ODOT contract 250420 bid tabulation
CLA-Clark Lake WLF (PARKING AREAS). Let by Ohio DOT on September 11, 2025, CLA. 4 bids received; low bid $226,563 by A & B Asphalt Corporation, -14% against the engineer's estimate of $262,000.
- Owner
- Ohio DOT
- Letting
- 11 SEP 2025
- Pay items
- 15
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A & B Asphalt Corporation | $226,563 | Low | -14% |
| 2 | M O Bryant Paving LLC DBA Breck'S Paving | $235,589 | +4.0% | -10% |
| 3 | Shelly Company | $240,128 | +6.0% | -8.0% |
| 4 | Fillmore Construction | $248,826 | +10% | -5.0% |
Engineer's estimate: $262,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A & B Asphalt Corporation | 2. M O Bryant Paving LLC DBA Breck'S Paving | 3. Shelly Company | 4. Fillmore Construction |
|---|---|---|---|---|---|---|---|
| 1 | Special - parking block removed and reset (202E53010) | EACH | 31 | $135.00 | $45.00 | $100.00 | $100.00 |
| 2 | Special - concrete parking block (690E50500) | EACH | 5 | $311.00 | $125.00 | $275.00 | $200.00 |
| 3 | Pavement planing, asphalt concrete, 1 1/2" (254E01000) | SY | 15,489 | $3.00 | $2.72 | $2.50 | $2.00 |
| 4 | Non-tracking tack coat (407E20000) | GAL | 1,317 | $3.00 | $5.22 | $3.00 | $3.00 |
| 5 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 645 | $215.75 | $250.12 | $230.00 | $240.00 |
| 6 | Compacted aggregate (617E10100) | CY | 83.20 | $145.00 | $105.05 | $135.00 | $500.00 |
| 7 | Edge line, 6", type 1 (642E00104) | MI | 0.03 | $20,000 | $5,833.33 | $5,500.00 | $5,500.00 |
| 8 | Stop line, type 1 (642E00500) | FT | 68 | $5.00 | $7.43 | $7.00 | $7.00 |
| 9 | Transverse/diagonal line, type 1 (642E00700) | FT | 60 | $2.00 | $2.67 | $2.50 | $2.50 |
| 10 | Parking lot stall marking, type 1, as per plan (642E01201) | FT | 2,416 | $1.96 | $1.06 | $1.00 | $1.00 |
| 11 | Lane arrow, type 1 (642E01300) | EACH | 4 | $115.00 | $121.25 | $115.00 | $115.00 |
| 12 | Handicap symbol marking, type 1 (642E01702) | EACH | 2 | $110.00 | $125.00 | $115.00 | $115.00 |
| 13 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,556.25 | $4,735.00 | $2,000.00 | $2,500.00 |
| 14 | Maintaining traffic (614E11000) | LS | 1 | $6,167.83 | $2,500.00 | $12,500 | $2,000.00 |
| 15 | Mobilization (624E10000) | LS | 1 | $4,982.78 | $3,125.00 | $15,000 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.