Ford Development Corp: ODOT bid record
Ford Development Corp submitted 18 bids on Ohio DOT contracts in the data, from 07 MAY 2020 to 27 AUG 2026, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $7,142,759
- Latest bid
- 27 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 9 | 4 | 44% |
| 2024 | 3 | 0 | 0% |
| 2025 | 3 | 1 | 33% |
| 2026 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HAM | 10 | 4 | 40% |
| CLE | 4 | 0 | 0% |
| BUT | 3 | 1 | 33% |
| BRO | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 18 | 18 (100%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 17 | 15 (88%) | $300.00 | $850.00 |
| Subgrade compaction | 204E10000 | SY | 14 | 12 (86%) | $1.25 | $3.00 |
| Pavement removed | 202E23000 | SY | 13 | 10 (77%) | $10.00 | $17.00 |
| Lime | 659E31000 | ACRE | 16 | 8 (50%) | $100.00 | $150.00 |
| Seeding and mulching | 659E10000 | SY | 11 | 8 (73%) | $1.00 | $2.60 |
| Repair seeding and mulching | 659E14000 | SY | 11 | 8 (73%) | $1.00 | $1.25 |
| Walk removed | 202E30000 | SF | 10 | 8 (80%) | $1.50 | $4.00 |
| Curb removed | 202E32000 | FT | 12 | 7 (58%) | $5.00 | $10.00 |
| Proof rolling | 204E45000 | HR | 7 | 7 (100%) | $100.00 | $219.05 |
| Excavation | 203E10000 | CY | 14 | 6 (43%) | $20.00 | $27.00 |
| Catch basin removed | 202E58100 | EACH | 8 | 6 (75%) | $150.00 | $500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Prus Construction Company | 13 | 7 of 13 |
| Sunesis Construction Co | 11 | 6 of 11 |
| John R Jurgensen Company | 11 | 4 of 11 |
| Barrett Paving Materials Inc | 8 | 5 of 8 |
| Eclipse Co LLC | 5 | 2 of 5 |
| Axis Civil Construction LLC | 5 | 2 of 5 |
| Eagle Bridge Co | 3 | 3 of 3 |
| Complete General Construction Company | 3 | 1 of 3 |
| Adleta Inc | 3 | 1 of 3 |
| KT Holden Construction LLC | 3 | 2 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | 260381 | CLE | CLE-SR 125-14.08 (SIDEWALK) | 5 of 5 | $1,362,959 | +40% |
| 12 MAR 2026 | 260122 | HAM | HAM-CR 299-05.78 Loveland Madeira (SIDEWALK) | 5 of 5 | $2,348,018 | +31% |
| 11 SEP 2025 | 250411 | HAM | HAM-CR 270-02.96 Miami Ave (MINOR RECONSTRUCTION) | 1 of 5 | $5,460,521 | Low, 3.0% under the second |
| 15 MAY 2025 | 250242 | CLE | CLE-US 50/SR 28-00.83/00.00 (MISCELLANEOUS) | 2 of 4 | $1,394,667 | +5.0% |
| 16 JAN 2025 | 240582 | HAM | HAM-US 52-36.85 (SLIDE REPAIR) | 4 of 9 | $2,177,017 | +13% |
| 12 SEP 2024 | 240426 | CLE | CLE-SR 232-01.80 (CULVERT REPLACEMENT) | 3 of 5 | $397,077 | +17% |
| 04 APR 2024 | 240211 | HAM | HAM-CR 101-13.63 (INTERSECTION) | 6 of 6 | $1,391,701 | +31% |
| 22 FEB 2024 | 240139 | HAM | HAM-US 42-14.78 (BIKEWAYS) | 5 of 5 | $2,495,026 | +32% |
| 29 JUL 2021 | 210437 | HAM | HAM-US 127-09.67 (MISCELLANEOUS) | 3 of 4 | $198,007 | +5.0% |
| 27 MAY 2021 | 210332 | BUT | BUT-SR 73-18.08 (MISCELLANEOUS) | 1 of 4 | $273,070 | Low, 6.0% under the second |
| 27 MAY 2021 | 210333 | CLE | CLE-Bike Trail Culvert FY21 (CULVERT REPLACEMENT) | 3 of 9 | $193,031 | +18% |
| 27 MAY 2021 | 210342 | HAM | HAM-US 42-09.62 (SIDEWALK) | 1 of 4 | $287,023 | Low, 5.0% under the second |
| 15 APR 2021 | 210237 | HAM | HAM-Deer Park Bike/Ped Connector (BIKEWAYS) | 1 of 4 | $866,011 | Low, 12% under the second |
| 01 APR 2021 | 210190 | BUT | BUT-SR 4-13.90 (INTERSECTION) | 7 of 7 | $828,083 | +28% |
| 25 FEB 2021 | 210113 | BRO | BRO-SR 505-05.97 (CULVERT REPLACEMENT) | 4 of 9 | $490,091 | +10% |
| 11 FEB 2021 | 210089 | HAM | HAM-Lincoln Hts. SRTS 2017 (SIDEWALK) | 1 of 3 | $256,135 | Low, 8.0% under the second |
| 28 JAN 2021 | 210057 | HAM | HAM-IR 275-34.70 (SLIDE REPAIR) | 5 of 8 | $749,019 | +16% |
| 07 MAY 2020 | 200265 | BUT | BUT-SR 73-13.05 (INTERSECTION) | 7 of 8 | $3,733,050 | +27% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.