ODOT contract 250231 bid tabulation
WAS-SR 550-16.24 (CULVERT REPLACEMENT). Let by Ohio DOT on April 24, 2025, WAS. 5 bids received; low bid $513,554 by Alan Stone Co Inc, -0.3% against the engineer's estimate of $515,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 45
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $513,554 | Low | 0.0% |
| 2 | Parker Corporation | $544,694 | +6.0% | +6.0% |
| 3 | Axis Civil Construction LLC | $592,616 | +15% | +15% |
| 4 | Ohio-West Virginia Excavating Co | $609,000 | +19% | +18% |
| 5 | R C Construction Company and Son Inc | $636,759 | +24% | +24% |
Engineer's estimate: $515,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Parker Corporation | 3. Axis Civil Construction LLC | 4. Ohio-West Virginia Excavating Co | 5. R C Construction Company and Son Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $12,000 | $44,600 | $10,000 | $36,500 | $10,000 |
| 2 | Headwall removed (202E20010) | EACH | 2 | $470.00 | $500.00 | $500.00 | $1,135.00 | $1,500.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 15 | $10.00 | $100.00 | $55.00 | $58.00 | $50.00 |
| 4 | Guardrail removed (202E38000) | FT | 505 | $2.50 | $2.00 | $7.00 | $10.40 | $5.00 |
| 5 | Special - fill and plug existing conduit (202E70000) | FT | 43 | $140.00 | $150.00 | $185.00 | $188.00 | $200.00 |
| 6 | Excavation (203E10000) | CY | 1,108 | $35.00 | $20.00 | $25.00 | $27.75 | $15.00 |
| 7 | Embankment (203E20000) | CY | 2,422 | $35.00 | $30.00 | $32.00 | $40.50 | $30.00 |
| 8 | Subgrade compaction (204E10000) | SY | 258 | $5.00 | $0.50 | $3.50 | $1.25 | $2.00 |
| 9 | Guardrail, type MGS (606E15050) | FT | 425 | $25.00 | $24.48 | $32.80 | $32.80 | $30.00 |
| 10 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 4 | $2,800.00 | $2,350.00 | $2,750.00 | $3,150.00 | $3,200.00 |
| 11 | Rock channel protection, type B with filter (601E32100) | CY | 12 | $280.00 | $65.00 | $165.00 | $278.00 | $195.00 |
| 12 | Paved gutter, type 4 (601E39000) | FT | 125 | $70.00 | $150.00 | $110.00 | $180.00 | $100.00 |
| 13 | Seeding and mulching (659E10000) | SY | 3,553 | $2.00 | $1.00 | $1.10 | $1.50 | $5.00 |
| 14 | Commercial fertilizer (659E20000) | TON | 0.32 | $1,100.00 | $1,563.00 | $1,250.00 | $1,675.00 | $1,900.00 |
| 15 | Lime (659E31000) | ACRE | 0.74 | $190.00 | $676.00 | $150.00 | $200.00 | $1,500.00 |
| 16 | Water (659E35000) | MGAL | 20 | $1.00 | $0.05 | $1.00 | $1.00 | $1.00 |
| 17 | Erosion control (832E30000) | EACH | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $5,100.00 | $1,000.00 | $8,500.00 | $13,500 | $15,000 |
| 19 | Concrete masonry, as per plan (602E20001) | CY | 15.60 | $1,800.00 | $950.00 | $3,000.00 | $2,625.00 | $2,500.00 |
| 20 | Aggregate drains (605E31100) | FT | 86 | $30.00 | $10.00 | $25.00 | $48.00 | $25.00 |
| 21 | Conduit, bored or jacked, 36" conduit, type A, 748 (611E96600) | FT | 100 | $1,100.00 | $1,700.00 | $1,500.00 | $711.00 | $1,500.00 |
| 22 | Pavement planing, asphalt concrete, (T varies, 1.5 (254E01000) | SY | 1,228 | $10.00 | $8.00 | $10.00 | $5.50 | $30.00 |
| 23 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 47 | $360.00 | $401.00 | $530.00 | $445.50 | $410.00 |
| 24 | Aggregate base (304E20000) | CY | 75 | $120.00 | $65.00 | $220.00 | $133.20 | $150.00 |
| 25 | Non-tracking tack coat (407E20000) | GAL | 115 | $6.00 | $4.50 | $5.00 | $6.70 | $10.00 |
| 26 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 52 | $410.00 | $431.00 | $480.00 | $470.50 | $450.00 |
| 27 | Raised pavement marker removed (621E54000) | EACH | 11 | $20.00 | $20.00 | $20.00 | $75.00 | $50.00 |
| 28 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 9 | $15.00 | $12.00 | $150.00 | $16.00 | $25.00 |
| 29 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $430.00 | $100.00 | $12.50 | $67.00 | $200.00 |
| 30 | Removal of ground mounted post support and reerection (630E86010) | EACH | 2 | $220.00 | $100.00 | $75.00 | $67.00 | $200.00 |
| 31 | Edge line, 6", type 1 (642E00104) | MI | 0.37 | $2,500.00 | $2,250.00 | $2,250.00 | $3,000.00 | $15,000 |
| 32 | Center line, type 1 (642E00300) | MI | 0.20 | $4,000.00 | $3,550.00 | $3,550.00 | $4,750.00 | $15,000 |
| 33 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $3,100.00 | $1,500.00 | $2,400.00 | $3,950.00 | $2,500.00 |
| 34 | Work zone lighting system (614E12740) | EACH | 1 | $1.00 | $200.00 | $500.00 | $9,850.00 | $12,500 |
| 35 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 44 | $25.00 | $10.00 | $20.00 | $27.00 | $25.00 |
| 36 | Object marker, two way (614E13360) | EACH | 28 | $25.00 | $10.00 | $30.00 | $32.00 | $25.00 |
| 37 | Work zone center line, class I (614E21000) | MI | 0.10 | $14,000 | $10,000 | $12,000 | $16,100 | $12,500 |
| 38 | Work zone edge line, class I, 4" (614E22000) | MI | 0.76 | $2,500.00 | $1,974.00 | $2,250.00 | $3,000.00 | $12,500 |
| 39 | Work zone stop line, class I (614E26000) | FT | 43 | $15.00 | $10.00 | $12.00 | $16.00 | $200.00 |
| 40 | Portable barrier, unanchored (622E41100) | FT | 612 | $16.00 | $10.00 | $48.00 | $51.50 | $30.00 |
| 41 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,000.00 | $17,100 | $6,500.00 | $8,160.00 | $18,000 |
| 42 | Maintaining traffic (614E11000) | LS | 1 | $41,000 | $26,600 | $32,000 | $51,500 | $30,000 |
| 43 | Construction layout stakes and surveying (623E10000) | LS | 1 | $18,000 | $14,600 | $8,500.00 | $6,070.00 | $15,000 |
| 44 | Mobilization (624E10000) | LS | 1 | $19,000 | $25,600 | $25,000 | $37,500 | $20,000 |
| 100 | Removal misc.:test and cap abandoned lines (202E98100) | EACH | 5 | $500.00 | $400.00 | $1,500.00 | $300.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.