ODOT contract 250411 bid tabulation
HAM-CR 270-02.96 Miami Ave (MINOR RECONSTRUCTION). Let by Ohio DOT on September 11, 2025, HAM. 5 bids received; low bid $5,460,521 by Ford Development Corp, +34% against the engineer's estimate of $4,076,000.
- Owner
- Ohio DOT
- Letting
- 11 SEP 2025
- Pay items
- 150
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ford Development Corp | $5,460,521 | Low | +34% |
| 2 | Prus Construction Company | $5,644,975 | +3.0% | +38% |
| 3 | Sunesis Construction Co | $5,774,919 | +6.0% | +42% |
| 4 | Barrett Paving Materials Inc | $6,371,806 | +17% | +56% |
| 5 | John R Jurgensen Company | $6,429,484 | +18% | +58% |
Engineer's estimate: $4,076,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ford Development Corp | 2. Prus Construction Company | 3. Sunesis Construction Co | 4. Barrett Paving Materials Inc | 5. John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $30,000 | $3,000.00 | $18,603 | $25,000 | $17,975 |
| 2 | Structure removed (202E11004) | EACH | 1 | $20,000 | $2,500.00 | $1,847.91 | $1,500.00 | $1,629.03 |
| 3 | Pavement removed (202E23000) | SY | 7,331 | $50.00 | $21.00 | $38.18 | $36.00 | $22.61 |
| 4 | Walk removed (202E30000) | SF | 37,354 | $5.00 | $3.50 | $7.66 | $2.50 | $4.45 |
| 5 | Curb removed (202E32000) | FT | 4,214 | $10.00 | $16.00 | $9.95 | $12.00 | $8.78 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 145 | $1.00 | $40.00 | $29.37 | $65.00 | $127.52 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 65 | $1.00 | $68.00 | $31.65 | $75.00 | $169.26 |
| 8 | Guard post removed (202E38800) | EACH | 2 | $100.00 | $135.00 | $76.92 | $100.00 | $476.35 |
| 9 | Manhole removed (202E58000) | EACH | 2 | $250.00 | $2,400.00 | $1,660.40 | $1,200.00 | $1,413.64 |
| 10 | Catch basin removed (202E58100) | EACH | 16 | $250.00 | $675.00 | $641.89 | $800.00 | $1,413.64 |
| 11 | Fence removed (202E75000) | FT | 34 | $10.00 | $38.00 | $12.48 | $6.00 | $23.95 |
| 12 | Excavation (203E10000) | CY | 78 | $50.00 | $45.00 | $71.09 | $115.00 | $95.16 |
| 13 | Embankment (203E20000) | CY | 36 | $70.00 | $75.00 | $34.24 | $150.00 | $85.13 |
| 14 | Granular material, type C (204E30020) | CY | 2,320 | $70.00 | $72.00 | $109.29 | $115.00 | $123.53 |
| 15 | Roadway, misc.:sewer cleanout adjusted to grade (203E98600) | EACH | 2 | $250.00 | $625.00 | $485.74 | $1,500.00 | $2,313.28 |
| 16 | Subgrade compaction (204E10000) | SY | 5,283 | $3.00 | $2.50 | $3.86 | $5.00 | $4.40 |
| 17 | Excavation of subgrade (204E13000) | CY | 2,320 | $15.00 | $37.50 | $84.04 | $80.00 | $76.92 |
| 18 | Proof rolling (204E45000) | HR | 8 | $125.00 | $150.00 | $332.95 | $2,000.00 | $300.71 |
| 19 | Curb ramp (608E52000) | SF | 2,770 | $30.00 | $18.00 | $22.36 | $25.00 | $23.73 |
| 20 | Curb ramp, as per plan (608E52001) | SF | 678 | $30.00 | $15.00 | $29.63 | $25.00 | $23.80 |
| 21 | Detectable warning, as per plan (608E53021) | SF | 520 | $65.00 | $70.00 | $65.00 | $70.00 | $65.00 |
| 22 | Walkway, misc.:brick pavers, driveway (608E98000) | SF | 7,594 | $41.00 | $50.00 | $47.66 | $50.00 | $54.16 |
| 23 | Walkway, misc.:brick pavers, walk (608E98000) | SF | 43,086 | $34.50 | $38.00 | $34.23 | $40.00 | $41.35 |
| 24 | Pull box removed (625E31510) | EACH | 44 | $412.00 | $335.00 | $375.00 | $350.00 | $300.00 |
| 25 | Light pole removed (625E75400) | EACH | 29 | $742.00 | $725.00 | $675.00 | $1,000.00 | $650.00 |
| 26 | Special - consultant for concrete quaility contro (690E98400) | LS | 1 | $70,000 | $75,000 | $28,600 | $40,000 | $25,691 |
| 27 | Topsoil (659E00300) | CY | 27 | $100.00 | $70.00 | $184.34 | $100.00 | $115.61 |
| 28 | Seeding and mulching (659E10000) | SY | 249 | $5.00 | $2.50 | $16.54 | $6.50 | $6.50 |
| 29 | Repair seeding and mulching (659E14000) | SY | 12 | $1.00 | $10.00 | $5.00 | $6.50 | $6.50 |
| 30 | Inter-seeding (659E15000) | SY | 12 | $1.00 | $10.00 | $5.00 | $4.00 | $4.00 |
| 31 | Commercial fertilizer (659E20000) | TON | 0.03 | $100.00 | $2,500.00 | $5,000.00 | $2,000.00 | $2,000.00 |
| 32 | Lime (659E31000) | ACRE | 0.05 | $100.00 | $6,000.00 | $2,500.00 | $600.00 | $600.00 |
| 33 | Water (659E35000) | MGAL | 1.40 | $100.00 | $125.00 | $1.39 | $10.00 | $10.00 |
| 34 | Mowing (659E40000) | MSF | 0.60 | $3.00 | $500.00 | $1,000.00 | $580.00 | $580.00 |
| 35 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,500.00 | $2,950.00 | $2,635.00 | $18,500 | $2,635.00 |
| 36 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $10,000 | $21,000 | $14,981 | $25,000 | $17,460 |
| 37 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $5,000.00 | $22,000 | $19,526 | $20,000 | $19,526 |
| 38 | Erosion control (832E30000) | EACH | 35,065 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 39 | 6" base pipe underdrains (605E14000) | FT | 2,920 | $10.00 | $42.00 | $26.72 | $32.00 | $39.84 |
| 40 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 240 | $15.00 | $46.25 | $65.47 | $50.00 | $60.81 |
| 41 | 8" conduit, type B (611E01800) | FT | 12 | $145.00 | $225.00 | $177.18 | $145.00 | $178.04 |
| 42 | 12" conduit, type B (611E04400) | FT | 882 | $160.00 | $185.00 | $197.43 | $225.00 | $123.09 |
| 43 | 18" conduit, type B (611E07400) | FT | 29 | $170.00 | $270.00 | $201.84 | $360.00 | $220.52 |
| 44 | 24" conduit, type B (611E10400) | FT | 44 | $180.00 | $380.00 | $355.64 | $380.00 | $435.76 |
| 45 | 30" conduit, type B (611E13400) | FT | 16 | $200.00 | $675.00 | $464.17 | $525.00 | $672.38 |
| 46 | Catch basin, no. 3 (611E98150) | EACH | 5 | $7,000.00 | $5,800.00 | $4,999.59 | $7,500.00 | $3,987.87 |
| 47 | Catch basin, no. 3A (611E98180) | EACH | 11 | $6,000.00 | $5,225.00 | $3,675.82 | $6,000.00 | $3,925.35 |
| 48 | Catch basin, no. 3A, as per plan (611E98181) | EACH | 4 | $7,500.00 | $11,000 | $7,262.87 | $11,000 | $5,540.62 |
| 49 | Catch basin, no. 6 (611E98370) | EACH | 4 | $6,000.00 | $4,500.00 | $3,207.22 | $6,000.00 | $3,152.79 |
| 50 | Catch basin, no. 2-2C (611E98504) | EACH | 1 | $3,000.00 | $4,700.00 | $2,954.31 | $4,500.00 | $4,529.34 |
| 51 | Catch basin adjusted to grade (611E98630) | EACH | 3 | $1,000.00 | $1,050.00 | $694.65 | $1,250.00 | $1,488.92 |
| 52 | Manhole, no. 3 (611E99574) | EACH | 1 | $6,000.00 | $8,100.00 | $5,043.07 | $6,250.00 | $4,705.83 |
| 53 | Manhole adjusted to grade (611E99654) | EACH | 36 | $1,000.00 | $800.00 | $687.27 | $1,500.00 | $1,636.59 |
| 55 | Pavement planing, asphalt concrete, 3" (254E01000) | SY | 6,531 | $13.75 | $14.00 | $8.06 | $12.00 | $12.50 |
| 56 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 931 | $341.00 | $347.00 | $310.00 | $350.00 | $310.00 |
| 57 | Aggregate base (304E20000) | CY | 1,000 | $100.00 | $128.00 | $166.65 | $150.00 | $155.87 |
| 58 | Non-tracking tack coat (407E20000) | GAL | 1,698 | $5.50 | $6.00 | $5.00 | $3.50 | $5.00 |
| 59 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 424 | $325.00 | $330.00 | $424.00 | $340.00 | $295.00 |
| 60 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 591 | $380.00 | $386.00 | $345.00 | $380.00 | $345.00 |
| 61 | 7" non-reinforced concrete pavement, class QC 1P (452E11010) | SY | 67 | $150.00 | $185.00 | $101.11 | $92.00 | $104.55 |
| 62 | Curb, type 6 (609E26000) | FT | 3,696 | $37.50 | $35.00 | $31.57 | $30.00 | $32.95 |
| 63 | Fire hydrant extended and adjusted to grade (638E10300) | EACH | 8 | $9,000.00 | $875.00 | $1,692.03 | $2,500.00 | $2,540.41 |
| 64 | Valve box adjusted to grade (638E10800) | EACH | 52 | $100.00 | $250.00 | $153.82 | $750.00 | $1,112.97 |
| 65 | Special - cut and plug existing 16" water line, PE (638E20886) | EACH | 14 | $1,500.00 | $2,000.00 | $2,952.64 | $5,000.00 | $4,920.60 |
| 66 | Ground mounted support, no. 3 post (630E03100) | FT | 408 | $16.00 | $16.25 | $17.91 | $18.00 | $17.91 |
| 67 | Sign post reflector (630E08600) | EACH | 2 | $60.00 | $61.50 | $72.90 | $73.00 | $72.90 |
| 68 | Sign, flat sheet (630E80100) | SF | 182 | $18.00 | $18.00 | $20.73 | $21.00 | $20.73 |
| 69 | Sign, double faced, street name (630E80500) | EACH | 6 | $135.00 | $140.00 | $177.45 | $177.50 | $177.45 |
| 70 | Removal of ground mounted sign and disposal (630E84900) | EACH | 39 | $11.00 | $11.50 | $17.02 | $18.00 | $17.02 |
| 71 | Removal of ground mounted post support and disposal (630E86002) | EACH | 25 | $16.00 | $17.00 | $22.70 | $22.70 | $22.70 |
| 72 | Signing, misc.: solar powered rectangular rapid FL (630E97700) | EACH | 2 | $7,828.00 | $8,800.00 | $7,117.50 | $7,800.00 | $7,800.00 |
| 73 | Removal of pavement marking (642E30000) | FT | 775 | $6.60 | $6.75 | $1.70 | $1.70 | $1.70 |
| 74 | Removal of pavement marking (642E30020) | EACH | 9 | $70.00 | $72.00 | $145.00 | $145.00 | $145.00 |
| 75 | Edge line, 4" (644E00100) | MI | 0.11 | $4,229.00 | $4,300.00 | $5,335.00 | $5,500.00 | $5,335.00 |
| 76 | Lane line, 4" (644E00200) | MI | 0.06 | $1,793.00 | $1,825.00 | $1,415.00 | $1,450.00 | $1,415.00 |
| 77 | Center line (644E00300) | MI | 0.74 | $6,512.00 | $6,650.00 | $8,445.00 | $8,500.00 | $8,445.00 |
| 78 | Channelizing line, 8" (644E00400) | FT | 908 | $2.40 | $2.50 | $1.50 | $4.25 | $1.50 |
| 79 | Stop line (644E00500) | FT | 385 | $8.10 | $8.25 | $4.50 | $4.50 | $4.50 |
| 80 | Crosswalk line, 24" (644E00630) | FT | 1,238 | $6.50 | $6.75 | $4.25 | $4.25 | $4.25 |
| 81 | Transverse/diagonal line (644E00700) | FT | 150 | $8.10 | $8.25 | $4.25 | $4.25 | $4.25 |
| 82 | Island marking (644E00900) | SF | 51 | $5.00 | $5.00 | $4.00 | $4.00 | $4.00 |
| 83 | Railroad symbol marking (644E01000) | EACH | 2 | $566.00 | $575.00 | $450.00 | $450.00 | $450.00 |
| 84 | School symbol marking, 120" (644E01120) | EACH | 1 | $407.00 | $425.00 | $500.00 | $500.00 | $500.00 |
| 85 | Parking lot stall marking (644E01200) | FT | 64 | $3.25 | $3.50 | $3.50 | $3.50 | $3.50 |
| 86 | Lane arrow (644E01300) | EACH | 27 | $132.00 | $135.00 | $100.00 | $100.00 | $100.00 |
| 87 | Dotted line, 4" (644E01500) | FT | 107 | $3.25 | $3.50 | $1.25 | $1.25 | $1.25 |
| 88 | Yield line (644E20800) | FT | 20 | $41.00 | $45.00 | $5.50 | $5.50 | $5.50 |
| 89 | Pavement marking, misc.:DO not block intersection (644E50200) | SF | 1,732 | $3.25 | $3.50 | $4.00 | $4.00 | $4.00 |
| 90 | Conduit, 2", 725.051 (625E25408) | FT | 118 | $1.40 | $17.00 | $1.25 | $15.00 | $15.00 |
| 91 | Conduit, 3", 725.051 (625E25504) | FT | 42 | $2.60 | $22.50 | $2.39 | $20.00 | $20.00 |
| 92 | Conduit, 4", 725.051 (625E25604) | FT | 8 | $3.65 | $28.00 | $3.30 | $25.00 | $25.00 |
| 93 | Conduit, jacked or drilled, 725.052, 4" (625E25908) | FT | 145 | $71.50 | $65.00 | $65.00 | $58.00 | $58.00 |
| 94 | Conduit, misc.: bore and jack under railroad (625E25920) | FT | 55 | $71.50 | $168.00 | $209.50 | $150.00 | $150.00 |
| 95 | Trench in paved area (625E29400) | FT | 118 | $30.00 | $45.00 | $27.00 | $40.00 | $40.00 |
| 96 | Pull box, 725.06, size 4 (625E30510) | EACH | 2 | $817.00 | $1,050.00 | $742.50 | $925.00 | $925.00 |
| 97 | Pull box, 725.06, size 7 (625E30520) | EACH | 3 | $893.00 | $1,275.00 | $811.50 | $1,150.00 | $1,150.00 |
| 98 | Pull box, 725.06, size 18 (625E30530) | EACH | 1 | $1,558.00 | $2,350.00 | $1,416.00 | $2,100.00 | $2,100.00 |
| 99 | Ground rod (625E32000) | EACH | 7 | $137.50 | $308.00 | $125.00 | $305.00 | $275.00 |
| 100 | Underground warning marking tape (625E36010) | FT | 118 | $2.20 | $3.50 | $2.00 | $3.00 | $3.00 |
| 101 | Sign hanger assembly, mast arm (630E79100) | EACH | 2 | $242.00 | $560.00 | $220.00 | $750.00 | $696.61 |
| 102 | Sign, flat sheet (630E80100) | SF | 15 | $250.00 | $252.00 | $29.42 | $30.00 | $29.42 |
| 103 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 4 | $1,320.00 | $2,184.00 | $1,200.00 | $1,950.00 | $1,950.00 |
| 104 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 2 | $550.00 | $980.00 | $500.00 | $875.00 | $875.00 |
| 105 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 2 | $742.50 | $1,008.00 | $675.00 | $900.00 | $900.00 |
| 106 | Signal cable, 2 conductor, no. 14 AWG (632E40200) | FT | 155 | $0.65 | $2.25 | $0.59 | $2.00 | $2.00 |
| 107 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 543 | $1.40 | $3.50 | $1.25 | $3.00 | $3.00 |
| 108 | Signal support foundation (632E64010) | EACH | 2 | $4,400.00 | $8,400.00 | $4,000.00 | $7,500.00 | $7,500.00 |
| 109 | Pedestal foundation (632E64020) | EACH | 3 | $1,485.00 | $1,568.00 | $1,350.00 | $1,400.00 | $1,400.00 |
| 110 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 30 | $2.40 | $11.25 | $2.20 | $10.00 | $10.00 |
| 111 | Service cable, 2 conductor, no. 4 AWG (632E69600) | FT | 100 | $4.00 | $11.25 | $3.61 | $10.00 | $10.00 |
| 112 | Power service, as per plan (632E70001) | EACH | 1 | $4,180.00 | $2,800.00 | $3,800.00 | $2,500.00 | $2,500.00 |
| 113 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 2 | $21,120 | $20,000 | $19,200 | $17,900 | $17,900 |
| 114 | Signal support, misc.: signal pole decorative clam (632E80700) | EACH | 2 | $3,439.00 | $3,250.00 | $3,126.00 | $2,900.00 | $2,900.00 |
| 115 | Pedestal, 8', transformer base, as per plan (632E89901) | EACH | 1 | $1,375.00 | $1,100.00 | $1,250.00 | $975.00 | $975.00 |
| 116 | Removal of traffic signal installation (632E90100) | EACH | 1 | $8,800.00 | $560.00 | $8,000.00 | $500.00 | $500.00 |
| 117 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 1 | $18,150 | $18,000 | $16,500 | $15,850 | $15,850 |
| 118 | Cabinet foundation (633E67100) | EACH | 1 | $3,025.00 | $3,250.00 | $2,750.00 | $2,911.50 | $2,911.50 |
| 119 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $8,250.00 | $8,500.00 | $7,500.00 | $7,661.50 | $7,661.50 |
| 120 | Atc controller, as per plan (809E69123) | EACH | 1 | $6,000.00 | $6,725.00 | $5,500.00 | $6,000.00 | $6,000.00 |
| 121 | Railroad preemption interface, miami avenue crossi (819E10000) | EACH | 1 | $13,750 | $16,000 | $12,500 | $14,000 | $13,944 |
| 122 | Planting, misc.: trees (661E99900) | EACH | 44 | $5,800.00 | $6,275.00 | $6,705.03 | $7,000.00 | $6,327.34 |
| 123 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $100.00 | $135.00 | $95.00 | $85.00 | $167.80 |
| 124 | Detour signing (614E12420) | LS | 1 | $4,000.00 | $3,150.00 | $8,644.99 | $7,500.00 | $2,815.00 |
| 125 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.06 | $607.00 | $618.00 | $675.00 | $675.00 | $675.00 |
| 126 | Work zone center line, class I (614E21000) | MI | 0.45 | $1,366.00 | $1,400.00 | $2,200.00 | $220.00 | $2,200.00 |
