ODOT contract 250561 bid tabulation

LAK-SR 174-04.39 (TWO LANE RESURFACING). Let by Ohio DOT on December 18, 2025, LAK. 7 bids received; low bid $747,366 by Specialized Construction Inc, -20% against the engineer's estimate of $929,000.

Owner
Ohio DOT
Letting
18 DEC 2025
Pay items
51
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Specialized Construction Inc$747,366Low-20%
2Geauga Highway Co$754,765+1.0%-19%
3Ronyak Paving Inc$907,841+21%-2.0%
4Barbicas Construction Company Inc$980,298+31%+6.0%
5Phillips Paving LLC$1,045,714+40%+13%
6Karvo Companies Inc$1,097,590+47%+18%
7Shelly Company$1,139,660+52%+23%
ODOT contract 250561: bids by rank

Engineer's estimate: $929,000.

Bid tabulation

LinePay itemUnitQuantity1. Specialized Construction Inc2. Geauga Highway Co3. Ronyak Paving Inc4. Barbicas Construction Company Inc5. Phillips Paving LLC6. Karvo Companies Inc
1Pavement removed (202E23000)SY50$22.00$30.00$35.00$40.00$135.00$25.00
2Walk removed (202E30000)SF891$1.75$3.00$4.00$3.50$12.00$5.00
3Curb removed (202E32000)FT195$11.00$12.50$10.00$9.00$17.00$11.00
44" concrete walk, as per plan (608E10001)SF203$19.00$13.00$18.00$22.00$20.00$12.50
5Curb ramp (608E52000)SF681$21.00$21.00$45.00$30.00$20.00$33.00
6Monument assembly adjusted to grade, as per plan (623E39501)EACH9$775.00$500.00$1,175.00$900.00$1,000.00$1,000.00
7Monument assembly reconstructed to grade, as per plan (623E39601)EACH5$875.00$750.00$1,275.00$1,100.00$2,000.00$1,100.00
8Topsoil (659E00300)CY5$100.00$100.00$150.00$100.00$500.00$250.00
9Seeding and mulching, class 1 (659E00500)SY40$20.00$10.00$5.00$10.00$25.00$30.00
10Erosion control (832E30000)EACH6,500$1.00$1.00$1.00$1.00$1.00$1.00
114" unclassified pipe underdrains, as per plan (605E05201)FT50$10.00$25.00$20.00$20.00$50.00$35.00
12Catch basin adjusted to grade, as per plan (611E98631)EACH25$1,100.00$1,150.00$1,150.00$1,600.00$1,250.00$1,600.00
13Catch basin reconstructed to grade, as per plan (611E98635)EACH2$1,500.00$1,800.00$1,950.00$2,100.00$2,500.00$1,800.00
14Manhole adjusted to grade, as per plan (611E99655)EACH39$1,000.00$1,100.00$1,000.00$1,300.00$1,250.00$1,300.00
15Manhole reconstructed to grade, as per plan (611E99661)EACH3$1,325.00$1,600.00$1,625.00$1,700.00$2,000.00$1,400.00
16Special - miscellaneous metal (611E99820)LB1,000$5.00$2.00$5.00$3.00$5.00$2.75
17Partial depth pavement repair (441), as per plan (251E01001)SY900$35.00$65.00$95.00$38.00$70.00$45.00
18Pavement planing, asphalt concrete, as per plan, T (254E01001)SY17,889$3.00$4.93$2.25$4.90$3.00$3.00
19Patching planed surface (254E01600)SY2,500$10.00$0.50$1.00$3.30$5.00$1.00
20Non-tracking tack coat (407E20000)GAL1,085$3.40$3.00$2.00$3.10$2.00$2.30
21Aggregate, single chip seal, type A (422E11000)SY17,889$2.00$0.80$1.00$2.25$2.00$1.00
22Emulsion, chip seal (422E25000)GAL7,162$2.90$3.00$3.00$2.90$2.00$6.00
