ODOT contract 260056 bid tabulation
LAK-SR 174-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on January 29, 2026, LAK. 8 bids received; low bid $1,727,326 by Karvo Companies Inc, -7.4% against the engineer's estimate of $1,866,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 46
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Karvo Companies Inc | $1,727,326 | Low | -7.0% |
| 2 | Ronyak Paving Inc | $1,729,867 | 0.0% | -7.0% |
| 3 | Geauga Highway Co | $1,771,071 | +3.0% | -5.0% |
| 4 | Shelly Company | $1,787,253 | +3.0% | -4.0% |
| 5 | Kokosing Construction Company Inc | $1,796,174 | +4.0% | -4.0% |
| 6 | Specialized Construction Inc | $1,889,770 | +9.0% | +1.0% |
| 7 | Barbicas Construction Company Inc | $1,999,953 | +16% | +7.0% |
| 8 | Phillips Paving LLC | $2,125,239 | +23% | +14% |
Engineer's estimate: $1,866,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Karvo Companies Inc | 2. Ronyak Paving Inc | 3. Geauga Highway Co | 4. Shelly Company | 5. Kokosing Construction Company Inc | 6. Specialized Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,500.00 | $2,000.00 | $1,500.00 | $2,500.00 | $2,700.00 | $7,500.00 |
| 2 | Curb removed, as per plan (202E32001) | FT | 100 | $50.00 | $30.00 | $6.00 | $10.00 | $9.00 | $20.00 |
| 3 | Excavation of subgrade (204E13000) | CY | 170 | $10.00 | $35.00 | $80.00 | $30.00 | $70.00 | $220.00 |
| 4 | Granular material, type B (204E30010) | CY | 178 | $40.00 | $45.00 | $90.00 | $60.00 | $94.00 | $45.00 |
| 5 | Geotextile fabric (204E50000) | SY | 410 | $1.00 | $2.00 | $3.50 | $2.00 | $6.50 | $25.00 |
| 6 | Geogrid (204E51000) | SY | 410 | $2.00 | $2.00 | $5.00 | $5.00 | $7.25 | $25.00 |
| 7 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 7.61 | $1,725.00 | $750.00 | $4,500.00 | $1,500.00 | $3,100.00 | $6,400.00 |
| 8 | Monument assembly adjusted to grade (623E39500) | EACH | 2 | $1,250.00 | $1,025.00 | $750.00 | $1,000.00 | $1,850.00 | $1,100.00 |
| 9 | Erosion control (832E30000) | EACH | 7,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 10 | Catch basin adjusted to grade (611E98630) | EACH | 6 | $1,300.00 | $1,000.00 | $1,150.00 | $1,200.00 | $3,300.00 | $1,400.00 |
| 11 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 2 | $1,750.00 | $2,585.00 | $1,800.00 | $1,500.00 | $3,850.00 | $1,650.00 |
| 12 | Special - miscellaneous metal (611E99820) | LB | 2,000 | $3.00 | $5.00 | $2.50 | $4.00 | $4.00 | $2.50 |
| 13 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 400 | $75.00 | $80.00 | $65.50 | $90.00 | $98.00 | $55.00 |
| 14 | Pavement repair, as per plan (253E02001) | CY | 300 | $300.00 | $485.00 | $500.00 | $400.00 | $450.00 | $340.00 |
| 15 | Pavement planing, asphalt concrete, as per plan (3 (254E01001) | SY | 58,898 | $3.25 | $2.50 | $4.65 | $2.50 | $2.47 | $3.15 |
| 16 | Full depth pavement removal and rigid replacement, type 2, class QC MS, as per plan (255E16001) | SY | 110 | $300.00 | $260.00 | $150.00 | $425.00 | $155.00 | $290.00 |
| 17 | Full depth pavement sawing (255E20000) | FT | 150 | $5.00 | $5.00 | $3.50 | $5.00 | $4.00 | $3.00 |
| 18 | Aggregate base, as per plan (304E20001) | CY | 24 | $25.00 | $50.00 | $120.00 | $60.00 | $99.00 | $75.00 |
| 19 | Tack coat, 702.13 (407E13900) | GAL | 5,303 | $2.30 | $2.00 | $3.00 | $2.00 | $3.00 | $3.40 |
| 20 | Non-tracking tack coat (407E20000) | GAL | 3,539 | $2.30 | $4.00 | $3.00 | $3.00 | $2.90 | $3.40 |
| 22 | Asphalt concrete surface course, type 1, (446), as per plan (441E10101) | CY | 2,066 | $198.00 | $200.00 | $210.00 | $215.00 | $208.00 | $220.00 |
| 23 | Asphalt concrete intermediate course, type 2, (446), as per plan (441E10201) | CY | 2,918 | $168.00 | $187.00 | $187.00 | $170.00 | $177.00 | $210.00 |
| 24 | Combination curb and gutter, type 2 (609E12000) | FT | 75 | $65.00 | $45.00 | $75.00 | $90.00 | $48.00 | $80.00 |
| 25 | Curb, type 2-A (609E14000) | FT | 100 | $40.00 | $45.00 | $75.00 | $30.00 | $4.50 | $30.00 |
| 26 | Curb, type 4-C, as per plan (609E24511) | FT | 25 | $75.00 | $65.00 | $75.00 | $120.00 | $21.00 | $80.00 |
| 27 | Compacted aggregate, as per plan (617E10101) | CY | 374 | $100.00 | $100.00 | $120.00 | $100.00 | $80.00 | $100.00 |
| 28 | Longitudinal joint adhesive (875E10000) | LB | 4,004 | $1.00 | $2.00 | $3.50 | $2.50 | $0.75 | $1.00 |
| 29 | Valve box adjusted to grade (638E10800) | EACH | 14 | $1,000.00 | $600.00 | $750.00 | $700.00 | $650.00 | $1,100.00 |
| 30 | Edge line, 4", type 1 (642E00100) | MI | 7.39 | $790.00 | $790.00 | $790.00 | $750.00 | $790.00 | $1,100.00 |
| 31 | Center line, type 1 (642E00300) | MI | 3.68 | $860.00 | $860.00 | $860.00 | $1,350.00 | $860.00 | $1,800.00 |
| 32 | Stop line, type 1 (642E00500) | FT | 103 | $8.00 | $8.00 | $8.00 | $4.00 | $8.00 | $5.50 |
| 33 | Detector loop, as per plan (632E26501) | EACH | 2 | $1,500.00 | $1,800.00 | $3,400.00 | $1,450.00 | $1,450.00 | $1,800.00 |
| 34 | Law enforcement officer with patrol car for assistance, as per plan (614E11111) | HR | 160 | $125.00 | $125.00 | $50.00 | $120.00 | $100.00 | $100.00 |
| 35 | Portable changeable message sign, as per plan (614E18601) | SNMT | 9 | $850.00 | $1,225.00 | $950.00 | $1,000.00 | $1,100.00 | $1,100.00 |
| 36 | Work zone center line, class I, 642 paint (614E21100) | MI | 3.68 | $937.00 | $940.00 | $937.00 | $750.00 | $937.00 | $1,500.00 |
| 37 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 7.39 | $937.00 | $940.00 | $937.00 | $1,350.00 | $937.00 | $900.00 |
| 38 | Water (616E10000) | MGAL | 50 | $1.00 | $1.00 | $10.00 | $10.00 | $13.00 | $10.00 |
| 39 | Calcium chloride (616E20000) | TON | 14 | $1.00 | $1.00 | $10.00 | $500.00 | $100.00 | $125.00 |
| 40 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,891 | $12,469 | $11,568 | $10,000 | $7,180.00 | $13,000 |
| 41 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $100,000 | $88,000 | $26,619 | $190,000 | $140,978 | $25,000 |
| 42 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $2,500.00 | $5,850.00 | $2,500.00 | $5,000.00 | $5,600.00 | $10,000 |
| 43 | Mobilization (624E10000) | LS | 1 | $115,000 | $80,000 | $10,000 | $40,000 | $89,800 | $90,000 |
| 44 | Special - preconstruction video (690E98400) | LS | 1 | $2,500.00 | $2,500.00 | $1,800.00 | $2,500.00 | $1,800.00 | $1,880.00 |
| 100 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 45 | $675.00 | $450.00 | $320.00 | $450.00 | $440.00 | $395.00 |
| 101 | Work zone stop line, class I, 642 paint (614E26200) | FT | 103 | $6.00 | $6.00 | $6.00 | $3.50 | $6.00 | $5.00 |
| 102 | Asphalt concrete for maintaining traffic (614E13000) | CY | 100 | $200.00 | $60.00 | $50.00 | $120.00 | $125.00 | $130.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.