Ford Development Corp: ODOT bid record

Ford Development Corp submitted 18 bids on Ohio DOT contracts in the data, from 07 MAY 2020 to 27 AUG 2026, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +18% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,142,759
Latest bid
27 AUG 2026
Data through
12 NOV 2026
18Bids
5Low bids
28Win rate, percent
+18%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
2020100%
20219444%
2024300%
20253133%
2026200%
Ford Development Corp, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
HAM10440%
CLE400%
BUT3133%
BRO100%
Ford Development Corp, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1818 (100%)$1.00$1.00
Commercial fertilizer659E20000TON1715 (88%)$300.00$850.00
Subgrade compaction204E10000SY1412 (86%)$1.25$3.00
Pavement removed202E23000SY1310 (77%)$10.00$17.00
Lime659E31000ACRE168 (50%)$100.00$150.00
Seeding and mulching659E10000SY118 (73%)$1.00$2.60
Repair seeding and mulching659E14000SY118 (73%)$1.00$1.25
Walk removed202E30000SF108 (80%)$1.50$4.00
Curb removed202E32000FT127 (58%)$5.00$10.00
Proof rolling204E45000HR77 (100%)$100.00$219.05
Excavation203E10000CY146 (43%)$20.00$27.00
Catch basin removed202E58100EACH86 (75%)$150.00$500.00
Ford Development Corp, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Ford Development Corp, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
27 AUG 2026260381CLECLE-SR 125-14.08 (SIDEWALK)5 of 5$1,362,959+40%
12 MAR 2026260122HAMHAM-CR 299-05.78 Loveland Madeira (SIDEWALK)5 of 5$2,348,018+31%
11 SEP 2025250411HAMHAM-CR 270-02.96 Miami Ave (MINOR RECONSTRUCTION)1 of 5$5,460,521Low, 3.0% under the second
15 MAY 2025250242CLECLE-US 50/SR 28-00.83/00.00 (MISCELLANEOUS)2 of 4$1,394,667+5.0%
16 JAN 2025240582HAMHAM-US 52-36.85 (SLIDE REPAIR)4 of 9$2,177,017+13%
12 SEP 2024240426CLECLE-SR 232-01.80 (CULVERT REPLACEMENT)3 of 5$397,077+17%
04 APR 2024240211HAMHAM-CR 101-13.63 (INTERSECTION)6 of 6$1,391,701+31%
22 FEB 2024240139HAMHAM-US 42-14.78 (BIKEWAYS)5 of 5$2,495,026+32%
29 JUL 2021210437HAMHAM-US 127-09.67 (MISCELLANEOUS)3 of 4$198,007+5.0%
27 MAY 2021210332BUTBUT-SR 73-18.08 (MISCELLANEOUS)1 of 4$273,070Low, 6.0% under the second
27 MAY 2021210333CLECLE-Bike Trail Culvert FY21 (CULVERT REPLACEMENT)3 of 9$193,031+18%
27 MAY 2021210342HAMHAM-US 42-09.62 (SIDEWALK)1 of 4$287,023Low, 5.0% under the second
15 APR 2021210237HAMHAM-Deer Park Bike/Ped Connector (BIKEWAYS)1 of 4$866,011Low, 12% under the second
01 APR 2021210190BUTBUT-SR 4-13.90 (INTERSECTION)7 of 7$828,083+28%
25 FEB 2021210113BROBRO-SR 505-05.97 (CULVERT REPLACEMENT)4 of 9$490,091+10%
11 FEB 2021210089HAMHAM-Lincoln Hts. SRTS 2017 (SIDEWALK)1 of 3$256,135Low, 8.0% under the second
28 JAN 2021210057HAMHAM-IR 275-34.70 (SLIDE REPAIR)5 of 8$749,019+16%
07 MAY 2020200265BUTBUT-SR 73-13.05 (INTERSECTION)7 of 8$3,733,050+27%
Ford Development Corp: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy