Swank Construction Company LLC: ODOT bid record

Swank Construction Company LLC submitted 12 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 25 SEP 2025, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +55% above the low bid.

Owner
Ohio DOT
Low bid volume
$0
Latest bid
25 SEP 2025
Data through
12 NOV 2026
12Bids
0Low bids
0Win rate, percent
+55%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2020400%
2021400%
2023200%
2024100%
2025100%
Swank Construction Company LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL300%
District 4200%
District 5200%
District 12100%
COL100%
MAH100%
LAW100%
HEN100%
Swank Construction Company LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH55 (100%)$1.00$1.00
Portable changeable message sign, as per plan614E18601SNMT61 (17%)$1,750.00$950.00
Aggregate base304E20000CY51 (20%)$105.00$90.00
Water616E10000MGAL51 (20%)$30.00$20.00
1" preformed expansion joint filler516E13600SF51 (20%)$5.54$10.00
Swank Construction Company LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Scodeller Construction Inc55 of 5
DOT Construction Corp44 of 4
The Aero-Mark Company LLC33 of 3
Shelly & Sands Inc33 of 3
Complete General Construction Company32 of 3
Strawser Construction Inc22 of 2
Marucci & Gaffney Excavating Co22 of 2
Bituminous Pavement Systems22 of 2
National Industrial Maintenance Inc21 of 2
Annseal Inc11 of 1
Swank Construction Company LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
25 SEP 2025250438HENHEN-/LUC-US 24-15.86/-0.00 CPR (SPOT PATCHING / PAVEMENT REPAIR)2 of 8$3,535,739+3.0%
25 JUL 2024240378LAWLAW-SR 93-00.00 (BRIDGE REPAIR)2 of 3$973,332+20%
23 FEB 2023230133District 5D05-CS FY2023 (CRACK SEALING)6 of 7$876,297+72%
12 JAN 2023230031District 4D04-CS FY2023 (CRACK SEALING)4 of 6$1,796,599+68%
12 AUG 2021217004MAHMAH-IR 76/IR 80-03.53/00.00 (SPOT PATCHING / PAVEMENT REPAIR)2 of 2$5,246,962+55%
27 MAY 2021210331BELBEL-IR 470-03.22 (BRIDGE REPAIR)6 of 7$1,971,922+10%
25 FEB 2021210115COLCOL-Elizabeth Street Bridge (BRIDGE REPLACEMENT (1 BRIDGE))2 of 3$3,190,475+30%
25 FEB 2021210143BELBEL-SR 7-11.48 (BRIDGE REPAIR)4 of 7$11,185,814+45%
16 JUL 2020200404District 12D12-CS FY2021 (CRACK SEALING)5 of 5$654,364+201%
26 MAR 2020207009BELBEL-SR 647-01.40 (SLIDE REPAIR)6 of 6$546,566+137%
13 FEB 2020200079District 5D05-CS FY2020 (CRACK SEALING)8 of 8$775,435+107%
23 JAN 2020200035District 4D04-CS FY2020 (CRACK SEALING)7 of 7$1,978,753+100%
Swank Construction Company LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy