ODOT contract 260462 bid tabulation

HAM-US 42-09.73/12.29 (FOUR LANE RESURFACING). Let by Ohio DOT on October 15, 2026, HAM. 2 bids received; low bid $1,030,900 by Barrett Paving Materials Inc, +9.4% against the engineer's estimate of $942,000.

Owner
Ohio DOT
Letting
15 OCT 2026
Pay items
35
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Barrett Paving Materials Inc$1,030,900Low+9.0%
2John R Jurgensen Company$1,170,712+14%+24%
ODOT contract 260462: bids by rank

Engineer's estimate: $942,000.

Bid tabulation

LinePay itemUnitQuantity1. Barrett Paving Materials Inc2. John R Jurgensen Company
1Walk removed (202E30000)SF68$15.00$40.00
2Curb and gutter removed (202E32500)FT10$30.00$80.00
3Detectable warning (608E53020)SF68$115.00$90.00
4Combination curb and gutter, type 4 (609E23000)FT10$200.00$225.00
5Catch basin adjusted to grade (611E98630)EACH40$500.00$1,439.36
6Manhole adjusted to grade (611E99654)EACH52$500.00$1,364.68
7Pavement repair (253E02000)CY90$725.00$1,163.70
8Pavement planing, asphalt concrete, 2" (254E01000)SY30,985$5.00$3.98
9Patching planed surface (254E01600)SY311$5.00$7.04
10Non-tracking tack coat (407E20000)GAL2,789$4.00$5.00
11Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000)CY1,722$295.00$313.80
12Valve box adjusted to grade (638E10800)EACH33$300.00$904.26
13RPM (621E00100)EACH79$70.20$70.20
14Raised pavement marker removed (621E54000)EACH79$10.00$16.66
15Edge line, 6" (644E00104)MI1.72$5,055.00$5,055.00
16Lane line, 6" (644E00204)MI0.49$2,527.00$2,527.00
17Center line (644E00300)MI1.05$6,128.00$6,128.00
18Channelizing line, 8" (644E00400)FT541$1.60$1.60
19Stop line (644E00500)FT350$7.66$7.66
20Crosswalk line, 12" (644E00620)FT1,250$3.85$3.85
21Transverse/diagonal line (644E00700)FT250$6.50$6.50
22Lane arrow (644E01300)EACH8$115.00$115.00
23Dotted line, 6" (644E01510)FT55$1.55$1.55
24Law enforcement officer with patrol car for assistance (614E11110)HR40$125.00$133.82
25Work zone lane line, class III, 6", 642 paint (614E20560)MI0.49$862.00$862.00
26Work zone center line, class III, 642 paint (614E21550)MI1.05$2,586.00$2,586.00
27Work zone edge line, class III, 6", 642 paint (614E22360)MI1.72$1,724.00$1,724.00
28Work zone channelizing line, class III, 8", 642 paint (614E23680)FT541$0.75$0.75
29Work zone stop line, class III, 642 paint (614E26610)FT350$5.40$5.40
30Work zone crosswalk line, class III, 12", 642 paint (614E27250)FT1,250$2.70$2.70
31Work zone arrow, class III, 642 paint (614E30650)EACH8$43.00$43.00
32Premium for contract performance bond and for payment bond (103E05000)LS1$3,173.91$3,571.78
33Maintaining traffic (614E11000)LS1$135,000$100,187
34Construction layout stakes and surveying, as per plan (623E10001)LS1$1,500.00$5,444.65
35Mobilization (624E10000)LS1$32,500$55,000
ODOT contract 260462: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy