ODOT contract 250436 bid tabulation
GEA-SR 87-02.73 (TWO LANE RESURFACING). Let by Ohio DOT on September 25, 2025, GEA. 6 bids received; low bid $1,361,400 by Ronyak Paving Inc, -13% against the engineer's estimate of $1,567,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 49
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ronyak Paving Inc | $1,361,400 | Low | -13% |
| 2 | Kokosing Construction Company Inc | $1,584,401 | +16% | +1.0% |
| 3 | Karvo Companies Inc | $1,725,455 | +27% | +10% |
| 4 | Shelly & Sands Inc | $1,739,143 | +28% | +11% |
| 5 | Phillips Paving LLC | $1,829,493 | +34% | +17% |
| 6 | Barbicas Construction Company Inc | $1,906,787 | +40% | +22% |
Engineer's estimate: $1,567,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ronyak Paving Inc | 2. Kokosing Construction Company Inc | 3. Karvo Companies Inc | 4. Shelly & Sands Inc | 5. Phillips Paving LLC | 6. Barbicas Construction Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (203E10000) | CY | 40 | $20.00 | $50.00 | $5.00 | $125.00 | $50.00 | $25.00 |
| 2 | Linear grading, as per plan (209E60201) | STA | 457 | $10.00 | $58.00 | $25.00 | $70.00 | $20.00 | $30.00 |
| 3 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 25 | $1,600.00 | $998.00 | $1,500.00 | $1,750.00 | $1,250.00 | $800.00 |
| 4 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 5 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 2 | $1,750.00 | $1,745.00 | $2,500.00 | $2,500.00 | $2,500.00 | $1,000.00 |
| 6 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $1,950.00 | $1,745.00 | $1,500.00 | $2,500.00 | $2,000.00 | $1,000.00 |
| 7 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $4.00 | $2.30 | $3.00 | $5.00 | $5.00 | $2.00 |
| 8 | Partial depth pavement repair (441) (251E01000) | SY | 1,100 | $80.00 | $50.00 | $65.00 | $87.00 | $60.00 | $27.00 |
| 9 | Pavement repair (253E02000) | CY | 1,250 | $100.00 | $200.00 | $300.00 | $258.00 | $275.00 | $250.00 |
| 10 | Aggregate base (304E20000) | CY | 40 | $65.00 | $75.00 | $25.00 | $100.00 | $100.00 | $70.00 |
| 11 | Non-tracking tack coat (407E20000) | GAL | 7,433 | $2.50 | $2.85 | $2.50 | $3.05 | $2.00 | $3.00 |
| 12 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 2,427 | $240.00 | $270.00 | $270.00 | $265.00 | $250.00 | $250.00 |
| 13 | Compacted aggregate, as per plan (617E10101) | CY | 283 | $125.00 | $75.00 | $125.00 | $120.00 | $100.00 | $125.00 |
| 14 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 4.66 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,000.00 | $2,700.00 |
| 15 | Longitudinal joint preparation (874E20000) | FT | 26,564 | $0.50 | $0.75 | $0.65 | $0.20 | $0.25 | $2.00 |
| 16 | Pavement planing, asphalt concrete, class A, 1" (897E01010) | SY | 87,315 | $1.50 | $1.20 | $1.90 | $2.25 | $2.50 | $4.00 |
| 17 | RPM (621E00100) | EACH | 397 | $39.00 | $41.75 | $39.00 | $42.00 | $42.00 | $44.00 |
| 18 | Raised pavement marker removed (621E54000) | EACH | 278 | $1.00 | $4.00 | $1.00 | $5.00 | $1.00 | $6.00 |
| 19 | Edge line, 6" (646E10010) | MI | 9.71 | $2,998.00 | $2,850.00 | $2,998.00 | $2,850.00 | $2,850.00 | $2,850.00 |
| 20 | Center line (646E10200) | MI | 5.03 | $3,376.00 | $3,550.00 | $3,376.00 | $3,550.00 | $3,550.00 | $3,550.00 |
| 21 | Channelizing line, 8" (646E10300) | FT | 669 | $1.61 | $1.50 | $1.61 | $1.50 | $1.50 | $1.50 |
| 22 | Stop line (646E10400) | FT | 396 | $12.50 | $12.00 | $12.50 | $12.00 | $12.00 | $12.00 |
| 23 | Crosswalk line, 12" (646E10510) | FT | 96 | $6.00 | $6.50 | $6.00 | $6.50 | $6.50 | $6.50 |
| 24 | Transverse/diagonal line (646E10600) | FT | 276 | $9.00 | $10.00 | $9.00 | $10.00 | $10.00 | $10.00 |
| 25 | Lane arrow (646E20300) | EACH | 9 | $166.00 | $175.00 | $166.00 | $175.00 | $175.00 | $175.00 |
| 26 | Special - inventory existing pavement markings (690E98400) | LS | 1 | $2,500.00 | $500.00 | $900.00 | $500.00 | $500.00 | $500.00 |
| 27 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $100.00 | $115.00 | $125.00 | $95.00 | $150.00 | $80.00 |
| 28 | Work zone marking sign (614E12460) | EACH | 6 | $75.00 | $75.00 | $125.00 | $75.00 | $75.00 | $75.00 |
| 29 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $55.00 | $125.00 | $100.00 | $350.00 | $75.00 | $200.00 |
| 30 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $900.00 | $500.00 | $1,250.00 | $900.00 | $900.00 | $900.00 |
| 31 | Work zone center line, class I, 642 paint (614E21100) | MI | 5.03 | $1,111.00 | $950.00 | $1,111.00 | $950.00 | $950.00 | $950.00 |
| 32 | Work zone center line, class III, 642 paint (614E21550) | MI | 5.03 | $990.00 | $950.00 | $990.00 | $950.00 | $950.00 | $950.00 |
| 33 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 9.71 | $670.00 | $725.00 | $670.00 | $725.00 | $725.00 | $725.00 |
| 34 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 9.71 | $600.00 | $550.00 | $600.00 | $550.00 | $550.00 | $550.00 |
| 35 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 669 | $0.65 | $0.60 | $0.68 | $0.60 | $0.60 | $0.60 |
| 36 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 669 | $0.66 | $0.60 | $0.66 | $0.60 | $0.60 | $0.60 |
| 37 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 276 | $1.50 | $3.00 | $1.50 | $3.00 | $3.00 | $3.00 |
| 38 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 276 | $1.40 | $3.00 | $1.40 | $3.00 | $3.00 | $3.00 |
| 39 | Work zone stop line, class I, 642 paint (614E26200) | FT | 396 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 40 | Work zone stop line, class III, 642 paint (614E26610) | FT | 396 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 41 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 96 | $1.20 | $2.50 | $1.20 | $2.50 | $2.50 | $2.50 |
| 42 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 96 | $1.10 | $2.50 | $1.10 | $2.50 | $2.50 | $2.50 |
| 43 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 9 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 44 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 9 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 45 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 300 | $30.00 | $30.00 | $35.00 | $30.00 | $30.00 | $30.00 |
| 46 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,491 | $6,500.00 | $9,750.00 | $8,500.00 | $40,000 | $25,000 |
| 47 | Maintaining traffic (614E11000) | LS | 1 | $57,575 | $153,917 | $104,000 | $107,345 | $150,000 | $175,000 |
| 48 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $3,500.00 | $11,900 | $2,500.00 | $10,000 | $15,000 | $1,000.00 |
| 49 | Mobilization (624E10000) | LS | 1 | $95,725 | $79,220 | $60,000 | $40,000 | $138,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.