ODOT contract 260001 bid tabulation
CUY-IR 71-10.07 SW Replace. Let by Ohio DOT on January 29, 2026, CUY. 3 bids received; low bid $10,971,781 by Ruhlin Company.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 149
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ruhlin Company | $10,971,781 | Low |
| 2 | Beaver Excavating Company | $13,286,572 | +21% |
| 3 | Great Lakes Construction Co | $13,327,911 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ruhlin Company | 2. Beaver Excavating Company | 3. Great Lakes Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $50,000 | $65,000 | $65,125 |
| 2 | Pavement removed (202E23000) | SY | 1,642 | $25.00 | $30.00 | $24.50 |
| 3 | Concrete barrier removed, as per plan (202E30701) | FT | 500 | $30.00 | $30.00 | $50.00 |
| 4 | Guardrail removed (202E38000) | FT | 1,179 | $2.40 | $2.40 | $3.00 |
| 5 | Anchor assembly removed (202E42206) | EACH | 3 | $145.00 | $145.00 | $200.00 |
| 6 | Bridge terminal assembly removed (202E47000) | EACH | 5 | $75.00 | $75.00 | $200.00 |
| 7 | Excavation (203E10000) | CY | 4,494 | $18.00 | $23.50 | $19.00 |
| 8 | Embankment (203E20000) | CY | 3,826 | $15.00 | $28.00 | $10.00 |
| 9 | Subgrade compaction (204E10000) | SY | 2,644 | $5.00 | $5.00 | $2.75 |
| 10 | Excavation of subgrade (204E13000) | CY | 100 | $40.00 | $28.00 | $70.00 |
| 11 | Granular material, type B (204E30010) | CY | 100 | $70.00 | $70.00 | $85.00 |
| 12 | Proof rolling (204E45000) | HR | 5 | $500.00 | $1,150.00 | $300.00 |
| 13 | Geotextile fabric (204E50000) | SY | 300 | $2.00 | $2.50 | $2.50 |
| 14 | Reshaping under guardrail, as per plan (209E15001) | STA | 9 | $95.00 | $780.00 | $65.00 |
| 15 | Guardrail, type MGS (606E15050) | FT | 950 | $22.40 | $22.40 | $22.00 |
| 16 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,920.00 | $2,920.00 | $2,650.00 |
| 17 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,360.00 | $1,360.00 | $1,450.00 |
| 18 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 3 | $2,840.00 | $2,840.00 | $2,475.00 |
| 19 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $580.00 | $580.00 | $750.00 |
| 20 | Concrete barrier, single slope, type D, as per plan (622E10161) | FT | 360 | $190.00 | $235.00 | $315.00 |
| 21 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 2 | $3,200.00 | $4,400.00 | $7,500.00 |
| 22 | Barrier, misc.: concrete barrier, type B50 (622E90000) | FT | 180 | $300.00 | $350.00 | $425.00 |
| 23 | Soil analysis test (659E00100) | EACH | 2 | $400.00 | $100.00 | $400.00 |
| 24 | Topsoil (659E00300) | CY | 248 | $57.00 | $40.00 | $57.00 |
| 25 | Seeding and mulching (659E10000) | SY | 2,233 | $1.30 | $2.85 | $1.30 |
| 26 | Repair seeding and mulching (659E14000) | SY | 112 | $3.00 | $3.00 | $3.00 |
| 27 | Inter-seeding (659E15000) | SY | 112 | $0.75 | $0.75 | $1.00 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.31 | $1,500.00 | $900.00 | $1,500.00 |
| 29 | Lime (659E31000) | ACRE | 0.46 | $5.00 | $5.00 | $1.00 |
| 30 | Water (659E35000) | MGAL | 12.10 | $0.50 | $0.50 | $1.00 |
| 31 | Mowing (659E40000) | MSF | 15 | $10.00 | $25.00 | $1.00 |
| 35 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 |
| 36 | Class QC1 concrete, headwall (511E46610) | CY | 0.25 | $3,500.00 | $8,700.00 | $4,200.00 |
| 37 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 34 | $65.00 | $98.00 | $130.00 |
| 38 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 1,069 | $25.00 | $27.00 | $23.50 |
| 39 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 40 | $25.00 | $45.00 | $40.00 |
| 40 | 15" conduit, type F (611E06700) | FT | 43 | $200.00 | $145.00 | $155.00 |
| 41 | Catch basin, no. 3A (611E98180) | EACH | 1 | $6,250.00 | $4,500.00 | $6,050.00 |
| 42 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $500.00 | $550.00 | $500.00 |
| 43 | Pavement planing, asphalt concrete, 1.5" depth (254E01000) | SY | 1,667 | $14.00 | $29.00 | $14.00 |
| 44 | Aggregate base (304E20000) | CY | 480 | $95.00 | $90.00 | $115.00 |
| 45 | Non-tracking tack coat (407E20000) | GAL | 147 | $4.00 | $5.00 | $4.00 |
| 46 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 25 | $575.00 | $1,564.00 | $575.00 |
| 47 | Asphalt concrete surface course, 12.5 MM, type A (449), as per plan (442E22101) | CY | 82 | $765.00 | $2,061.00 | $765.00 |
| 48 | 9" reinforced concrete pavement, class QC 1P (451E14010) | SY | 1,920 | $125.00 | $120.00 | $140.00 |
| 49 | Curb, type 4-C (609E24510) | FT | 26 | $50.00 | $65.00 | $92.00 |
| 50 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 1.14 | $6,000.00 | $6,000.00 | $6,000.00 |
| 51 | Connection, fused pull apart (625E00450) | EACH | 10 | $225.00 | $120.00 | $120.00 |
| 52 | Connection, unfused permanent (625E00480) | EACH | 15 | $185.00 | $120.00 | $120.00 |
| 53 | Light pole, conventional, design A15B40 (625E10490) | EACH | 2 | $3,700.00 | $3,000.00 | $3,000.00 |
| 54 | Light pole, conventional, design AT15B40 (625E10490) | EACH | 3 | $4,700.00 | $3,800.00 | $3,800.00 |
| 55 | Light pole anchor bolts on structure (625E10614) | EACH | 2 | $865.00 | $600.00 | $600.00 |
| 56 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 3 | $2,100.00 | $3,800.00 | $3,800.00 |
| 57 | Bracket arm, 15' (625E18200) | EACH | 5 | $1,200.00 | $1,100.00 | $1,100.00 |
| 58 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 3,834 | $2.00 | $3.50 | $3.50 |
| 59 | No. 10 AWG pole and bracket cable (625E23400) | FT | 750 | $2.00 | $2.50 | $2.50 |
| 60 | Conduit, 2", 725.04 (625E25400) | FT | 668 | $30.00 | $21.00 | $21.00 |
| 61 | Conduit, 2", 725.05 (625E25402) | FT | 580 | $14.00 | $12.00 | $12.00 |
| 62 | Luminaire, conventional, solid state (LED), type I (625E26252) | EACH | 5 | $500.00 | $600.00 | $600.00 |
| 63 | Trench, 24" deep (625E29002) | FT | 768 | $15.00 | $10.00 | $10.00 |
| 64 | Junction box (625E29900) | EACH | 2 | $3,500.00 | $3,451.00 | $3,451.00 |
| 65 | Pull box, 725.08, 18" (625E30700) | EACH | 3 | $1,700.00 | $1,250.00 | $1,250.00 |
| 66 | Pull box removed (625E31510) | EACH | 2 | $375.00 | $250.00 | $250.00 |
| 67 | Ground rod (625E32000) | EACH | 5 | $300.00 | $300.00 | $300.00 |
| 68 | Underground warning marking tape (625E36010) | FT | 768 | $2.00 | $3.00 | $3.00 |
| 69 | Pull box cleaned (625E39520) | EACH | 1 | $250.00 | $50.00 | $50.00 |
| 70 | Light pole removed (625E75400) | EACH | 5 | $400.00 | $390.00 | $390.00 |
| 71 | Light pole foundation removed (625E75500) | EACH | 3 | $350.00 | $194.00 | $194.00 |
| 72 | Barrier reflector, type 2, (BI-directional) (626E00110) | EACH | 29 | $12.60 | $12.60 | $13.00 |
| 73 | Ground mounted support, no. 2 post (630E02100) | FT | 40 | $27.77 | $27.77 | $8.35 |
| 74 | Ground mounted support, no. 3 post (630E03100) | FT | 29 | $29.86 | $29.86 | $10.50 |
| 75 | Sign, flat sheet (630E80100) | SF | 35 | $31.95 | $31.95 | $19.50 |
| 76 | Removal of ground mounted post support and disposal (630E86002) | EACH | 5 | $38.26 | $38.26 | $28.00 |
| 77 | Edge line, 6" (646E10010) | MI | 0.38 | $10,270 | $10,270 | $10,270 |
| 78 | Channelizing line, 12" (646E10310) | FT | 123 | $4.25 | $4.25 | $4.25 |
| 79 | Chevron marking (646E10620) | FT | 715 | $16.30 | $16.30 | $16.30 |
| 80 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 1.21 | $9,610.00 | $9,610.00 | $9,610.00 |
| 81 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 1.23 | $3,540.00 | $3,540.00 | $3,540.00 |
| 82 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 1,738 | $2.75 | $2.75 | $2.75 |
| 83 | Wet reflective epoxy pavement marking, dotted line, 12" (807E12430) | FT | 633 | $2.70 | $2.70 | $2.70 |
| 84 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 160 | $100.00 | $85.00 | $100.00 |
| 85 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 9 | $1,828.17 | $1,828.17 | $2,050.00 |
| 86 | Detour signing (614E12420) | LS | 1 | $20,251 | $50,000 | $15,500 |
| 87 | Work zone increased penalties sign (614E12484) | EACH | 6 | $255.29 | $255.29 | $150.00 |
| 88 | Replacement sign (614E12500) | EACH | 12 | $239.36 | $239.36 | $180.00 |
| 89 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 1,706 | $22.00 | $40.00 | $32.00 |
| 90 | Portable changeable message sign, as per plan (614E18601) | SNMT | 30 | $950.84 | $1,100.00 | $750.00 |
| 91 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 1.44 | $5,445.00 | $5,445.00 | $5,445.00 |
| 92 | Work zone edge line, class I, 6", 873 (614E22326) | MI | 4.67 | $13,609 | $13,609 | $12,225 |
| 93 | Work zone channelizing line, class I, 12", 873 (614E23130) | FT | 30,442 | $4.91 | $4.91 | $4.62 |
| 94 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 986 | $1.00 | $1.00 | $1.00 |
| 95 | Water (616E10000) | MGAL | 5 | $150.00 | $183.68 | $63.37 |
| 96 | Calcium chloride (616E20000) | TON | 0.50 | $1,000.00 | $2,074.52 | $363.32 |
| 97 | Portable barrier, unanchored (622E41100) | FT | 7,118 | $14.00 | $25.00 | $26.00 |
| 98 | Portable barrier, anchored (622E41110) | FT | 900 | $22.00 | $34.00 | $37.00 |
| 99 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $500,000 | $625,000 | $1,170,000 |
| 100 | Approach slab removed (202E22900) | SY | 87 | $50.00 | $52.00 | $75.00 |
| 101 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $300,000 | $1,110,000 | $749,350 |
| 102 | Unclassified excavation (503E21100) | CY | 1,540 | $125.00 | $200.00 | $65.00 |
| 103 | Pile driving equipment mobilization (505E11100) | LS | 1 | $110,000 | $225,000 | $255,000 |
| 104 | Steel piles HP10X42, furnished (507E00100) | FT | 6,705 | $52.00 | $43.00 | $50.00 |
| 105 | Steel piles HP10X42, driven (507E00150) | FT | 6,100 | $20.00 | $30.00 | $28.00 |
| 106 | Prebored holes, as per plan (507E92201) | FT | 555 | $60.00 | $80.00 | $65.00 |
| 107 | Epoxy coated steel reinforcement (509E10000) | LB | 287,336 | $2.30 | $2.02 | $2.20 |
| 108 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 14,644 | $1.73 | $1.76 | $1.60 |
| 109 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 564 | $1,200.00 | $1,250.00 | $1,525.00 |
| 110 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 137 | $950.00 | $1,150.00 | $950.00 |
| 111 | Class QC1 concrete with QC/QA, pier above footings (511E41012) | CY | 177 | $1,500.00 | $1,525.00 | $2,000.00 |
| 112 | Class QC1 concrete with QC/QA, abutment not including footing (511E44112) | CY | 253 | $1,100.00 | $900.00 | $1,275.00 |
| 113 | Class QC1 concrete with QC/QA, footing (511E46512) | CY | 422 | $500.00 | $495.00 | $650.00 |
| 114 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,647 | $38.00 | $28.00 | $35.00 |
| 115 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 70 | $50.00 | $22.00 | $30.00 |
| 116 | Type 2 waterproofing (512E33000) | SY | 91 | $45.00 | $35.00 | $30.00 |
| 117 | Structural steel members, level 5 (513E10300) | LB | 771,146 | $2.76 | $3.29 | $3.10 |
| 118 | Welded stud shear connectors (513E20000) | EACH | 9,048 | $5.00 | $4.10 | $4.10 |
| 119 | Field painting structural steel, intermediate coat (514E00060) | SF | 34,727 | $10.00 | $10.00 | $10.00 |
| 120 | Field painting structural steel, finish coat (514E00066) | SF | 34,727 | $2.50 | $2.50 | $2.50 |
| 121 | Structural expansion joint including elastomeric strip seal (516E11210) | FT | 153 | $900.00 | $785.00 | $900.00 |
| 122 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 6 | $3,000.00 | $1,900.00 | $2,400.00 |
| 123 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 6 | $3,500.00 | $2,200.00 | $3,000.00 |
| 124 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 12 | $3,300.00 | $2,100.00 | $2,750.00 |
| 125 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 6 | $3,500.00 | $2,300.00 | $2,850.00 |
| 126 | Prefabricated geocomposite drain (518E20000) | SY | 226 | $40.00 | $25.00 | $40.00 |
| 127 | 6" perforated corrugated plastic pipe (518E40000) | FT | 202 | $22.00 | $21.00 | $15.00 |
| 128 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 98 | $36.00 | $20.00 | $25.00 |
| 129 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 327 | $525.00 | $520.00 | $525.00 |
| 130 | Type A installation (526E90010) | FT | 154 | $200.00 | $240.00 | $260.00 |
| 131 | Crushed aggregate slope protection (601E20000) | SY | 656 | $50.00 | $46.00 | $48.00 |
| 132 | Surface preparation of existing structural steel (514E00050) | SF | 31,400 | $12.75 | $12.75 | $12.75 |
| 133 | Field painting of existing structural steel, prime coat (514E00056) | SF | 31,400 | $2.65 | $2.65 | $2.65 |
| 134 | Field painting structural steel, intermediate coat (514E00060) | SF | 31,900 | $2.50 | $2.50 | $2.50 |
| 135 | Field painting structural steel, finish coat (514E00066) | SF | 31,900 | $2.60 | $2.60 | $2.60 |
| 136 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 29 | $45.85 | $45.85 | $45.85 |
| 137 | Final inspection repair (514E10000) | EACH | 21 | $300.00 | $300.00 | $300.00 |
| 138 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $65,000 | $95,000 | $100,000 |
| 139 | CPM progress schedule (108E10000) | LS | 1 | $5,000.00 | $7,500.00 | $1,500.00 |
| 140 | Maintaining traffic (614E11000) | LS | 1 | $745,000 | $1,100,000 | $900,000 |
| 141 | Field office, type C, as per plan (619E16021) | MNTH | 36 | $4,250.00 | $4,750.00 | $6,250.00 |
| 142 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $105,000 | $85,000 | $85,000 |
| 143 | Mobilization (624E10000) | LS | 1 | $548,000 | $650,000 | $665,500 |
| 200 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 70 | $615.00 | $276.00 | $615.00 |
| 201 | Asphalt concrete intermediate course, 19 MM, type A (448) (442E20200) | CY | 14 | $680.00 | $892.00 | $680.00 |
| 202 | Structure junction box (625E29920) | EACH | 2 | $4,350.00 | $3,200.00 | $3,200.00 |
| 203 | Special - maintain existing lighting (625E40000) | LS | 1 | $11,500 | $16,000 | $16,000 |
| 204 | Porous backfill with geotextile fabric (518E21200) | CY | 38 | $150.00 | $150.00 | $165.00 |
| 205 | Work zone edge line, class I, 6", 807 paint (614E22056) | MI | 2.34 | $2,615.00 | $2,615.00 | $2,615.00 |
| 206 | Work zone channelizing line, class I, 12", 807 paint (614E23110) | FT | 15,221 | $2.00 | $2.00 | $2.00 |
| 207 | RPM (621E00100) | EACH | 97 | $154.70 | $95.00 | $154.70 |
| 208 | Lane line, 6" (646E10110) | MI | 0.31 | $23,260 | $23,260 | $23,260 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.