ODOT contract 250556 bid tabulation
GEA-/LAK-SR 44-18.39/00.00 Rehab (MINOR RECONSTRUCTION). Let by Ohio DOT on December 4, 2025, GEA. 3 bids received; low bid $10,575,000 by Karvo Companies Inc, +8.0% against the engineer's estimate of $9,790,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 207
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Karvo Companies Inc | $10,575,000 | Low | +8.0% |
| 2 | Ronyak Paving Inc | $11,461,970 | +8.0% | +17% |
| 3 | S E T Inc | $12,483,651 | +18% | +28% |
Engineer's estimate: $9,790,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Karvo Companies Inc | 2. Ronyak Paving Inc | 3. S E T Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $100,000 | $8,500.00 | $30,000 |
| 2 | Headwall removed (202E20010) | EACH | 11 | $350.00 | $1,821.00 | $600.00 |
| 3 | Pavement removed (202E23000) | SY | 7,657 | $12.00 | $25.00 | $18.00 |
| 4 | Walk removed (202E30000) | SF | 1,015 | $2.50 | $9.50 | $4.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 200 | $15.00 | $48.50 | $20.00 |
| 6 | Guardrail removed (202E38000) | FT | 1,024 | $3.00 | $2.00 | $5.00 |
| 7 | Excavation (203E10000) | CY | 8,845 | $25.00 | $36.50 | $22.00 |
| 8 | Embankment (203E20000) | CY | 4,873 | $20.00 | $32.30 | $22.00 |
| 9 | Subgrade compaction (204E10000) | SY | 14,763 | $1.00 | $3.00 | $2.00 |
| 10 | Excavation of subgrade (204E13000) | CY | 4,830 | $25.00 | $33.50 | $28.00 |
| 11 | Granular material, type C (204E30020) | CY | 4,830 | $75.00 | $62.80 | $100.00 |
| 12 | Proof rolling (204E45000) | HR | 8 | $500.00 | $250.00 | $250.00 |
| 13 | Geotextile fabric (204E50000) | SY | 8,936 | $2.50 | $5.30 | $2.00 |
| 14 | Ditch cleanout (209E10000) | FT | 20 | $40.00 | $66.30 | $20.00 |
| 15 | Reshaping under guardrail, as per plan (209E15001) | STA | 63 | $149.00 | $155.00 | $175.00 |
| 16 | Linear grading, as per plan (209E60201) | STA | 480 | $45.00 | $1,201.00 | $125.00 |
| 17 | Preparing subgrade for shoulder paving, as per plan (209E72001) | STA | 480 | $25.00 | $35.06 | $110.00 |
| 18 | Guardrail, type MGS (606E15050) | FT | 1,563 | $21.00 | $19.00 | $20.00 |
| 19 | Guardrail, type MGS half post spacing (606E15150) | FT | 100 | $33.80 | $32.40 | $34.00 |
| 20 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,675.00 | $2,695.00 | $3,000.00 |
| 21 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,450.00 | $1,445.00 | $1,600.00 |
| 22 | Fence, misc.: wood fence (607E98000) | FT | 50 | $88.00 | $83.50 | $85.00 |
| 23 | Curb ramp, as per plan (608E52001) | SF | 560 | $15.00 | $35.00 | $25.00 |
| 24 | Monument assembly, type C (623E38500) | EACH | 4 | $1,500.00 | $1,150.00 | $1,300.00 |
| 25 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 4 | $1,000.00 | $1,150.00 | $750.00 |
| 26 | Monument assembly reconstructed to grade (623E39600) | EACH | 2 | $1,000.00 | $1,425.00 | $1,250.00 |
| 27 | Right-of-way monument, type B (623E40520) | EACH | 18 | $250.00 | $1,400.00 | $400.00 |
| 28 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $8,000.00 | $7,150.00 | $8,000.00 |
| 29 | Post construction survey monument verification and report (623E51000) | LS | 1 | $8,000.00 | $7,150.00 | $8,000.00 |
| 30 | Special - mailbox support (690E50000) | EACH | 2 | $350.00 | $260.00 | $350.00 |
| 31 | Special - survey control verification (690E98400) | LS | 1 | $8,000.00 | $5,000.00 | $10,000 |
| 32 | Rock channel protection, type A with geotextile fabric (601E32004) | CY | 24 | $300.00 | $172.50 | $350.00 |
| 33 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 9 | $300.00 | $198.50 | $325.00 |
| 34 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 4 | $500.00 | $313.00 | $400.00 |
| 35 | Soil analysis test (659E00100) | EACH | 2 | $25.00 | $25.00 | $200.00 |
| 36 | Topsoil (659E00300) | CY | 2,968 | $35.00 | $48.00 | $85.00 |
| 37 | Seeding and mulching (659E10000) | SY | 21,175 | $1.50 | $1.00 | $2.00 |
| 38 | Repair seeding and mulching (659E14000) | SY | 1,059 | $1.00 | $1.00 | $1.00 |
| 39 | Inter-seeding (659E15000) | SY | 1,059 | $0.01 | $1.00 | $1.00 |
| 40 | Commercial fertilizer (659E20000) | TON | 2.94 | $250.00 | $250.00 | $550.00 |
| 41 | Lime (659E31000) | ACRE | 4.39 | $25.00 | $25.00 | $50.00 |
| 42 | Water (659E35000) | MGAL | 119 | $0.05 | $1.00 | $10.00 |
| 43 | Mowing (659E40000) | MSF | 49 | $1.00 | $1.00 | $125.00 |
| 44 | Slope erosion protection (670E00500) | SY | 5,533 | $1.45 | $2.00 | $3.00 |
| 45 | Storm water pollution prevention plan (832E15000) | LS | 1 | $25,000 | $6,500.00 | $6,500.00 |
| 46 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $35,000 | $35,000 | $18,000 |
| 47 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $25,000 | $25,000 | $30,000 |
| 48 | Erosion control (832E30000) | EACH | 465,000 | $1.00 | $1.00 | $1.00 |
| 49 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $10,000 | $25,000 | $13,000 |
| 50 | Type 2 waterproofing, as per plan (512E55901) | LS | 1 | $2,250.00 | $15,000 | $6,000.00 |
| 51 | Concrete masonry (602E20000) | CY | 2.50 | $2,500.00 | $7,351.00 | $3,200.00 |
| 52 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 2,977 | $18.00 | $21.00 | $18.00 |
| 53 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 361 | $18.00 | $25.00 | $18.00 |
| 54 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 8,422 | $18.00 | $24.50 | $18.00 |
| 55 | Aggregate drains (605E31100) | FT | 409 | $25.00 | $21.00 | $18.00 |
| 56 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 386 | $25.00 | $20.00 | $30.00 |
| 57 | 6" conduit, type B (611E00900) | FT | 186 | $52.00 | $30.80 | $35.00 |
| 58 | 6" conduit, type F (611E01500) | FT | 20 | $50.00 | $41.30 | $25.00 |
| 59 | 12" conduit, type C (611E04600) | FT | 97 | $145.00 | $109.30 | $95.00 |
| 60 | 12" conduit, type D (611E04900) | FT | 70 | $110.00 | $80.30 | $90.00 |
| 61 | 15" conduit, type D (611E06400) | FT | 40 | $135.00 | $103.30 | $100.00 |
| 62 | 24" conduit, type A (611E10200) | FT | 96 | $235.00 | $257.30 | $225.00 |
| 63 | 36" conduit, type A (611E16200) | FT | 10 | $700.00 | $639.50 | $600.00 |
| 64 | Catch basin, no. 3A (611E98180) | EACH | 1 | $3,000.00 | $6,231.50 | $3,500.00 |
| 65 | Catch basin adjusted to grade (611E98630) | EACH | 1 | $1,250.00 | $1,489.30 | $1,200.00 |
| 66 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $1,250.00 | $6,205.80 | $2,200.00 |
| 67 | Manhole reconstructed to grade (611E99660) | EACH | 2 | $1,500.00 | $1,873.00 | $4,500.00 |
| 68 | Precast reinforced concrete outlet (611E99710) | EACH | 19 | $150.00 | $227.80 | $400.00 |
| 69 | Special - miscellaneous metal (611E99820) | LB | 1,500 | $3.00 | $4.00 | $6.00 |
| 70 | Patching concrete structures with trowelable mortar, as per plan (843E50001) | SF | 12 | $300.00 | $435.80 | $125.00 |
| 71 | Partial depth pavement repair (441) (251E01000) | SY | 2,190 | $60.00 | $55.00 | $92.00 |
| 72 | Pavement planing, asphalt concrete (T=1.5") (254E01000) | SY | 4,249 | $3.50 | $2.00 | $8.00 |
| 73 | Pavement planing, asphalt concrete (T=3.25") (254E01000) | SY | 79,547 | $1.75 | $1.50 | $4.00 |
| 74 | Pavement planing, asphalt concrete, as per plan(VA (254E01001) | SY | 3,458 | $6.00 | $2.00 | $9.00 |
| 75 | Full depth pavement removal and rigid replacement, type 1, class QC RS, as per plan (255E19001) | SY | 2,190 | $225.00 | $200.00 | $225.00 |
| 76 | Full depth pavement sawing (255E20000) | FT | 440 | $5.00 | $5.00 | $15.00 |
| 77 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,207 | $205.00 | $200.00 | $225.00 |
| 78 | Aggregate base (304E20000) | CY | 2,415 | $75.00 | $80.00 | $95.00 |
| 79 | Non-tracking tack coat (407E20000) | GAL | 13,403 | $2.25 | $3.00 | $3.00 |
| 80 | Asphalt concrete surface course, type 1, (446), as per plan (441E10101) | CY | 4,303 | $240.00 | $225.00 | $255.00 |
| 81 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 4,663 | $200.00 | $190.00 | $205.00 |
| 82 | Asphalt concrete intermediate course, type 1, (449), as per plan (441E70201) | CY | 200 | $275.00 | $350.00 | $255.00 |
| 83 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 5 | $475.00 | $700.00 | $1,400.00 |
| 84 | Asphalt concrete intermediate course, type 1, (449), (under guardrail), as per plan (441E70801) | CY | 295 | $300.00 | $425.00 | $430.00 |
| 85 | Curb, type 6 (609E26000) | FT | 237 | $50.00 | $105.00 | $55.00 |
| 86 | Compacted aggregate, as per plan (617E10101) | CY | 823 | $100.00 | $95.00 | $115.00 |
| 87 | Special - pavement overlay fabric composite (690E12060) | SY | 2,909 | $29.00 | $28.85 | $30.00 |
| 88 | Asphalt concrete surface course, type 1, (448) (823E10000) | CY | 3 | $1,200.00 | $1,000.00 | $4,200.00 |
| 89 | Longitudinal joint preparation (874E20000) | FT | 24,940 | $1.50 | $0.50 | $1.55 |
| 90 | Fire hydrant extended and adjusted to grade (638E10300) | EACH | 1 | $6,000.00 | $5,000.00 | $4,000.00 |
| 91 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 8 | $1,000.00 | $1,000.00 | $1,600.00 |
| 92 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 6.69 | $1,300.00 | $1,300.00 | $2,200.00 |
| 93 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 3.69 | $1,300.00 | $1,300.00 | $4,200.00 |
| 94 | Delineator, post ground mounted (620E00500) | EACH | 118 | $75.00 | $61.27 | $80.00 |
| 95 | Removal of delineator (620E31200) | EACH | 92 | $15.00 | $24.61 | $10.00 |
| 96 | RPM (621E00100) | EACH | 400 | $37.60 | $37.60 | $50.00 |
| 97 | Raised pavement marker removed (621E54000) | EACH | 282 | $1.00 | $1.00 | $30.00 |
| 98 | Barrier reflector, type 2 , bidirectional (626E00110) | EACH | 18 | $15.00 | $13.50 | $30.00 |
| 99 | Ground mounted support, no. 2 post (630E02100) | FT | 705.60 | $15.25 | $14.30 | $15.00 |
| 100 | Ground mounted support, no. 3 post (630E03100) | FT | 707.10 | $15.75 | $16.31 | $17.00 |
| 101 | Ground mounted support, no. 4 post, as per plan (630E04101) | FT | 12.50 | $30.00 | $22.81 | $24.00 |
| 102 | Sign post reflector (630E08600) | EACH | 11 | $40.00 | $68.13 | $70.00 |
| 103 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 8 | $550.00 | $446.54 | $450.00 |
| 104 | Sign support assembly, pole mounted (630E79500) | EACH | 8 | $150.00 | $111.00 | $115.00 |
| 105 | Sign, flat sheet (630E80100) | SF | 831.10 | $22.50 | $19.36 | $20.00 |
| 106 | Removal of ground mounted sign and disposal (630E84900) | EACH | 123 | $25.00 | $17.48 | $18.00 |
| 107 | Removal of ground mounted sign and disposal, as per plan (630E84901) | EACH | 2 | $500.00 | $168.57 | $175.00 |
| 108 | Removal of ground mounted sign and reerection (630E85100) | EACH | 8 | $100.00 | $79.00 | $80.00 |
| 109 | Removal of ground mounted post support and disposal (630E86002) | EACH | 111 | $25.00 | $23.31 | $24.00 |
| 110 | Removal of ground mounted post support and reerection (630E86010) | EACH | 1 | $100.00 | $134.76 | $140.00 |
| 111 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 2 | $250.00 | $17.57 | $18.00 |
| 112 | Removal of pole mounted sign and disposal (630E87500) | EACH | 2 | $100.00 | $17.48 | $18.00 |
| 113 | School speed limit sign assembly, solar-powered, as per plan (631E93241) | EACH | 1 | $8,949.60 | $7,418.43 | $8,500.00 |
| 114 | Removal, misc.: removal of ground mounted school F (631E94490) | EACH | 1 | $992.25 | $326.84 | $1,100.00 |
| 115 | Edge line, 6" (646E10010) | MI | 9.10 | $2,850.00 | $3,105.00 | $3,200.00 |
| 116 | Center line (646E10200) | MI | 5.58 | $3,685.00 | $3,300.00 | $3,400.00 |
| 117 | Channelizing line, 8" (646E10300) | FT | 2,360 | $2.00 | $1.25 | $1.25 |
| 118 | Stop line (646E10400) | FT | 432 | $12.50 | $10.15 | $11.00 |
| 119 | Crosswalk line, 24", as per plan (646E10521) | FT | 94 | $12.50 | $9.75 | $11.00 |
| 120 | Transverse/diagonal line (646E10600) | FT | 1,583 | $8.50 | $9.65 | $11.00 |
| 121 | Chevron marking (646E10620) | FT | 58 | $8.50 | $9.65 | $11.00 |
| 122 | Island marking (646E10800) | SF | 57 | $10.00 | $8.50 | $9.00 |
| 123 | School symbol marking, 72" (646E20100) | EACH | 1 | $575.00 | $500.00 | $550.00 |
| 124 | Lane arrow (646E20300) | EACH | 39 | $165.00 | $200.00 | $225.00 |
| 125 | 4" conduit, type E (611E00400) | FT | 160 | $3.17 | $3.17 | $20.00 |
| 126 | Conduit, 2", 725.04 (625E25400) | FT | 299 | $19.52 | $19.52 | $20.00 |
| 127 | Conduit, 3", 725.04 (625E25500) | FT | 118 | $32.23 | $32.23 | $40.00 |
| 128 | Conduit, 4", 725.04 (625E25600) | FT | 64 | $43.05 | $43.05 | $50.00 |
| 129 | Conduit, jacked or drilled, 4" (625E25900) | FT | 620 | $97.71 | $97.71 | $40.00 |
| 130 | Trench (625E29000) | FT | 398 | $11.09 | $11.09 | $20.00 |
| 131 | Pull box, 725.06, size 4 (625E30510) | EACH | 1 | $1,803.00 | $1,803.00 | $1,000.00 |
| 132 | Pull box, 725.08, 24" (625E30706) | EACH | 10 | $1,294.50 | $1,294.00 | $1,500.00 |
| 133 | Ground rod (625E32000) | EACH | 16 | $190.50 | $190.50 | $250.00 |
| 134 | Underground warning marking tape (625E36010) | FT | 398 | $1.85 | $1.85 | $2.00 |
| 135 | Arc flash calculations and label, traffic signal C (625E76000) | EACH | 2 | $2,058.00 | $2,058.00 | $1,000.00 |
| 136 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 16 | $1,151.10 | $1,151.10 | $1,200.00 |
| 137 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 11 | $1,966.91 | $1,966.91 | $2,000.00 |
| 138 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 2 | $790.50 | $790.50 | $750.00 |
| 139 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 2 | $918.00 | $918.00 | $850.00 |
| 140 | Covering of vehicular signal head (632E25000) | EACH | 27 | $32.30 | $32.30 | $60.00 |
| 141 | Covering of pedestrian signal head (632E25010) | EACH | 2 | $57.30 | $57.30 | $50.00 |
| 142 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 358 | $6.38 | $6.38 | $4.00 |
| 143 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 3,529 | $6.95 | $6.95 | $4.00 |
| 144 | Signal support foundation, as per plan (632E64011) | EACH | 8 | $5,898.00 | $5,898.00 | $9,000.00 |
| 145 | Pedestal foundation (632E64020) | EACH | 3 | $1,524.00 | $1,524.00 | $1,200.00 |
| 146 | Loop detector lead-in cable (632E65200) | FT | 2,038 | $0.74 | $0.74 | $2.00 |
| 147 | Power cable, 2 conductor, no. 4 AWG (632E69200) | FT | 825 | $1.22 | $1.22 | $6.00 |
| 148 | Power service, as per plan (632E70001) | EACH | 2 | $4,425.00 | $4,425.00 | $3,500.00 |
| 149 | Conduit riser, 2" diameter (632E70400) | EACH | 2 | $1,136.25 | $1,136.25 | $900.00 |
| 150 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 2 | $12,355 | $12,355 | $13,000 |
| 151 | Signal support, type TC-81.22, design 12, as per plan (632E72131) | EACH | 2 | $15,925 | $15,925 | $17,000 |
| 152 | Signal support, type TC-81.22, design 13, as per plan (632E72141) | EACH | 3 | $18,409 | $18,409 | $23,000 |
| 153 | Signal support, type TC-81.22, design 14, as per plan (632E72151) | EACH | 1 | $20,556 | $20,566 | $27,000 |
| 154 | Pedestal, 8', transformer base (632E89900) | EACH | 1 | $1,354.05 | $1,354.05 | $1,000.00 |
| 155 | Pedestal, 15', transformer base (632E90008) | EACH | 2 | $2,295.00 | $2,295.00 | $2,500.00 |
| 156 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $7,957.50 | $7,957.50 | $5,500.00 |
| 157 | Signalization, misc.: accessible pedestrian pushbu (632E90400) | EACH | 1 | $4,088.55 | $4,088.55 | $3,500.00 |
| 158 | Cabinet, type 332, as per plan (633E65521) | EACH | 2 | $21,314 | $21,314 | $23,000 |
| 159 | Cabinet foundation, as per plan (633E67101) | EACH | 2 | $2,187.00 | $2,178.00 | $2,500.00 |
| 160 | Controller work pad, as per plan (633E67201) | EACH | 2 | $2,130.00 | $2,130.00 | $500.00 |
| 161 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 2 | $10,002 | $10,002 | $10,000 |
| 162 | Advance radar detection, as per plan (809E69001) | EACH | 4 | $9,921.00 | $9,921.00 | $11,000 |
| 163 | Stop line radar detection, as per plan (809E69101) | EACH | 8 | $9,921.00 | $9,921.00 | $11,000 |
| 164 | Atc controller, as per plan (809E69123) | EACH | 2 | $8,871.00 | $8,871.00 | $10,000 |
| 165 | Emergency vehicle preemption, as per plan (809E69201) | EACH | 2 | $3,315.00 | $3,315.00 | $850.00 |
| 166 | Preempt receiving unit (809E69210) | EACH | 8 | $717.00 | $717.00 | $1,000.00 |
| 167 | Preempt detector cable (809E69220) | FT | 1,850 | $1.95 | $1.95 | $3.00 |
| 168 | Preempt phase selector (809E69230) | EACH | 2 | $6,289.20 | $6,289.20 | $3,500.00 |
| 169 | Preempt confirmation light, as per plan (809E69241) | EACH | 8 | $764.85 | $764.85 | $450.00 |
| 170 | Excavation of subgrade (204E13000) | CY | 100 | $75.00 | $85.00 | $30.00 |
| 171 | Granular material, type A (204E30000) | CY | 100 | $100.00 | $75.00 | $95.00 |
| 172 | Stabilized crushed aggregate (411E10000) | CY | 648 | $75.00 | $115.00 | $100.00 |
| 173 | Temporary asphalt concrete walk (608E21200) | SF | 932 | $2.00 | $5.00 | $22.00 |
| 174 | Catch basin, no. 2-2B, as per plan (611E98471) | EACH | 1 | $2,500.00 | $5,997.80 | $5,500.00 |
| 175 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 120 | $125.00 | $125.00 | $110.00 |
| 176 | Special - work zone traffic signal (614E11300) | EACH | 1 | $17,520 | $17,520 | $85,000 |
| 177 | Increased barrier delineation (614E11630) | FT | 1,106 | $1.75 | $2.50 | $3.00 |
| 178 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 42 | $2,340.00 | $1,745.00 | $1,800.00 |
| 179 | Detour signing (614E12420) | LS | 1 | $15,000 | $20,000 | $15,000 |
| 180 | Asphalt concrete for maintaining traffic (614E13000) | CY | 100 | $275.00 | $125.00 | $300.00 |
| 181 | Barrier reflector, type 1(one-way) (614E13310) | EACH | 319 | $15.00 | $9.56 | $16.00 |
| 182 | Object marker, one way (614E13350) | EACH | 319 | $20.00 | $19.65 | $16.00 |
| 183 | Portable changeable message sign, as per plan (614E18601) | SNMT | 36 | $1,000.00 | $965.72 | $1,000.00 |
| 184 | Work zone center line, class I, 642 paint (614E21100) | MI | 19.27 | $1,150.00 | $1,700.00 | $1,800.00 |
| 185 | Work zone center line, class III, 642 paint (614E21550) | MI | 5.58 | $1,150.00 | $1,025.00 | $1,100.00 |
| 186 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 14.51 | $850.00 | $1,220.00 | $1,300.00 |
| 187 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 5,268 | $0.55 | $0.90 | $1.00 |
| 188 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 2,360 | $0.55 | $0.85 | $1.00 |
| 189 | Work zone dotted line, class I, 4", 642 paint (614E24200) | FT | 243 | $0.50 | $0.80 | $1.00 |
| 190 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 421 | $4.00 | $4.25 | $5.00 |
| 191 | Work zone stop line, class I, 642 paint (614E26200) | FT | 1,557 | $3.75 | $4.50 | $5.00 |
| 192 | Work zone stop line, class III, 642 paint (614E26610) | FT | 432 | $3.75 | $4.45 | $5.00 |
| 193 | Work zone crosswalk line, class I, 24", 642 paint (614E27060) | FT | 110 | $3.75 | $4.40 | $5.00 |
| 194 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 11 | $50.00 | $85.00 | $100.00 |
| 195 | Work zone school symbol marking, 72", class I, 642 paint (614E31720) | EACH | 4 | $250.00 | $400.00 | $450.00 |
| 196 | Work zone school symbol marking, 72", class III, 6 (614E31740) | EACH | 1 | $250.00 | $390.00 | $450.00 |
| 197 | Roads for maintaining traffic (615E10000) | LS | 1 | $450,000 | $75,000 | $550,000 |
| 198 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 12,665 | $50.00 | $80.00 | $105.00 |
| 199 | Water (616E10000) | MGAL | 105 | $1.00 | $10.00 | $40.00 |
| 200 | Portable barrier, unanchored (622E41100) | FT | 13,263 | $20.00 | $23.25 | $25.00 |
| 201 | Portable barrier, anchored (622E41110) | FT | 130 | $75.00 | $28.75 | $30.00 |
| 202 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $100,000 | $54,000 | $90,000 |
| 203 | CPM progress schedule (108E10000) | LS | 1 | $35,000 | $45,000 | $8,000.00 |
| 204 | Maintaining traffic (614E11000) | LS | 1 | $900,000 | $945,000 | $1,100,000 |
| 205 | Field office, type C, as per plan (619E16021) | MNTH | 24 | $4,000.00 | $4,500.00 | $2,200.00 |
| 206 | Construction layout stakes and surveying (623E10000) | LS | 1 | $225,000 | $105,000 | $250,000 |
| 207 | Mobilization (624E10000) | LS | 1 | $649,611 | $825,000 | $500,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.