ODOT contract 250111 bid tabulation

D11-GR FY2025 (GUARDRAIL REBUILDING). Let by Ohio DOT on February 13, 2025, District 11. 2 bids received; low bid $1,410,325 by Lake Erie Construction Company, -6.8% against the engineer's estimate of $1,514,000.

Owner
Ohio DOT
Letting
13 FEB 2025
Pay items
62
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Lake Erie Construction Company$1,410,325Low-7.0%
2PDK Construction Inc$1,466,738+4.0%-3.0%
ODOT contract 250111: bids by rank

Engineer's estimate: $1,514,000.

Bid tabulation

LinePay itemUnitQuantity1. Lake Erie Construction Company2. PDK Construction Inc
1Guardrail removed, as per plan (202E38001)FT42,860$2.20$2.30
2Embankment (203E20000)CY100$76.00$75.00
3Borrow (203E40000)CY50$64.00$68.00
4Reshaping under guardrail (209E15050)MI8.11$600.00$792.00
5Guardrail, type 5 (606E13000)FT1,106.25$16.60$22.48
6Guardrail, type 5A (606E13050)FT100$24.80$25.98
7Guardrail, type MGS (606E15050)FT19,726.25$16.80$18.40
8Guardrail, type MGS, as per plan (606E15051)FT56.25$48.00$116.00
9Guardrail, type MGS with long posts (606E15100)FT16,306.25$18.40$19.32
10Guardrail, type MGS half post spacing (606E15150)FT387.50$26.80$27.94
11Guardrail rebuilt, as per plan (606E16001)FT500$8.40$9.60
12Guardrail, type MGS, long-span (606E17360)FT43.75$24.80$19.88
13Guardrail post, 9 feet (606E18500)EACH25$35.00$31.00
14Rounded end section (606E20050)EACH1$50.00$50.00
15Anchor assembly, type A (606E25000)EACH3$1,360.00$1,500.00
16Anchor assembly, MGS type A (606E25550)EACH4$1,440.00$1,600.00
17Anchor assembly, type B (606E26000)EACH2$2,250.00$2,200.00
18Anchor assembly, MGS type B (606E26050)EACH3$2,420.00$2,400.00
19Anchor assembly, type E (606E26100)EACH2$2,850.00$2,700.00
20Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH95$2,345.00$2,240.00
21Anchor assembly, MGS type E (NCHRP 350 or MASH 201 (606E26150)EACH42$2,395.00$2,240.00
22Anchor assembly, type T (606E26500)EACH3$875.00$900.00
23Anchor assembly, MGS type T (606E26550)EACH38$1,125.00$1,000.00
24Anchor assembly rebuilt, type A (606E27800)EACH2$650.00$850.00
25Anchor assembly rebuilt, MGS type A (606E27810)EACH7$725.00$900.00
26Anchor assembly rebuilt, type B (606E27840)EACH1$1,050.00$900.00
27Anchor assembly rebuilt, MGS type B (606E27846)EACH1$1,100.00$1,200.00
28Anchor assembly rebuilt, type E (606E27850)EACH1$1,950.00$1,200.00
29Anchor assembly rebuilt, MGS type E (606E27860)EACH1$2,000.00$1,300.00
30Anchor assembly rebuilt, type T (606E27900)EACH1$675.00$625.00
31Anchor assembly rebuilt, MGS type T (606E27910)EACH1$950.00$900.00
32Bridge terminal assembly, type 4 (606E35140)EACH4$975.00$650.00
33Bridge terminal assembly, type 4, as per plan (606E35141)EACH2$1,000.00$725.00
34Special - cable barrier, replacement cable (606E55020)FT100$8.00$8.00
35Special - cable barrier, concrete line post foundation (606E55100)EACH5$280.00$300.00
36Special - cable barrier, concrete anchor foundation with sleeve (606E55110)EACH2$450.00$500.00
37Special - cable barrier, anchor post (606E55140)EACH5$220.00$235.00
38Special - cable barrier, terminal strut (606E55160)EACH5$225.00$210.00
39Special - cable barrier, turnbuckle (606E55170)EACH4$300.00$300.00
40Special - cable barrier, splice (606E55180)EACH5$275.00$350.00
41Special - cable barrier, post reflector (606E55190)EACH50$12.50$13.00
42Special - cable barrier, tensioning (606E55200)EACH4$345.00$500.00
43Special - cable barrier, anchor reconstructed (606E55210)EACH10$1,925.00$1,400.00
44Special - cable barrier, anchor post reset (606E55220)EACH2$425.00$125.00
45Impact attenuator, type 1 (bidirectional) (606E60012)EACH2$4,875.00$4,500.00
46Impact attenuator, type 2 (bidirectional), as per plan (606E60029)EACH2$23,500$30,000
47Guardrail, misc.: rail panel (606E98000)FT1,000$10.00$12.00
48Guardrail, misc.: anchor buckle replacement (606E98100)EACH4$350.00$400.00
49Guardrail, misc.: anchor trigger post (606E98100)EACH2$420.00$450.00
50Guardrail, misc.: guardrail, misc.: tensioned cabl (606E98100)EACH5$2,420.00$1,450.00
51Guardrail, misc.: line post (606E98100)EACH100$85.00$140.00
52Seeding and mulching (659E10000)SY18,626$0.40$0.40
53Commercial fertilizer (659E20000)TON2.51$150.00$200.00
54Lime (659E31000)ACRE3.85$5.00$20.00
55Water (659E35000)MGAL105$0.50$1.00
56Erosion control (832E30000)EACH1,000$1.00$1.00
57Barrier reflector, type 2 BI-directional (626E00110)EACH531$10.60$10.00
58Maintaining traffic, misc.: guardrail repair (614E18000)EACH30$535.00$600.00
59Premium for contract performance bond and for payment bond (103E05000)LS1$14,000$7,500.00
60Maintaining traffic (614E11000)LS1$19,750$12,400
61Construction layout stakes and surveying (623E10000)LS1$1,330.00$500.00
62Mobilization (624E10000)LS1$27,500$44,900
ODOT contract 250111: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy