ODOT contract 250438 bid tabulation
HEN-/LUC-US 24-15.86/-0.00 CPR (SPOT PATCHING / PAVEMENT REPAIR). Let by Ohio DOT on September 25, 2025, HEN. 8 bids received; low bid $3,428,026 by DOT Diamond Core Drilling Inc, -4.4% against the engineer's estimate of $3,585,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 25
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | DOT Diamond Core Drilling Inc | $3,428,026 | Low | -4.0% |
| 2 | Swank Construction Company LLC | $3,535,739 | +3.0% | -1.0% |
| 3 | Interstate Improvement Inc | $3,809,204 | +11% | +6.0% |
| 4 | Emery Sapp & Sons, Inc | $3,860,420 | +13% | +8.0% |
| 5 | Karvo Companies Inc | $3,965,359 | +16% | +11% |
| 6 | Diamond Surface Inc | $4,254,870 | +24% | +19% |
| 7 | Perk Company Inc | $4,294,210 | +25% | +20% |
| 8 | Diamond Coring Company Inc | $4,743,047 | +38% | +32% |
Engineer's estimate: $3,585,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. DOT Diamond Core Drilling Inc | 2. Swank Construction Company LLC | 3. Interstate Improvement Inc | 4. Emery Sapp & Sons, Inc | 5. Karvo Companies Inc | 6. Diamond Surface Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 1,716 | $28.00 | $28.00 | $15.00 | $72.00 | $65.00 | $49.50 |
| 2 | Full depth pavement removal and rigid replacement, type 1, class QC1 (255E11000) | SY | 3,680 | $165.40 | $165.40 | $175.00 | $226.00 | $215.00 | $250.75 |
| 3 | Full depth pavement sawing (255E20000) | FT | 16,560 | $3.56 | $4.50 | $3.60 | $1.45 | $3.00 | $3.50 |
| 4 | Diamond grinding portland cement concrete pavement, as per plan (257E10001) | SY | 449,576 | $3.90 | $3.81 | $3.95 | $3.38 | $3.50 | $3.85 |
| 5 | 11.5" non-reinforced concrete pavement, class QC 1P (452E14200) | SY | 1,716 | $119.00 | $119.00 | $155.00 | $170.00 | $138.00 | $226.00 |
| 6 | Special - pressure relief joint asphalt replacemen (690E98000) | EACH | 8 | $8,425.00 | $15,500 | $13,000 | $13,287 | $7,500.00 | $12,600 |
| 7 | RPM (621E00100) | EACH | 1,455 | $43.50 | $48.00 | $37.60 | $45.00 | $42.00 | $44.72 |
| 8 | Raised pavement marker removed (621E54000) | EACH | 1,455 | $40.00 | $35.00 | $15.00 | $33.00 | $12.00 | $15.84 |
| 9 | Edge line, 6", type 1 (642E00104) | MI | 61.07 | $875.00 | $950.00 | $1,030.00 | $897.00 | $810.00 | $891.00 |
| 10 | Lane line, 6", type 1 (642E00204) | MI | 30.70 | $775.00 | $550.00 | $600.00 | $388.00 | $350.00 | $385.00 |
| 11 | Channelizing line, 12", type 1 (642E00404) | FT | 8,861 | $1.75 | $1.00 | $1.10 | $0.90 | $0.80 | $0.88 |
| 12 | Transverse/diagonal line, type 1 (642E00700) | FT | 437 | $4.00 | $5.00 | $5.45 | $8.00 | $6.50 | $7.15 |
| 13 | Dotted line, 6", type 1 (642E01510) | FT | 3,675 | $2.00 | $1.00 | $1.10 | $0.85 | $0.75 | $0.83 |
| 14 | Detour signing (614E12420) | LS | 1 | $8,700.00 | $6,500.00 | $7,050.00 | $17,965 | $25,000 | $17,845 |
| 15 | Work zone marking sign (614E12460) | EACH | 34 | $160.00 | $125.00 | $140.00 | $114.00 | $100.00 | $112.46 |
| 16 | Replacement sign (614E12500) | EACH | 5 | $70.00 | $225.00 | $245.00 | $265.00 | $250.00 | $263.30 |
| 17 | Replacement drum (614E12600) | EACH | 5 | $170.00 | $45.00 | $50.00 | $61.00 | $75.00 | $60.50 |
| 18 | Portable changeable message sign, as per plan (614E18601) | SNMT | 14 | $900.00 | $1,000.00 | $1,085.00 | $1,422.00 | $1,250.00 | $1,412.15 |
| 19 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 30.70 | $775.00 | $550.00 | $600.00 | $765.00 | $500.00 | $759.00 |
| 20 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 61.07 | $875.00 | $950.00 | $1,030.00 | $1,562.00 | $1,000.00 | $1,551.00 |
| 21 | Work zone channelizing line, class I, 12" (614E23010) | FT | 8,861 | $1.75 | $1.00 | $1.10 | $0.78 | $0.70 | $0.77 |
| 22 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $35,000 | $20,000 | $15,000 | $22,146 | $50,000 | $22,000 |
| 23 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $185,000 | $250,000 | $404,000 | $379,000 | $263,690 |
| 24 | Mobilization (624E10000) | LS | 1 | $170,000 | $210,000 | $350,000 | $152,000 | $400,000 | $325,285 |
| 100 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 256 | $150.00 | $110.00 | $99.50 | $84.00 | $125.00 | $88.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way