ODOT contract 250039 bid tabulation

VIN-SR 328-08.97 (SLIDE REPAIR). Let by Ohio DOT on January 16, 2025, VIN. 7 bids received; low bid $156,266 by MC Kee Paving & Sealing LLC, +3.5% against the engineer's estimate of $151,000.

Owner
Ohio DOT
Letting
16 JAN 2025
Pay items
24
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1MC Kee Paving & Sealing LLC$156,266Low+3.0%
2Axis Civil Construction LLC$165,849+6.0%+10%
3D G M Inc$188,532+21%+25%
4R C Construction Company and Son Inc$188,625+21%+25%
5Parker Corporation$195,403+25%+29%
6Alan Stone Co Inc$230,847+48%+53%
7Skeens Excavating Inc$259,029+66%+72%
ODOT contract 250039: bids by rank

Engineer's estimate: $151,000.

Bid tabulation

LinePay itemUnitQuantity1. MC Kee Paving & Sealing LLC2. Axis Civil Construction LLC3. D G M Inc4. R C Construction Company and Son Inc5. Parker Corporation6. Alan Stone Co Inc
1Clearing and grubbing (201E11000)LS1$12,000$20,000$16,000$5,000.00$30,000$25,000
2Excavation, as per plan (203E10001)CY1,340$40.00$33.00$54.00$65.00$40.00$45.00
3Seeding and mulching (659E10000)SY931$4.15$6.00$4.00$5.00$3.00$3.00
4Commercial fertilizer (659E20000)TON1$1,250.00$850.00$1,500.00$2,000.00$1,000.00$690.00
5Lime (659E31000)ACRE0.19$1,000.00$200.00$300.00$2,000.00$5,264.00$990.00
6Water (659E35000)MGAL5$1.00$1.00$1.00$1.00$1.00$1.00
7Erosion control (832E30000)EACH3,000$1.00$1.00$1.00$1.00$1.00$1.00
8Non-tracking tack coat (407E20000)GAL73$5.00$7.00$3.50$10.00$5.00$7.00
9Prime coat (408E10000)GAL116$11.00$4.00$5.00$25.00$5.00$25.00
10Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000)CY62$375.00$450.00$475.00$450.00$500.00$490.00
11Compacted aggregate (617E10100)CY12$200.00$240.00$150.00$100.00$100.00$320.00
12Edge line, 6", type 1 (642E00104)MI0.25$4,050.00$3,250.00$3,500.00$4,500.00$6,000.00$14,000
13Center line, type 1 (642E00300)MI0.13$6,750.00$5,400.00$6,500.00$6,000.00$11,539$14,000
14Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH2$3,000.00$2,200.00$2,200.00$250.00$1,500.00$2,700.00
15Work zone lighting system (614E12740)EACH1$7,000.00$1,000.00$2,000.00$250.00$200.00$4,100.00
16Barrier reflector, type 1, bidirectional (614E13310)EACH8$62.50$25.00$25.00$10.00$10.00$15.00
17Object marker, two way (614E13360)EACH8$64.50$35.00$25.00$10.00$10.00$25.00
18Work zone edge line, class I, 6", 740.06, type I (614E22210)MI0.20$12,750$10,200$10,000$100.00$7,500.00$11,000
19Work zone stop line, class I (614E26000)FT20$17.50$14.00$25.00$1.00$10.00$10.00
20Portable barrier, unanchored (622E41100)FT380$27.00$36.00$31.00$5.00$10.00$25.00
21Premium for contract performance bond and for payment bond (103E05000)LS1$3,000.00$2,000.00$10,000$14,000$7,000.00$4,000.00
22Maintaining traffic (614E11000)LS1$8,000.00$15,000$11,000$15,000$22,000$43,000
23Construction layout stakes and surveying (623E10000)LS1$5,000.00$5,000.00$5,000.00$10,000$15,000$9,200.00
24Mobilization (624E10000)LS1$10,000$15,000$11,000$10,000$15,000$18,000
ODOT contract 250039: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy