ODOT contract 250364 bid tabulation
TRU-SR 193-17.77 (TWO LANE RESURFACING). Let by Ohio DOT on July 31, 2025, TRU. 4 bids received; low bid $1,511,607 by Shelly & Sands Inc, -30% against the engineer's estimate of $2,174,000.
- Owner
- Ohio DOT
- Letting
- 31 JUL 2025
- Pay items
- 41
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $1,511,607 | Low | -30% |
| 2 | Karvo Companies Inc | $1,575,000 | +4.0% | -28% |
| 3 | Shelly Company | $1,690,907 | +12% | -22% |
| 4 | Ronyak Paving Inc | $1,734,900 | +15% | -20% |
Engineer's estimate: $2,174,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Karvo Companies Inc | 3. Shelly Company | 4. Ronyak Paving Inc |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 411 | $12.00 | $0.75 | $12.00 | $15.00 |
| 2 | Removal misc.: barrier reflector (202E98100) | EACH | 34 | $10.00 | $7.00 | $7.50 | $2.50 |
| 3 | Excavation (203E10000) | CY | 22 | $150.00 | $5.00 | $30.00 | $20.00 |
| 4 | Linear grading (209E60200) | STA | 250 | $40.00 | $35.00 | $58.00 | $20.00 |
| 5 | Monument assembly adjusted to grade (623E39500) | EACH | 5 | $1,800.00 | $1,800.00 | $1,800.00 | $1,575.00 |
| 6 | Special - as-built construction plans (690E91000) | LS | 1 | $2,000.00 | $500.00 | $6,000.00 | $1,500.00 |
| 7 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 8 | Catch basin adjusted to grade (611E98630) | EACH | 2 | $2,500.00 | $2,000.00 | $2,500.00 | $1,550.00 |
| 9 | Special - miscellaneous metal (611E99820) | LB | 400 | $5.00 | $3.00 | $5.00 | $5.00 |
| 10 | Partial depth pavement repair (441) (251E01000) | SY | 2,200 | $42.00 | $40.00 | $37.00 | $52.00 |
| 11 | Partial depth pavement repair (441) (251E01000) | SY | 300 | $100.00 | $80.00 | $70.00 | $70.00 |
| 12 | Pavement repair (253E01000) | SY | 400 | $150.00 | $115.00 | $130.00 | $135.00 |
| 13 | Pavement repair (253E01000) | SY | 20 | $250.00 | $115.00 | $240.00 | $235.00 |
| 14 | Aggregate base (304E20000) | CY | 22 | $50.00 | $20.00 | $80.00 | $50.00 |
| 15 | Non-tracking tack coat (407E20000) | GAL | 10,881 | $3.05 | $2.25 | $2.50 | $2.00 |
| 16 | Prime coat, as per plan (408E10001) | GAL | 7,153 | $3.50 | $4.50 | $4.25 | $2.00 |
| 17 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 4,198 | $194.00 | $210.00 | $200.00 | $220.00 |
| 18 | Compacted aggregate, as per plan (617E10101) | CY | 497 | $109.00 | $120.00 | $90.00 | $130.00 |
| 19 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 13.96 | $665.00 | $675.00 | $675.00 | $675.00 |
| 20 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 6.98 | $665.00 | $675.00 | $675.00 | $675.00 |
| 21 | Longitudinal joint preparation (874E20000) | FT | 36,855 | $0.20 | $0.60 | $1.00 | $0.35 |
| 22 | Pavement planing, asphalt concrete, class A (T = 1 (897E01010) | SY | 81,101 | $0.70 | $0.65 | $1.40 | $1.00 |
| 23 | Pavement planing, asphalt concrete, class A (T = 1 (897E01010) | SY | 39,383 | $0.70 | $0.85 | $1.50 | $1.25 |
| 24 | RPM (621E00100) | EACH | 520 | $33.00 | $33.00 | $41.50 | $38.00 |
| 25 | Raised pavement marker removed (621E54000) | EACH | 416 | $5.00 | $1.00 | $6.00 | $1.00 |
| 26 | Barrier reflector, type 5, (bidirectional) (626E00116) | EACH | 42 | $40.00 | $76.00 | $72.50 | $40.00 |
| 27 | Edge line, 6" (646E10010) | MI | 15.24 | $2,795.00 | $2,795.00 | $2,795.00 | $2,795.00 |
| 28 | Center line (646E10200) | MI | 7.62 | $2,670.00 | $2,670.00 | $2,670.00 | $2,670.00 |
| 29 | Stop line (646E10400) | FT | 66 | $13.00 | $13.00 | $13.00 | $13.00 |
| 30 | Work zone marking sign (614E12460) | EACH | 20 | $75.00 | $100.00 | $75.00 | $75.00 |
| 31 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $500.00 | $200.00 | $150.00 | $250.00 |
| 32 | Work zone center line, class I (614E21000) | MI | 7.62 | $900.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 33 | Work zone center line, class III, 642 paint (614E21550) | MI | 7.62 | $900.00 | $900.00 | $900.00 | $900.00 |
| 34 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 15.24 | $590.00 | $595.00 | $595.00 | $595.00 |
| 35 | Work zone stop line, class I (614E26000) | FT | 66 | $3.00 | $3.00 | $3.00 | $3.00 |
| 36 | Work zone stop line, class III, 642 paint (614E26610) | FT | 66 | $3.00 | $3.00 | $3.00 | $3.00 |
| 37 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,000.00 | $15,000 | $10,000 | $12,500 |
| 38 | Maintaining traffic (614E11000) | LS | 1 | $69,769 | $68,000 | $124,700 | $92,837 |
| 39 | Field office, type B (619E16010) | MNTH | 6 | $3,500.00 | $2,500.00 | $3,000.00 | $2,000.00 |
| 40 | Construction layout stakes and surveying (623E10000) | LS | 1 | $2,000.00 | $5,000.00 | $8,500.00 | $8,000.00 |
| 41 | Mobilization (624E10000) | LS | 1 | $40,000 | $51,315 | $40,000 | $90,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 31, 2025. Compiled by Mirage Metrics.