23Asphalt concrete surface course, type 1, (448), as per plan (441E50101)CY628$245.00$247.00$255.00$321.00$260.00$300.00
24Asphalt concrete intermediate course, type 1, (448), as per plan (441E50201)CY509$235.00$213.00$220.00$282.00$250.00$275.00
256" non-reinforced concrete pavement, class QC MS (452E10050)SY50$75.00$130.00$145.00$150.00$135.00$135.00
26Asphalt concrete curb, type 1, as per plan (609E10001)FT1,009$16.00$12.00$20.00$18.00$16.00$25.00
27Curb, type 6 (609E26000)FT114$45.00$60.00$70.00$45.00$40.00$75.00
28Void reducing asphalt membrane (vram) (872E10000)FT5,939$2.00$2.90$2.00$4.00$4.00$4.00
29Valve box adjusted to grade, as per plan (638E10801)EACH24$750.00$650.00$600.00$800.00$1,000.00$1,500.00
30Center line (644E00300)MI1.10$7,500.00$7,250.00$7,250.00$7,250.00$7,500.00$8,895.00
31Stop line (644E00500)FT75$10.00$7.50$7.50$7.50$10.00$6.00
32Crosswalk line, 12" (644E00620)FT533$5.00$6.25$6.25$6.25$5.00$5.50
33Parking lot stall marking (644E01200)FT260$4.00$3.50$3.50$3.50$4.00$4.20
34Dotted line, 8" (644E01514)FT133$5.00$2.50$2.50$2.50$5.00$3.40
35Detector loop, as per plan (632E26501)EACH2$1,800.00$1,550.00$1,550.00$1,400.00$1,800.00$1,550.00
36Law enforcement officer with patrol car for assistance (614E11110)HR80$95.00$100.00$125.00$80.00$125.00$125.00
37Portable changeable message sign, as per plan (614E18601)SNMT24$900.00$900.00$900.00$900.00$900.00$1,225.00
38Work zone center line, class I, 642 paint (614E21100)MI3.30$1,800.00$1,250.00$1,250.00$1,250.00$1,800.00$2,260.00
39Work zone center line, class III, 642 paint (614E21550)MI1.10$1,700.00$1,250.00$1,250.00$1,250.00$1,700.00$1,835.00
40Work zone stop line, class I, 642 paint (614E26200)FT225$5.00$4.00$4.00$4.00$5.00$3.50
41Work zone stop line, class III, 642 paint (614E26610)FT75$5.00$4.00$4.00$4.00$5.00$3.25
42Premium for contract performance bond and for payment bond (103E05000)LS1$6,000.00$8,000.00$6,499.75$10,000$20,000$10,000
43Maintaining traffic, as per plan (614E11001)LS1$15,000$38,000$72,700$60,000$119,000$100,000
44Field office, type B, as per plan (619E16011)MNTH12$1,000.00$900.00$2,000.00$1,600.00$2,500.00$3,000.00
45Construction layout stakes and surveying (623E10000)LS1$1,500.00$2,000.00$2,080.00$2,500.00$2,500.00$2,500.00
46Preconstruction survey monument verification and report (623E50000)LS1$5,000.00$750.00$2,850.00$2,850.00$2,850.00$3,000.00
47Post construction survey monument verification and report (623E51000)LS1$5,000.00$750.00$2,850.00$2,850.00$2,850.00$3,000.00
48Mobilization (624E10000)LS1$25,000$8,500.00$88,105$60,000$95,000$125,000
100Work zone dotted line, class I, 8", 642 paint (614E24204)FT133$3.00$0.75$0.75$0.75$3.00$1.00
101Work zone crosswalk line, class I, 12", 642 paint (614E27050)FT533$3.00$3.00$3.00$3.00$3.00$3.00
102Work zone pavement marking, misc.:parking lot stal (614E98100)FT260$2.00$1.75$1.75$1.75$2.00$2.50
ODOT contract 250561: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy