ODOT contract 250561 bid tabulation
LAK-SR 174-04.39 (TWO LANE RESURFACING). Let by Ohio DOT on December 18, 2025, LAK. 7 bids received; low bid $747,366 by Specialized Construction Inc, -20% against the engineer's estimate of $929,000.
- Owner
- Ohio DOT
- Letting
- 18 DEC 2025
- Pay items
- 51
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Specialized Construction Inc | $747,366 | Low | -20% |
| 2 | Geauga Highway Co | $754,765 | +1.0% | -19% |
| 3 | Ronyak Paving Inc | $907,841 | +21% | -2.0% |
| 4 | Barbicas Construction Company Inc | $980,298 | +31% | +6.0% |
| 5 | Phillips Paving LLC | $1,045,714 | +40% | +13% |
| 6 | Karvo Companies Inc | $1,097,590 | +47% | +18% |
| 7 | Shelly Company | $1,139,660 | +52% | +23% |
Engineer's estimate: $929,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Specialized Construction Inc | 2. Geauga Highway Co | 3. Ronyak Paving Inc | 4. Barbicas Construction Company Inc | 5. Phillips Paving LLC | 6. Karvo Companies Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 50 | $22.00 | $30.00 | $35.00 | $40.00 | $135.00 | $25.00 |
| 2 | Walk removed (202E30000) | SF | 891 | $1.75 | $3.00 | $4.00 | $3.50 | $12.00 | $5.00 |
| 3 | Curb removed (202E32000) | FT | 195 | $11.00 | $12.50 | $10.00 | $9.00 | $17.00 | $11.00 |
| 4 | 4" concrete walk, as per plan (608E10001) | SF | 203 | $19.00 | $13.00 | $18.00 | $22.00 | $20.00 | $12.50 |
| 5 | Curb ramp (608E52000) | SF | 681 | $21.00 | $21.00 | $45.00 | $30.00 | $20.00 | $33.00 |
| 6 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 9 | $775.00 | $500.00 | $1,175.00 | $900.00 | $1,000.00 | $1,000.00 |
| 7 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 5 | $875.00 | $750.00 | $1,275.00 | $1,100.00 | $2,000.00 | $1,100.00 |
| 8 | Topsoil (659E00300) | CY | 5 | $100.00 | $100.00 | $150.00 | $100.00 | $500.00 | $250.00 |
| 9 | Seeding and mulching, class 1 (659E00500) | SY | 40 | $20.00 | $10.00 | $5.00 | $10.00 | $25.00 | $30.00 |
| 10 | Erosion control (832E30000) | EACH | 6,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 11 | 4" unclassified pipe underdrains, as per plan (605E05201) | FT | 50 | $10.00 | $25.00 | $20.00 | $20.00 | $50.00 | $35.00 |
| 12 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 25 | $1,100.00 | $1,150.00 | $1,150.00 | $1,600.00 | $1,250.00 | $1,600.00 |
| 13 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 2 | $1,500.00 | $1,800.00 | $1,950.00 | $2,100.00 | $2,500.00 | $1,800.00 |
| 14 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 39 | $1,000.00 | $1,100.00 | $1,000.00 | $1,300.00 | $1,250.00 | $1,300.00 |
| 15 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 3 | $1,325.00 | $1,600.00 | $1,625.00 | $1,700.00 | $2,000.00 | $1,400.00 |
| 16 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $5.00 | $2.00 | $5.00 | $3.00 | $5.00 | $2.75 |
| 17 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 900 | $35.00 | $65.00 | $95.00 | $38.00 | $70.00 | $45.00 |
| 18 | Pavement planing, asphalt concrete, as per plan, T (254E01001) | SY | 17,889 | $3.00 | $4.93 | $2.25 | $4.90 | $3.00 | $3.00 |
| 19 | Patching planed surface (254E01600) | SY | 2,500 | $10.00 | $0.50 | $1.00 | $3.30 | $5.00 | $1.00 |
| 20 | Non-tracking tack coat (407E20000) | GAL | 1,085 | $3.40 | $3.00 | $2.00 | $3.10 | $2.00 | $2.30 |
| 21 | Aggregate, single chip seal, type A (422E11000) | SY | 17,889 | $2.00 | $0.80 | $1.00 | $2.25 | $2.00 | $1.00 |
| 22 | Emulsion, chip seal (422E25000) | GAL | 7,162 | $2.90 | $3.00 | $3.00 | $2.90 | $2.00 | $6.00 |
| 23 | Asphalt concrete surface course, type 1, (448), as per plan (441E50101) | CY | 628 | $245.00 | $247.00 | $255.00 | $321.00 | $260.00 | $300.00 |
| 24 | Asphalt concrete intermediate course, type 1, (448), as per plan (441E50201) | CY | 509 | $235.00 | $213.00 | $220.00 | $282.00 | $250.00 | $275.00 |
| 25 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 50 | $75.00 | $130.00 | $145.00 | $150.00 | $135.00 | $135.00 |
| 26 | Asphalt concrete curb, type 1, as per plan (609E10001) | FT | 1,009 | $16.00 | $12.00 | $20.00 | $18.00 | $16.00 | $25.00 |
| 27 | Curb, type 6 (609E26000) | FT | 114 | $45.00 | $60.00 | $70.00 | $45.00 | $40.00 | $75.00 |
| 28 | Void reducing asphalt membrane (vram) (872E10000) | FT | 5,939 | $2.00 | $2.90 | $2.00 | $4.00 | $4.00 | $4.00 |
| 29 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 24 | $750.00 | $650.00 | $600.00 | $800.00 | $1,000.00 | $1,500.00 |
| 30 | Center line (644E00300) | MI | 1.10 | $7,500.00 | $7,250.00 | $7,250.00 | $7,250.00 | $7,500.00 | $8,895.00 |
| 31 | Stop line (644E00500) | FT | 75 | $10.00 | $7.50 | $7.50 | $7.50 | $10.00 | $6.00 |
| 32 | Crosswalk line, 12" (644E00620) | FT | 533 | $5.00 | $6.25 | $6.25 | $6.25 | $5.00 | $5.50 |
| 33 | Parking lot stall marking (644E01200) | FT | 260 | $4.00 | $3.50 | $3.50 | $3.50 | $4.00 | $4.20 |
| 34 | Dotted line, 8" (644E01514) | FT | 133 | $5.00 | $2.50 | $2.50 | $2.50 | $5.00 | $3.40 |
| 35 | Detector loop, as per plan (632E26501) | EACH | 2 | $1,800.00 | $1,550.00 | $1,550.00 | $1,400.00 | $1,800.00 | $1,550.00 |
| 36 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $95.00 | $100.00 | $125.00 | $80.00 | $125.00 | $125.00 |
| 37 | Portable changeable message sign, as per plan (614E18601) | SNMT | 24 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 | $1,225.00 |
| 38 | Work zone center line, class I, 642 paint (614E21100) | MI | 3.30 | $1,800.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,800.00 | $2,260.00 |
| 39 | Work zone center line, class III, 642 paint (614E21550) | MI | 1.10 | $1,700.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,700.00 | $1,835.00 |
| 40 | Work zone stop line, class I, 642 paint (614E26200) | FT | 225 | $5.00 | $4.00 | $4.00 | $4.00 | $5.00 | $3.50 |
| 41 | Work zone stop line, class III, 642 paint (614E26610) | FT | 75 | $5.00 | $4.00 | $4.00 | $4.00 | $5.00 | $3.25 |
| 42 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,000.00 | $8,000.00 | $6,499.75 | $10,000 | $20,000 | $10,000 |
| 43 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $15,000 | $38,000 | $72,700 | $60,000 | $119,000 | $100,000 |
| 44 | Field office, type B, as per plan (619E16011) | MNTH | 12 | $1,000.00 | $900.00 | $2,000.00 | $1,600.00 | $2,500.00 | $3,000.00 |
| 45 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1,500.00 | $2,000.00 | $2,080.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 46 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $5,000.00 | $750.00 | $2,850.00 | $2,850.00 | $2,850.00 | $3,000.00 |
| 47 | Post construction survey monument verification and report (623E51000) | LS | 1 | $5,000.00 | $750.00 | $2,850.00 | $2,850.00 | $2,850.00 | $3,000.00 |
| 48 | Mobilization (624E10000) | LS | 1 | $25,000 | $8,500.00 | $88,105 | $60,000 | $95,000 | $125,000 |
| 100 | Work zone dotted line, class I, 8", 642 paint (614E24204) | FT | 133 | $3.00 | $0.75 | $0.75 | $0.75 | $3.00 | $1.00 |
| 101 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 533 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 102 | Work zone pavement marking, misc.:parking lot stal (614E98100) | FT | 260 | $2.00 | $1.75 | $1.75 | $1.75 | $2.00 | $2.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.