ODOT contract 250193 bid tabulation
GUE-SR 658-10.14/10.98 (BRIDGE REPAIR). Let by Ohio DOT on April 10, 2025, GUE. 3 bids received; low bid $2,125,624 by Complete General Construction Company, +7.9% against the engineer's estimate of $1,970,000.
- Owner
- Ohio DOT
- Letting
- 10 APR 2025
- Pay items
- 95
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $2,125,624 | Low | +8.0% |
| 2 | Shelly & Sands Inc | $2,429,324 | +14% | +23% |
| 3 | Michels Corporation | $2,808,334 | +32% | +43% |
Engineer's estimate: $1,970,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Shelly & Sands Inc | 3. Michels Corporation |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $10,000 | $50,000 | $2,000.00 |
| 2 | Headwall removed (202E20010) | EACH | 2 | $1,500.00 | $900.00 | $8,300.00 |
| 3 | Pavement removed (202E23000) | SY | 456 | $30.00 | $15.00 | $21.00 |
| 4 | Wearing course removed (202E23500) | SY | 112 | $40.00 | $8.00 | $34.00 |
| 5 | Pipe removed, over 24" diameter (202E35200) | FT | 60 | $125.00 | $80.00 | $150.00 |
| 6 | Guardrail removed (202E38000) | FT | 568 | $7.50 | $2.40 | $31.00 |
| 7 | Guardrail removed for reuse (202E38200) | FT | 50 | $10.00 | $3.00 | $24.00 |
| 8 | Removal misc.: stone wall removed (202E98200) | FT | 31 | $400.00 | $80.00 | $180.00 |
| 9 | Excavation (203E10000) | CY | 102 | $50.00 | $50.00 | $74.00 |
| 10 | Embankment (203E20000) | CY | 622 | $25.00 | $40.00 | $144.00 |
| 11 | Subgrade compaction (204E10000) | SY | 895 | $9.00 | $10.00 | $9.00 |
| 12 | Reshaping under guardrail (209E15000) | STA | 7 | $50.00 | $55.00 | $1,150.00 |
| 13 | Guardrail, type MGS (606E15050) | FT | 465.50 | $21.74 | $22.00 | $31.00 |
| 14 | Guardrail rebuilt, type MGS (606E16050) | FT | 50 | $16.86 | $18.00 | $22.00 |
| 15 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 5 | $2,260.00 | $2,680.00 | $3,200.00 |
| 16 | Anchor assembly, MGS type T (606E26550) | EACH | 4 | $1,010.00 | $1,360.00 | $1,400.00 |
| 17 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,030.00 | $2,600.00 | $2,875.00 |
| 18 | Curb, type 4-C (609E24510) | FT | 28 | $150.00 | $129.00 | $416.00 |
| 19 | Topsoil furnished and placed (653E10000) | CY | 36 | $35.00 | $110.00 | $163.00 |
| 20 | Riprap, type D (601E11000) | SY | 9 | $300.00 | $500.00 | $490.00 |
| 21 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 7 | $200.00 | $200.00 | $835.00 |
| 22 | Rock channel protection, type A with filter (601E32000) | CY | 15 | $200.00 | $230.00 | $320.00 |
| 23 | Rock channel protection, type C with filter, as per plan (601E32201) | CY | 247 | $95.00 | $50.00 | $190.00 |
| 24 | Precast reinforced concrete outlet (611E99710) | EACH | 4 | $500.00 | $600.00 | $1,900.00 |
| 25 | Seeding and mulching, class 2 (659E00510) | SY | 2,899 | $1.32 | $1.32 | $1.50 |
| 26 | Commercial fertilizer (659E20000) | TON | 0.39 | $1,250.00 | $1,250.00 | $1,500.00 |
| 27 | Lime (659E31000) | ACRE | 0.60 | $150.00 | $160.00 | $2,000.00 |
| 28 | Water (659E35000) | MGAL | 9.70 | $1.00 | $1.00 | $156.00 |
| 29 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 30 | 72" conduit, type A, as per plan, 706.02 (installa (611E26001) | FT | 80 | $950.00 | $2,500.00 | $220.00 |
| 31 | Pavement planing, asphalt concrete, variable depth (254E01000) | SY | 1,031 | $18.00 | $12.00 | $7.00 |
| 32 | Full depth pavement sawing (255E20000) | FT | 601 | $4.00 | $3.00 | $6.00 |
| 33 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 99 | $310.00 | $375.00 | $192.00 |
| 34 | Aggregate base (304E20000) | CY | 140 | $125.00 | $165.00 | $192.00 |
| 35 | Non-tracking tack coat (407E20000) | GAL | 213 | $4.00 | $3.50 | $4.50 |
| 36 | Prime coat (408E10000) | GAL | 10 | $139.00 | $4.00 | $6.00 |
| 37 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 68 | $379.00 | $400.00 | $400.00 |
| 38 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 81 | $314.00 | $375.00 | $450.00 |
| 39 | Compacted aggregate (617E10100) | CY | 6 | $150.00 | $366.00 | $650.00 |
| 40 | Raised pavement marker removed (621E54000) | EACH | 38 | $20.00 | $12.00 | $50.00 |
| 41 | Barrier reflector, type 1 (bidirectional) (626E00102) | EACH | 5 | $10.00 | $12.00 | $14.00 |
| 42 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 17 | $11.00 | $14.00 | $15.00 |
| 43 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 48 | $18.00 | $18.00 | $25.00 |
| 44 | Sign, flat sheet (630E80100) | SF | 14 | $30.00 | $24.00 | $40.00 |
| 45 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $50.00 | $75.00 | $70.00 |
| 46 | Edge line, 6", type 1 (642E00104) | MI | 0.27 | $3,000.00 | $2,750.00 | $3,600.00 |
| 47 | Center line, type 1 (642E00300) | MI | 0.13 | $3,000.00 | $5,250.00 | $6,800.00 |
| 48 | Stop line, type 1 (642E00500) | FT | 15 | $10.00 | $14.00 | $10.00 |
| 49 | Traffic compacted surface, type C (410E13000) | CY | 10 | $200.00 | $125.00 | $700.00 |
| 50 | Detour signing (614E12420) | LS | 1 | $9,000.00 | $4,250.00 | $5,000.00 |
| 51 | Asphalt concrete for maintaining traffic (614E13000) | CY | 20 | $600.00 | $560.00 | $450.00 |
| 52 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,200.00 | $750.00 | $950.00 |
| 53 | Water (616E10000) | MGAL | 2 | $75.00 | $100.00 | $700.00 |
| 54 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $5,000.00 | $75,000 | $3,500.00 |
| 55 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $125,000 | $112,000 | $234,000 |
| 56 | Portions of structure removed, as per plan (202E11301) | CY | 21 | $3,515.00 | $1,500.00 | $1,190.00 |
| 57 | Approach slab removed (202E22900) | SY | 111 | $80.00 | $22.00 | $150.00 |
| 58 | Bridge railing removed (202E38500) | FT | 394 | $10.00 | $8.00 | $15.00 |
| 59 | Removal misc.: bearings (202E98100) | EACH | 9 | $250.00 | $250.00 | $1,000.00 |
| 60 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $95,000 | $75,000 | $16,500 |
| 61 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $35,000 | $50,000 | $7,500.00 |
| 62 | Galvanized steel reinforcement (509E26000) | LB | 68,529 | $2.00 | $2.10 | $2.50 |
| 63 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,740 | $1.50 | $2.00 | $2.50 |
| 64 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 164 | $50.00 | $40.00 | $41.00 |
| 65 | Class QC2 concrete with QC/QA, bridge deck (511E34446) | CY | 191 | $900.00 | $1,300.00 | $2,400.00 |
| 66 | Class QC2 concrete, bridge deck (parapet) (511E34448) | CY | 63 | $700.00 | $650.00 | $1,100.00 |
| 67 | Class QC1 concrete, pier above footings (511E40510) | CY | 2 | $15,000 | $9,000.00 | $10,000 |
| 68 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 25 | $2,500.00 | $2,000.00 | $1,800.00 |
| 69 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 471 | $13.50 | $13.50 | $21.00 |
| 70 | Structural steel members, level UF (513E10200) | LB | 3,731 | $24.00 | $24.00 | $30.00 |
| 71 | Welded stud shear connectors (513E20000) | EACH | 2,316 | $4.75 | $8.00 | $15.00 |
| 72 | Surface preparation of existing structural steel (514E00050) | SF | 8,368 | $18.65 | $21.00 | $22.00 |
| 73 | Field painting of existing structural steel, prime coat (514E00056) | SF | 8,524 | $3.05 | $3.50 | $8.00 |
| 74 | Field painting structural steel, intermediate coat (514E00060) | SF | 8,741 | $3.50 | $4.00 | $7.00 |
| 75 | Field painting structural steel, finish coat (514E00066) | SF | 8,741 | $3.50 | $4.00 | $7.00 |
| 76 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 13 | $40.00 | $50.00 | $200.00 |
| 77 | Final inspection repair (514E10000) | EACH | 7 | $800.00 | $900.00 | $200.00 |
| 78 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 13 | $60.00 | $160.00 | $58.00 |
| 79 | Structural joint or joint sealer, misc.: box seal (516E14600) | FT | 66 | $1,100.00 | $1,250.00 | $2,000.00 |
| 80 | 2" deep joint sealer, as per plan (516E31011) | FT | 63 | $32.00 | $35.00 | $13.00 |
| 81 | Bearing device, misc.: sliding plate (abutment) (516E46900) | EACH | 8 | $3,000.00 | $3,000.00 | $4,000.00 |
| 82 | Bearing device, misc.: sliding plate (pier) (516E46900) | EACH | 1 | $4,000.00 | $3,400.00 | $4,000.00 |
| 83 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $40,000 | $40,000 | $75,000 |
| 84 | Scuppers, including supports (518E12000) | EACH | 6 | $2,100.00 | $2,750.00 | $1,000.00 |
| 85 | Porous backfill with geotextile fabric (518E21200) | CY | 45 | $195.00 | $150.00 | $400.00 |
| 86 | 6" perforated corrugated plastic pipe (518E40000) | FT | 81 | $15.00 | $8.00 | $120.00 |
| 87 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 56 | $20.00 | $13.00 | $160.00 |
| 88 | Patching concrete structure (519E11100) | SF | 47 | $175.00 | $180.00 | $900.00 |
| 89 | Reinforced concrete approach slabs (T=15"), as per plan (526E25001) | SY | 180 | $400.00 | $600.00 | $680.00 |
| 90 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,000 | $15,000 | $14,500 |
| 91 | Maintaining traffic (614E11000) | LS | 1 | $20,000 | $12,500 | $17,500 |
| 92 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $20,000 | $25,000 | $75,000 |
| 93 | Mobilization (624E10000) | LS | 1 | $113,500 | $121,000 | $95,000 |
| 94 | Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000) | DLR | 1,500 | $21.00 | $21.00 | $3.00 |
| 95 | Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000) | DLR | 1,500 | $75.00 | $75.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.