| 127 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.74 | $1,366.00 | $1,400.00 | $1,900.00 | $1,900.00 | $1,900.00 |
| 128 | Work zone edge line, class I, 4" (614E22000) | MI | 0.67 | $910.00 | $928.00 | $1,530.00 | $1,600.00 | $1,530.00 |
| 129 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.12 | $910.00 | $928.00 | $1,230.00 | $1,250.00 | $1,230.00 |
| 130 | Work zone channelizing line, class I, 8" (614E23000) | FT | 145 | $0.93 | $1.00 | $0.75 | $0.75 | $0.75 |
| 131 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 919 | $0.93 | $1.00 | $0.70 | $0.70 | $0.70 |
| 132 | Work zone dotted line, class I (614E24000) | FT | 220 | $0.77 | $1.00 | $0.65 | $0.65 | $0.65 |
| 133 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 107 | $0.77 | $1.00 | $0.60 | $0.60 | $0.60 |
| 134 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 150 | $1.50 | $1.50 | $3.20 | $3.20 | $3.20 |
| 135 | Work zone stop line, class I (614E26000) | FT | 150 | $3.80 | $4.00 | $3.50 | $3.50 | $3.50 |
| 136 | Work zone stop line, class III, 642 paint (614E26610) | FT | 367 | $3.80 | $4.00 | $3.45 | $3.50 | $3.45 |
| 137 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 373 | $1.87 | $2.00 | $3.00 | $3.00 | $3.00 |
| 138 | Work zone crosswalk line, class III, 24", 642 paint (614E27260) | FT | 1,371 | $3.80 | $4.00 | $2.95 | $3.00 | $2.95 |
| 139 | Work zone arrow, class I (614E30000) | EACH | 4 | $45.00 | $46.50 | $75.00 | $75.00 | $75.00 |
| 140 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 27 | $45.00 | $46.50 | $70.00 | $70.00 | $70.00 |
| 141 | Work zone railroad symbol marking, class I (614E32000) | EACH | 3 | $148.00 | $155.00 | $300.00 | $300.00 | $300.00 |
| 142 | Work zone island marking, class III, 642 paint (614E32800) | SF | 51 | $3.00 | $3.10 | $2.95 | $3.00 | $2.95 |
| 143 | Business entrance sign (614E40050) | EACH | 17 | $250.00 | $325.00 | $214.42 | $250.00 | $214.42 |
| 144 | Water (616E10000) | MGAL | 6 | $1.00 | $200.00 | $65.32 | $50.00 | $100.39 |
| 145 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $10,000 | $5,000.00 | $8,731.96 | $5,000.00 | $5,000.00 |
| 146 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $54,000 | $82,000 | $27,469 | $20,000 | $53,486 |
| 147 | Maintaining traffic (614E11000) | LS | 1 | $115,000 | $125,000 | $179,000 | $300,000 | $422,098 |
| 148 | Construction layout stakes and surveying (623E10000) | LS | 1 | $32,000 | $28,000 | $29,850 | $75,000 | $30,961 |
| 149 | Mobilization (624E10000) | LS | 1 | $200,000 | $150,000 | $200,431 | $200,000 | $320,000 |
| 200 | Geotextile fabric (204E50000) | SY | 5,283 | $1.00 | $6.25 | $1.45 | $3.00 | $4.47 |
| 201 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $41,000 | $58,000 | $29,494 | $50,000 | $64,808 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.