ODOT contract 250206 bid tabulation

D11-DS-FY2025 (BRIDGE REPAIR). Let by Ohio DOT on April 10, 2025, District 11. 3 bids received; low bid $215,471 by BCC Ohio Inc, +0.2% against the engineer's estimate of $215,000.

Owner
Ohio DOT
Letting
10 APR 2025
Pay items
21
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1BCC Ohio Inc$215,471Low0.0%
2S E T Inc$259,686+21%+21%
3Ram Construction Services of Michigan, Inc$287,135+33%+34%
ODOT contract 250206: bids by rank

Engineer's estimate: $215,000.

Bid tabulation

LinePay itemUnitQuantity1. BCC Ohio Inc2. S E T Inc3. Ram Construction Services of Michigan, Inc
1Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
2Edge line, 6" (646E10010)MI0.14$15,960$16,000$15,200
3Center line (646E10200)MI0.07$27,405$27,500$26,100
4Lane arrow (646E20300)EACH1$210.00$210.00$200.00
5Wet reflective epoxy pavement marking, edge line, 6" (807E12010)MI0.50$20,160$20,000$19,200
6Wet reflective epoxy pavement marking, lane line, 6" (807E12110)MI0.25$9,649.52$9,700.00$9,190.00
7Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310)FT437$4.20$4.20$4.00
8Wet reflective epoxy pavement marking, dotted line, 6" (807E12410)FT492$2.10$2.10$2.00
9Law enforcement officer with patrol car for assistance (614E11110)HR60$78.75$100.00$100.00
10Work zone lane line, class III, 6", 642 paint (614E20560)MI0.25$14,175$8,000.00$13,500
11Work zone center line, class III, 642 paint (614E21550)MI0.07$23,625$8,000.00$22,500
12Work zone edge line, class III, 6", 642 paint (614E22360)MI0.64$4,068.75$1,500.00$3,875.00
13Work zone channelizing line, class III, 12", 642 paint (614E23690)FT437$6.20$2.00$3.50
14Work zone dotted line, class III, 6", 642 paint (614E24612)FT492$4.78$1.00$4.55
15Sealing concrete bridge decks with HMWM resin (512E10300)SY7,878$15.49$14.50$18.21
16Removal of existing pavement marking (512E74500)FT6,017$2.40$1.30$2.87
17Removal of existing pavement marking (512E74520)EACH1$234.00$180.00$150.00
18Special - debris removal (690E98100)FT3,383$1.10$1.30$1.00
19Premium for contract performance bond and for payment bond (103E05000)LS1$2,660.00$4,000.00$3,000.00
20Maintaining traffic (614E11000)LS1$22,290$63,000$59,317
21Mobilization (624E10000)LS1$11,783$34,500$23,575
ODOT contract 250206: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy