Adleta Inc: ODOT bid record
Adleta Inc submitted 11 bids on Ohio DOT contracts in the data, from 15 OCT 2020 to 04 APR 2024, and was the low bidder on 6 of them (55%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,752,165
- Latest bid
- 04 APR 2024
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 6 | 2 | 33% |
| 2022 | 1 | 1 | 100% |
| 2023 | 1 | 1 | 100% |
| 2024 | 2 | 2 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HAM | 10 | 6 | 60% |
| HIG | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 11 | 11 (100%) | $1.00 | $1.00 |
| Curb removed | 202E32000 | FT | 11 | 5 (45%) | $10.96 | $10.00 |
| Topsoil | 659E00300 | CY | 9 | 5 (56%) | $58.85 | $45.00 |
| Curb, type 6 | 609E26000 | FT | 8 | 4 (50%) | $32.22 | $37.50 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 7 | 4 (57%) | $26.25 | $23.50 |
| Pavement removed | 202E23000 | SY | 10 | 3 (30%) | $23.11 | $17.00 |
| Walk removed | 202E30000 | SF | 10 | 3 (30%) | $2.65 | $4.00 |
| Aggregate base | 304E20000 | CY | 6 | 3 (50%) | $86.97 | $90.00 |
| Asphalt concrete surface course, type 1, (448), PG64-22 | 441E50000 | CY | 5 | 3 (60%) | $253.69 | $300.00 |
| Curb ramp | 608E52000 | SF | 7 | 2 (29%) | $18.73 | $22.00 |
| Valve box adjusted to grade | 638E10800 | EACH | 7 | 2 (29%) | $476.73 | $500.00 |
| Sign post reflector | 630E08600 | EACH | 6 | 2 (33%) | $62.10 | $47.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Prus Construction Company | 10 | 2 of 10 |
| Sunesis Construction Co | 4 | 0 of 4 |
| Tri-State Concrete Construction Inc | 3 | 2 of 3 |
| R A Miller Construction Co | 3 | 1 of 3 |
| Ford Development Corp | 3 | 2 of 3 |
| Axis Civil Construction LLC | 2 | 1 of 2 |
| Complete General Construction Company | 2 | 0 of 2 |
| Fillmore Construction | 1 | 1 of 1 |
| Shelly & Sands Inc | 1 | 0 of 1 |
| Barrett Paving Materials Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 APR 2024 | 240212 | HAM | HAM-US 27-10.18 Sidewalks (SIDEWALK) | 1 of 3 | $821,586 | Low, 30% under the second |
| 22 FEB 2024 | 240089 | HAM | HAM-Sharonville SRTS 2021 (MISCELLANEOUS) | 1 of 4 | $372,913 | Low, 6.0% under the second |
| 28 SEP 2023 | 230468 | HAM | HAM-SR 4-07.00 Sidewalk (SIDEWALK) | 1 of 4 | $511,895 | Low, 33% under the second |
| 13 OCT 2022 | 220547 | HAM | HAM-SRTS Lockland FY 23 (SIDEWALK) | 1 of 3 | $699,064 | Low, 0.0% under the second |
| 29 JUL 2021 | 210413 | HIG | HIG-US 50/Main Street Sidewalks (SIDEWALK) | 3 of 4 | $555,014 | +12% |
| 29 JUL 2021 | 210436 | HAM | HAM-CR 376-00.96 Paddison Sidewlk (SIDEWALK) | 3 of 4 | $394,659 | +3.0% |
| 29 JUL 2021 | 210437 | HAM | HAM-US 127-09.67 (MISCELLANEOUS) | 1 of 4 | $187,909 | Low, 4.0% under the second |
| 27 MAY 2021 | 210342 | HAM | HAM-US 42-09.62 (SIDEWALK) | 3 of 4 | $335,694 | +17% |
| 11 FEB 2021 | 210089 | HAM | HAM-Lincoln Hts. SRTS 2017 (SIDEWALK) | 2 of 3 | $277,109 | +8.0% |
| 14 JAN 2021 | 210022 | HAM | HAM-Mt. Healthy SRTS 2017 (SIDEWALK) | 1 of 4 | $158,800 | Low, 21% under the second |
| 15 OCT 2020 | 200440 | HAM | HAM-US 27-10.39 (SIDEWALK) | 4 of 5 | $676,339 | +13% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.