ODOT contract 250407 bid tabulation
CUY-Eastland Rd/SR 237 Signal (SIGNALIZATION). Let by Ohio DOT on September 11, 2025, CUY. 3 bids received; low bid $108,285 by Perram Electric Inc, +3.1% against the engineer's estimate of $105,000.
- Owner
- Ohio DOT
- Letting
- 11 SEP 2025
- Pay items
- 41
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Perram Electric Inc | $108,285 | Low | +3.0% |
| 2 | Miller Cable Company | $121,536 | +12% | +16% |
| 3 | Ruhlin Company | $134,712 | +24% | +28% |
Engineer's estimate: $105,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Perram Electric Inc | 2. Miller Cable Company | 3. Ruhlin Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100.00 | $100.00 | $450.00 |
| 2 | Topsoil (659E00300) | CY | 43 | $58.50 | $75.00 | $85.00 |
| 3 | Seeding and mulching (659E10000) | SY | 382 | $1.50 | $9.50 | $1.00 |
| 4 | Repair seeding and mulching (659E14000) | SY | 20 | $1.50 | $4.50 | $1.00 |
| 5 | Inter-seeding (659E15000) | SY | 20 | $1.50 | $0.25 | $1.00 |
| 6 | Commercial fertilizer (659E20000) | TON | 0.06 | $2,000.00 | $550.00 | $500.00 |
| 7 | Lime (659E31000) | ACRE | 0.08 | $625.00 | $100.00 | $100.00 |
| 8 | Water (659E35000) | MGAL | 3 | $10.00 | $50.00 | $20.00 |
| 9 | Erosion control (832E30000) | EACH | 1,244 | $1.00 | $1.00 | $1.00 |
| 10 | Sign attachment assembly, mast arm (630E79200) | EACH | 2 | $331.00 | $1,875.00 | $550.00 |
| 11 | Sign, flat sheet (630E80100) | SF | 10 | $32.90 | $48.00 | $65.00 |
| 12 | Edge line, 4", type 1 (642E00100) | MI | 0.03 | $22,000 | $7,225.00 | $22,000 |
| 13 | Center line, type 1 (642E00300) | MI | 0.05 | $25,000 | $12,020 | $25,000 |
| 14 | Channelizing line, 8", type 1 (642E00400) | FT | 118 | $3.80 | $6.30 | $3.80 |
| 15 | Stop line, type 1 (642E00500) | FT | 71 | $14.00 | $9.05 | $14.00 |
| 16 | Lane arrow, type 1 (642E01300) | EACH | 4 | $100.00 | $165.00 | $100.00 |
| 17 | Removal of pavement marking (642E30000) | FT | 52 | $39.00 | $19.30 | $39.00 |
| 18 | Removal of pavement marking (642E30020) | EACH | 2 | $500.00 | $535.00 | $500.00 |
| 19 | Conduit, 2", 725.051 (625E25408) | FT | 182 | $12.45 | $13.00 | $15.00 |
| 20 | Trench (625E29000) | FT | 182 | $14.20 | $15.00 | $15.00 |
| 21 | Pull box, 725.08, 24" (625E30706) | EACH | 1 | $2,095.00 | $1,500.00 | $2,150.00 |
| 22 | Ground rod (625E32000) | EACH | 1 | $320.00 | $300.00 | $525.00 |
| 23 | Underground warning marking tape (625E36010) | FT | 182 | $1.25 | $2.60 | $5.00 |
| 24 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 2 | $907.00 | $1,400.00 | $1,695.00 |
| 25 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 213 | $3.70 | $3.50 | $7.00 |
| 26 | Signal support foundation (632E64010) | EACH | 1 | $6,185.00 | $7,200.00 | $9,485.00 |
| 27 | Test hole performed (632E64950) | EACH | 1 | $300.00 | $400.00 | $250.00 |
| 28 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $15,175 | $12,300 | $17,590 |
| 29 | Signalization, misc.: install louvers on existing (632E90400) | EACH | 9 | $262.00 | $400.00 | $550.00 |
| 30 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $10,505 | $7,900.00 | $9,250.00 |
| 31 | Railroad preemption interface, SP-5 (819E10000) | EACH | 1 | $12,560 | $11,750 | $16,500 |
| 34 | Stop line radar detection, as per plan (809E69101) | EACH | 1 | $9,045.00 | $9,000.00 | $11,700 |
| 35 | Atc controller, as per plan (809E69123) | EACH | 1 | $4,665.00 | $5,200.00 | $8,600.00 |
| 36 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $80.00 | $75.00 | $100.00 |
| 37 | Railroad flagging services (900E00100) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 38 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $5,000.00 | $8,500.00 |
| 39 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $2,573.20 | $500.00 | $800.00 |
| 40 | Maintaining traffic (614E11000) | LS | 1 | $3,000.00 | $18,500 | $2,862.00 |
| 41 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1,860.00 | $1,640.00 | $500.00 |
| 42 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,580.00 | $1,180.00 | $500.00 |
| 43 | Mobilization (624E10000) | LS | 1 | $4,000.00 | $2,000.00 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.