$1.00$1.00$1.00
53Seeding and erosion control with turf reinforcing mat, type 1 (836E10000)SY48$5.00$5.49$5.00
54Concrete masonry (602E20000)CY0.60$3,400.00$2,500.00$2,000.00
554" base pipe underdrains (605E06000)FT16,950$12.25$11.00$12.00
564" conduit, type F for underdrain outlet (611E00410)FT306$48.00$35.00$15.00
5715" conduit, type B (611E05900)FT743$110.00$125.00$75.00
60Catch basin, no. 3A (611E98180)EACH11$5,100.00$4,425.00$5,000.00
61Precast reinforced concrete outlet (611E99710)EACH4$500.00$550.00$450.00
62Asphalt concrete base, PG64-22, (449) (301E56000)CY5,619$160.00$190.00$180.00
63Aggregate base (304E20000)CY6,256$70.00$75.00$80.00
64Tack coat (407E10000)GAL4,030$2.50$1.50$2.40
65Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000)CY1,399$225.00$305.00$285.00
66Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100)CY2,333$206.00$263.00$235.00
676" non-reinforced concrete pavement, class QC 1P (452E10010)SY268$75.00$60.00$75.00
688" non-reinforced concrete pavement, class QC 1P (452E12010)SY102$135.00$110.00$100.00
69Curb, type 7 (609E28000)FT4,947$27.00$25.00$18.00
70Curb, misc.: curb, type 7 snow turnout (609E98100)EACH4$3,000.00$2,500.00$2,750.00
71Curb, misc.: curb, type 7 turnout (609E98100)EACH28$1,350.00$850.00$400.00
72Special - fill and plug existing conduit (202E70000)FT346$30.00$8.50$30.00
73Manhole adjusted to grade (611E99654)EACH5$650.00$850.00$1,000.00
744" conduit, type E (611E00400)FT240$6.82$18.00$6.79
75Connection, fused pull apart (625E00450)EACH32$149.09$220.00$148.53
76Connection, unfused permanent (625E00480)EACH36$84.61$175.00$84.29
77Light pole (installation only), as per plan (625E10503)EACH7$836.83$1,920.00$833.71
78Light pole (installation only), as per plan (625E10503)EACH9$1,047.91$3,750.00$1,044.00
79Light pole foundation, 24" X 8' deep (625E14100)EACH7$2,036.16$2,650.00$2,028.57
80Light tower foundation, 36" X 15' deep (625E15000)EACH9$4,599.37$5,150.00$4,582.22
81No. 4 AWG 2400 volt distribution cable (625E23200)FT9,585$4.43$4.50$4.41
82No. 10 AWG pole and bracket cable (625E23400)FT1,302$1.22$2.20$1.22
831-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT1,525$17.30$25.00$17.24
84Conduit, 3", 725.051 (625E25504)FT2,845$11.60$10.00$11.56
85Luminaire, conventional, solid state (LED), NVN-AF (625E26252)EACH7$495.85$385.00$494.00
86Luminaire, high mast, solid state (LED), HMLED4_P3 (625E26262)EACH36$1,378.54$1,200.00$1,373.40
87Trench, 24" deep (625E29002)FT4,370$9.32$9.00$9.29
88Pull box, 725.08, 24" (625E30706)EACH12$1,432.54$2,015.00$1,427.20
89Ground rod (625E32000)EACH25$168.79$390.00$168.16
90Power service (625E34000)EACH1$3,713.85$7,000.00$3,700.00
91Control center cabinet, complete (625E34450)EACH1$8,521.78$6,000.00$8,490.00
92Underground warning marking tape (625E36010)FT4,370$0.79$0.35$0.79
93Temporary lighting (625E39000)LS1$31,156$10,000$31,040
94Light tower removed, as per plan (625E75351)EACH8$954.56$1,500.00$951.00
95Light pole removed (625E75400)EACH14$426.88$1,450.00$425.29
96Luminaire removed, as per plan (625E75507)EACH25$93.71$130.00$93.36
97Light tower foundation removed (625E75540)EACH8$523.95$2,100.00$522.00
98Arc flash calculations and label (med-122872) (625E76000)EACH2$2,083.77$1,500.00$2,076.00
99Lighting, misc.: test existing circuit (625E98000)EACH2$406.72$2,450.00$405.20
100Ground mounted support, no. 3 post, as per plan (630E03101)FT246$12.25$15.00$15.00
101Ground mounted support, no. 4 post (630E04100)FT73$27.25$17.00$17.00
102Ground mounted structural beam support, W8X18 (630E07000)FT95$46.00$70.00$70.00
103Ground mounted structural beam support, W10X12 (630E07600)FT98$33.00$56.50$56.50
104Breakaway structural beam connection (630E09000)EACH8$765.00$725.00$725.00
105Sign, flat sheet (630E80100)SF114$18.80$19.00$19.00
106Sign erected, extrusheet (630E81200)SF456$25.10$26.00$26.00
107Ground mounted structural beam support foundation (630E84500)EACH8$1,400.00$1,275.00$1,275.00
108Removal of ground mounted sign and disposal (630E84900)EACH10$29.20$10.00$10.00
109Removal of ground mounted major sign and disposal (630E85400)EACH4$185.00$265.00$265.00
110Removal of ground mounted post support and disposal (630E86002)EACH12$26.00$20.00$20.00
111Removal of ground mounted structural beam support (630E86102)EACH4$350.00$220.00$220.00
112Edge line, 4" (644E00100)MI0.97$4,000.00$4,000.00$4,000.00
113Wrong way arrow (644E01360)EACH14$325.00$325.00$2,275.00
114Building demolished (NB 1 story brick) (202E56000)LS1$24,125$30,624$50,000
115Building demolished (NB wood shed) (202E56000)LS1$3,000.00$5,000.00$7,500.00
116Building demolished (SB 1 story brick) (202E56000)LS1$20,750$30,624$25,000
117Building demolished (SB wood shed) (202E56000)LS1$3,000.00$5,000.00$5,000.00
118Water (616E10000)MGAL39$60.00$100.00$1.00
124Parking lot stall marking (644E01200)FT9,454$1.15$1.15$1.15
130Premium for contract performance bond and for payment bond (103E05000)LS1$40,000$20,000$25,000
131Maintaining traffic (614E11000)LS1$86,000$68,554$25,000
132Field office, type C (619E16020)MNTH6$4,200.00$2,800.00$3,000.00
133Construction layout stakes and surveying (623E10000)LS1$22,500$55,000$200,000
134Mobilization (624E10000)LS1$251,000$270,000$200,000
200Light pole foundation removed (625E75500)EACH14$350.00$760.00$2,053.08
ODOT contract 268005: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 9, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way