ODOT contract 260025 bid tabulation
POR-SR 82/VAR-10.64/VAR (TWO LANE RESURFACING). Let by Ohio DOT on January 15, 2026, POR. 5 bids received; low bid $4,051,587 by Ronyak Paving Inc, -12% against the engineer's estimate of $4,595,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 115
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ronyak Paving Inc | $4,051,587 | Low | -12% |
| 2 | Karvo Companies Inc | $4,175,000 | +3.0% | -9.0% |
| 3 | Kokosing Construction Company Inc | $4,372,236 | +8.0% | -5.0% |
| 4 | Shelly Company | $4,469,723 | +10% | -3.0% |
| 5 | Shelly & Sands Inc | $4,550,070 | +12% | -1.0% |
Engineer's estimate: $4,595,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ronyak Paving Inc | 2. Karvo Companies Inc | 3. Kokosing Construction Company Inc | 4. Shelly Company | 5. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 5,096 | $5.00 | $8.00 | $7.00 | $9.25 | $20.00 |
| 2 | Walk removed (202E30000) | SF | 4,232 | $4.00 | $10.00 | $4.25 | $10.00 | $3.75 |
| 3 | Curb removed (202E32000) | FT | 380 | $15.00 | $25.00 | $16.00 | $15.00 | $10.00 |
| 4 | Curb and gutter removed (202E32500) | FT | 107 | $15.00 | $25.00 | $16.00 | $30.00 | $20.00 |
| 5 | Removal misc.: barrier reflector (202E98100) | EACH | 16 | $5.00 | $5.00 | $5.00 | $20.00 | $5.00 |
| 6 | Excavation (203E10000) | CY | 150 | $15.00 | $15.00 | $35.00 | $30.00 | $32.00 |
| 7 | Linear grading (209E60200) | STA | 810 | $2.00 | $35.00 | $45.00 | $80.00 | $40.00 |
| 8 | Preparing subgrade for shoulder paving (209E72000) | STA | 336 | $4.00 | $25.00 | $7.00 | $75.00 | $50.00 |
| 9 | 4" concrete walk (608E10000) | SF | 144 | $35.00 | $12.00 | $19.00 | $12.30 | $15.00 |
| 10 | Curb ramp (608E52000) | SF | 4,158 | $45.00 | $15.00 | $19.00 | $26.55 | $22.50 |
| 11 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 10 | $1,485.00 | $1,400.00 | $685.00 | $1,000.00 | $1,400.00 |
| 12 | Special - as-built construction plans (690E91000) | LS | 1 | $2,500.00 | $1,000.00 | $1,000.00 | $10,000 | $2,000.00 |
| 13 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Catch basin adjusted to grade (611E98630) | EACH | 37 | $1,395.00 | $1,300.00 | $1,650.00 | $1,400.00 | $1,800.00 |
| 15 | Catch basin reconstructed to grade (611E98634) | EACH | 7 | $1,800.00 | $1,775.00 | $2,250.00 | $1,700.00 | $2,000.00 |
| 16 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 18 | $1,200.00 | $1,500.00 | $1,150.00 | $1,600.00 | $1,500.00 |
| 17 | Manhole reconstructed to grade (611E99660) | EACH | 3 | $1,625.00 | $2,000.00 | $1,850.00 | $1,700.00 | $2,000.00 |
| 18 | Special - miscellaneous metal (611E99820) | LB | 21,150 | $3.00 | $2.50 | $1.00 | $3.50 | $4.00 |
| 19 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 13 | $1,000.00 | $1,200.00 | $650.00 | $800.00 | $1,200.00 |
| 20 | Partial depth pavement repair (441) (251E01000) | SY | 4,747 | $40.00 | $35.00 | $50.00 | $45.00 | $36.00 |
| 21 | Partial depth pavement repair (441) (251E01000) | SY | 350 | $95.00 | $70.00 | $200.00 | $90.00 | $175.00 |
| 22 | Pavement repair (253E01000) | SY | 900 | $125.00 | $90.00 | $130.00 | $120.00 | $95.00 |
| 23 | Pavement planing, asphalt concrete (T=1.5") (254E01000) | SY | 52,425 | $1.00 | $1.00 | $1.10 | $1.25 | $2.00 |
| 24 | Pavement planing, asphalt concrete (T=3.25") (254E01000) | SY | 46,640 | $1.85 | $2.00 | $1.10 | $1.85 | $4.00 |
| 25 | Full depth pavement sawing (255E20000) | FT | 5,400 | $1.00 | $1.50 | $2.00 | $2.00 | $2.00 |
| 26 | Aggregate base (304E20000) | CY | 150 | $30.00 | $25.00 | $60.00 | $70.00 | $50.00 |
| 27 | Non-tracking tack coat (407E20000) | GAL | 23,129 | $2.00 | $2.30 | $2.50 | $2.75 | $3.05 |
| 28 | Prime coat, as per plan (408E10001) | GAL | 10,153 | $2.50 | $5.00 | $4.00 | $5.00 | $3.50 |
| 29 | Stabilized crushed aggregate (411E10000) | CY | 3 | $200.00 | $275.00 | $200.00 | $1,300.00 | $90.00 |
| 30 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 3,650 | $210.00 | $238.00 | $240.00 | $210.00 | $230.00 |
| 31 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 2,592 | $160.00 | $155.00 | $175.00 | $140.00 | $155.00 |
| 32 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 4,057 | $200.00 | $215.00 | $225.00 | $185.00 | $222.00 |
| 33 | Combination curb and gutter, type 2 (609E12000) | FT | 65 | $90.00 | $75.00 | $50.00 | $65.55 | $60.00 |
| 34 | Curb, type 6 (609E26000) | FT | 240 | $65.00 | $55.00 | $50.00 | $41.30 | $40.00 |
| 35 | Compacted aggregate (617E10100) | CY | 717 | $85.00 | $100.00 | $125.00 | $120.00 | $90.00 |
| 36 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 5 | $1,050.00 | $1,550.00 | $1,140.00 | $1,050.00 | $1,550.00 |
| 37 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 3 | $1,050.00 | $1,050.00 | $1,140.00 | $1,050.00 | $1,050.00 |
| 38 | Longitudinal joint preparation (874E21000) | MI | 3 | $3,000.00 | $5,375.00 | $1,250.00 | $8,000.00 | $1,000.00 |
| 39 | Pavement planing, asphalt concrete, class A (T=1") (897E01010) | SY | 82,979 | $1.00 | $1.00 | $1.10 | $1.05 | $1.85 |
| 40 | Pavement planing, asphalt concrete, class A (T=1.2 (897E01010) | SY | 38,726 | $1.10 | $1.00 | $1.10 | $1.50 | $2.30 |
| 41 | RPM (621E00100) | EACH | 549 | $39.00 | $39.00 | $37.50 | $39.00 | $41.00 |
| 42 | Raised pavement marker removed (621E54000) | EACH | 442 | $5.00 | $1.00 | $2.00 | $4.00 | $5.00 |
| 43 | Barrier reflector, type 2, (BI-directional) (626E00110) | EACH | 65 | $14.00 | $13.00 | $14.00 | $27.50 | $14.00 |
| 44 | Removal of ground mounted sign and disposal (630E84900) | EACH | 6 | $10.00 | $25.00 | $10.00 | $25.00 | $12.00 |
| 45 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $15.00 | $25.00 | $15.00 | $25.00 | $18.00 |
| 46 | Signing, misc.:solar powered rectangular rapid fla (630E97700) | EACH | 2 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 47 | Edge line, 6" (646E10010) | MI | 22.15 | $2,799.00 | $2,799.00 | $2,799.00 | $2,799.00 | $2,750.00 |
| 48 | Center line (646E10200) | MI | 13.45 | $3,475.00 | $3,475.00 | $3,475.00 | $3,475.00 | $3,650.00 |
| 49 | Channelizing line, 8" (646E10300) | FT | 315 | $1.78 | $1.78 | $1.78 | $1.80 | $1.50 |
| 50 | Stop line (646E10400) | FT | 226 | $11.50 | $11.50 | $11.50 | $11.50 | $10.00 |
| 51 | Crosswalk line, 24" (646E10520) | FT | 1,100 | $10.50 | $10.50 | $10.50 | $10.50 | $10.00 |
| 52 | Island marking (646E10800) | SF | 96 | $7.25 | $7.25 | $7.25 | $7.25 | $5.00 |
| 53 | Handicap symbol marking (646E10900) | EACH | 1 | $295.00 | $295.00 | $295.00 | $295.00 | $275.00 |
| 54 | School symbol marking, 96" (646E20110) | EACH | 2 | $645.00 | $645.00 | $645.00 | $645.00 | $500.00 |
| 55 | Parking lot stall marking (646E20200) | FT | 1,678 | $3.35 | $3.35 | $3.35 | $3.35 | $2.50 |
| 56 | Lane arrow (646E20300) | EACH | 19 | $165.00 | $165.00 | $165.00 | $165.00 | $185.00 |
| 57 | Bike lane symbol marking (646E20600) | EACH | 25 | $197.00 | $197.00 | $197.00 | $197.00 | $225.00 |
| 58 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $125.00 | $125.00 | $120.00 | $100.00 | $95.00 |
| 59 | Detour signing (614E12420) | LS | 1 | $7,700.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 60 | Work zone marking sign (614E12460) | EACH | 9 | $65.00 | $80.00 | $100.00 | $80.00 | $80.00 |
| 61 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $250.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 62 | Work zone center line, class I (614E21000) | MI | 17.07 | $977.00 | $977.00 | $977.00 | $900.00 | $1,250.00 |
| 63 | Work zone center line, class III, 642 paint (614E21550) | MI | 13.45 | $877.00 | $877.00 | $877.00 | $900.00 | $1,250.00 |
| 64 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 21.96 | $585.00 | $585.00 | $400.00 | $500.00 | $450.00 |
| 65 | Work zone channelizing line, class I, 8" (614E23000) | FT | 325 | $0.76 | $0.76 | $0.76 | $1.00 | $1.00 |
| 66 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 325 | $0.72 | $0.72 | $0.72 | $1.00 | $1.00 |
| 67 | Work zone stop line, class I (614E26000) | FT | 263 | $3.25 | $3.25 | $3.25 | $3.00 | $3.00 |
| 68 | Work zone stop line, class III, 642 paint (614E26610) | FT | 239 | $3.10 | $3.10 | $3.10 | $3.00 | $3.00 |
| 69 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $17,385 | $17,385 | $17,385 | $17,385 | $10,000 |
| 70 | Wearing course removed (202E23500) | SY | 249 | $35.00 | $18.00 | $30.00 | $16.25 | $25.00 |
| 71 | Wearing course removed, as per plan (202E23501) | SY | 161 | $35.00 | $15.00 | $30.00 | $45.00 | $25.00 |
| 72 | Guardrail removed (202E38000) | FT | 288 | $3.00 | $5.00 | $3.00 | $5.00 | $3.00 |
| 73 | Tack coat, 702.13 (407E13900) | GAL | 9 | $20.00 | $2.30 | $2.50 | $30.00 | $3.50 |
| 74 | Non-tracking tack coat (407E20000) | GAL | 58 | $20.00 | $2.30 | $2.50 | $2.75 | $3.05 |
| 75 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 57 | $28.62 | $29.00 | $28.62 | $28.65 | $30.00 |
| 76 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 27 | $650.00 | $450.00 | $550.00 | $350.00 | $450.00 |
| 77 | Epoxy coated steel reinforcement (509E10000) | LB | 123 | $8.72 | $9.00 | $8.72 | $8.75 | $5.00 |
| 78 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 20 | $29.88 | $30.00 | $29.88 | $29.90 | $25.00 |
| 79 | Class QC1 concrete, abutment (511E45710) | CY | 1 | $4,126.50 | $4,127.00 | $4,126.50 | $4,126.50 | $4,000.00 |
| 80 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 17 | $47.97 | $48.00 | $47.97 | $48.00 | $50.00 |
| 81 | Type 3 waterproofing (512E33010) | SY | 174 | $57.45 | $58.00 | $57.45 | $57.45 | $50.00 |
| 82 | Prestressed concrete non-composite box beam bridge members, level 1, B21-48, as per plan (515E10051) | EACH | 1 | $36,203 | $36,205 | $36,203 | $36,203 | $52,500 |
| 83 | High early strength keyway grout (515E30000) | FT | 113 | $21.08 | $22.00 | $21.08 | $21.10 | $100.00 |
| 84 | 1" preformed expansion joint filler (516E13600) | SF | 19 | $9.61 | $10.00 | $9.61 | $9.60 | $10.00 |
| 85 | 2" deep joint sealer (516E31010) | FT | 57 | $28.62 | $29.00 | $28.62 | $28.60 | $30.00 |
| 86 | Elastomeric bearing with internal laminates only (neoprene) (516E43100) | EACH | 4 | $245.40 | $246.00 | $245.40 | $245.40 | $350.00 |
| 87 | Railing (three steel tube bridge railing) (517E70100) | FT | 63 | $460.00 | $420.00 | $460.00 | $425.00 | $460.00 |
| 88 | Special - steel drip strip (518E22300) | FT | 118 | $19.54 | $20.00 | $19.54 | $19.55 | $10.00 |
| 89 | Guardrail, type MGS (606E15050) | FT | 137.50 | $24.40 | $25.00 | $24.40 | $25.00 | $24.40 |
| 90 | Anchor assembly, MGS type E (606E26150) | EACH | 2 | $2,685.00 | $3,125.00 | $2,685.00 | $2,700.00 | $2,685.00 |
| 91 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 2 | $2,575.00 | $2,875.00 | $2,575.00 | $2,700.00 | $2,575.00 |
| 92 | RPM (621E00100) | EACH | 2 | $99.00 | $99.00 | $97.50 | $99.00 | $41.00 |
| 93 | Raised pavement marker removed (621E54000) | EACH | 2 | $5.00 | $1.00 | $2.00 | $10.00 | $5.00 |
| 94 | Barrier reflector, type 2 (BL-directional) (626E00110) | EACH | 5 | $13.20 | $13.00 | $13.20 | $13.00 | $13.20 |
| 95 | Ground mounted support, no. 2 post (630E02100) | FT | 21 | $35.00 | $35.00 | $35.00 | $25.00 | $35.00 |
| 96 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $15.00 | $25.00 | $15.00 | $25.00 | $25.00 |
| 97 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $65.00 | $100.00 | $65.00 | $85.00 | $100.00 |
| 98 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $20.00 | $25.00 | $20.00 | $25.00 | $25.00 |
| 99 | Edge line, 6" (646E10010) | MI | 0.04 | $10,000 | $10,000 | $10,000 | $10,000 | $35,000 |
| 100 | Center line (646E10200) | MI | 0.02 | $20,000 | $20,000 | $20,000 | $20,000 | $70,000 |
| 101 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 752 | $12.67 | $12.75 | $12.67 | $12.70 | $16.00 |
| 102 | Removal of existing pavement marking (512E74500) | FT | 525 | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 103 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 560 | $12.67 | $12.75 | $12.67 | $12.70 | $16.00 |
| 104 | Removal of existing pavement marking (512E74500) | FT | 420 | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 105 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 294 | $12.67 | $36.00 | $35.82 | $35.85 | $30.00 |
| 106 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 878 | $12.67 | $12.75 | $12.67 | $12.70 | $16.00 |
| 107 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 294 | $21.08 | $22.00 | $21.08 | $21.10 | $20.00 |
| 108 | Removal of existing pavement marking (512E74500) | FT | 368 | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 109 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 401 | $12.67 | $12.75 | $12.67 | $12.70 | $17.00 |
| 110 | Removal of existing pavement marking (512E74500) | FT | 516 | $1.02 | $1.00 | $1.02 | $1.00 | $5.00 |
| 111 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $25,107 | $25,000 | $18,000 | $20,000 | $12,000 |
| 112 | Maintaining traffic (614E11000) | LS | 1 | $196,725 | $208,355 | $201,361 | $571,500 | $212,570 |
| 113 | Field office, type B (619E16010) | MNTH | 6 | $1,500.00 | $3,000.00 | $2,100.00 | $3,000.00 | $3,000.00 |
| 114 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,100 | $5,000.00 | $5,000.00 | $10,000 | $10,000 |
| 115 | Mobilization (624E10000) | LS | 1 | $148,860 | $184,462 | $215,000 | $100,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.