ODOT contract 250011 bid tabulation
GAL-SR 218/VAR-14.77/VAR (CULVERT REPLACEMENT). Let by Ohio DOT on January 16, 2025, GAL. 4 bids received; low bid $997,612 by Parker Corporation, -3.8% against the engineer's estimate of $1,037,000.
- Owner
- Ohio DOT
- Letting
- 16 JAN 2025
- Pay items
- 67
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Parker Corporation | $997,612 | Low | -4.0% |
| 2 | R C Construction Company and Son Inc | $1,051,476 | +5.0% | +1.0% |
| 3 | Axis Civil Construction LLC | $1,111,627 | +11% | +7.0% |
| 4 | D G M Inc | $1,381,950 | +39% | +33% |
Engineer's estimate: $1,037,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parker Corporation | 2. R C Construction Company and Son Inc | 3. Axis Civil Construction LLC | 4. D G M Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $32,063 | $1,500.00 | $15,000 | $30,000 |
| 2 | Structure removed (202E11000) | LS | 1 | $32,063 | $5,000.00 | $10,000 | $25,000 |
| 3 | Headwall removed (202E20010) | EACH | 4 | $500.00 | $1,500.00 | $1,000.00 | $750.00 |
| 4 | Walk removed (202E30000) | SF | 23 | $20.00 | $20.00 | $10.00 | $20.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 54 | $10.00 | $25.00 | $15.00 | $15.00 |
| 6 | Pipe removed, over 24" diameter (202E35200) | FT | 97 | $124.00 | $100.00 | $75.00 | $375.00 |
| 7 | Guardrail removed (202E38000) | FT | 255 | $2.00 | $5.00 | $6.00 | $1.00 |
| 8 | Guardrail removed for reuse (202E38200) | FT | 50 | $2.00 | $20.00 | $10.00 | $20.00 |
| 9 | Fence removed (202E75000) | FT | 146 | $2.00 | $10.00 | $5.00 | $5.00 |
| 10 | Fence removed for reuse (202E75200) | FT | 56 | $2.00 | $20.00 | $10.00 | $25.00 |
| 11 | Excavation (203E10000) | CY | 942 | $20.00 | $20.00 | $35.00 | $35.00 |
| 12 | Embankment (203E20000) | CY | 569 | $20.00 | $20.00 | $35.00 | $35.00 |
| 13 | Subgrade compaction (204E10000) | SY | 911 | $0.50 | $2.00 | $3.00 | $15.00 |
| 14 | Guardrail, type MGS (606E15050) | FT | 850 | $26.00 | $27.00 | $22.50 | $24.00 |
| 15 | Guardrail, type MGS with long posts (606E15100) | FT | 137.50 | $27.50 | $28.00 | $29.00 | $30.00 |
| 16 | Guardrail rebuilt, type MGS (606E16050) | FT | 50 | $10.00 | $28.00 | $8.00 | $10.00 |
| 17 | Guardrail, type MGS, long-span (606E17360) | FT | 87.50 | $30.00 | $28.00 | $32.00 | $35.00 |
| 18 | Anchor assembly, MGS type A (606E25550) | EACH | 4 | $1,600.00 | $1,410.00 | $1,400.00 | $1,450.00 |
| 19 | Anchor assembly, MGS type T (606E26550) | EACH | 8 | $1,250.00 | $1,100.00 | $1,200.00 | $1,250.00 |
| 20 | Fence, type 47 (607E15000) | FT | 136 | $30.00 | $51.00 | $49.75 | $55.00 |
| 21 | Fence rebuilt (607E23100) | FT | 56 | $40.00 | $50.00 | $49.75 | $55.00 |
| 22 | 4" concrete walk (608E10000) | SF | 23 | $40.00 | $50.00 | $50.00 | $30.00 |
| 23 | Reference monument, type A (623E40500) | EACH | 13 | $600.00 | $500.00 | $600.00 | $500.00 |
| 24 | Special - mailbox support system, multiple (690E50300) | EACH | 3 | $200.00 | $500.00 | $400.00 | $225.00 |
| 25 | Rock channel protection, type A with filter (601E32000) | CY | 40 | $65.00 | $100.00 | $135.00 | $140.00 |
| 26 | Rock channel protection, type B with filter (601E32100) | CY | 92 | $65.00 | $100.00 | $135.00 | $130.00 |
| 27 | Seeding and mulching (659E10000) | SY | 4,893 | $1.00 | $3.00 | $2.25 | $3.00 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.45 | $2,000.00 | $2,000.00 | $1,250.00 | $1,500.00 |
| 29 | Lime (659E31000) | ACRE | 1.02 | $883.00 | $1,800.00 | $150.00 | $300.00 |
| 30 | Water (659E35000) | MGAL | 14 | $0.05 | $1.00 | $1.00 | $1.00 |
| 31 | Erosion control (832E30000) | EACH | 6,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 32 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $42,730 | $25,000 | $30,000 | $60,000 |
| 33 | Unclassified excavation (503E21300) | LS | 1 | $33,730 | $15,000 | $30,000 | $9,000.00 |
| 34 | Concrete masonry (602E20000) | CY | 54.40 | $650.00 | $1,500.00 | $1,650.00 | $1,000.00 |
| 35 | Aggregate drains (605E31100) | FT | 81 | $10.00 | $10.00 | $35.00 | $35.00 |
| 36 | 12" conduit, type C (611E04600) | FT | 40 | $65.00 | $55.00 | $45.00 | $120.00 |
| 37 | 12" conduit, type D (611E04900) | FT | 94 | $65.00 | $100.00 | $45.00 | $120.00 |
| 38 | 60" conduit, type A, as per plan, 706.02 (611E23601) | FT | 44 | $870.00 | $1,500.00 | $650.00 | $1,500.00 |
| 39 | 58" X 91" conduit, type A, 706.04, as per plan (611E53401) | FT | 60 | $1,068.00 | $1,500.00 | $1,200.00 | $1,850.00 |
| 40 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $3,500.00 | $3,500.00 | $2,800.00 | $4,500.00 |
| 41 | Low strength mortar backfill (type 2) (613E41300) | CY | 257 | $160.00 | $200.00 | $168.00 | $150.00 |
| 42 | Concrete masonry (602E20000) | CY | 34.20 | $650.00 | $1,500.00 | $1,600.00 | $1,100.00 |
| 43 | 72" conduit, type A, as per plan, 706.02 (611E26001) | FT | 58 | $846.00 | $1,500.00 | $1,700.00 | $1,500.00 |
| 44 | Low strength mortar backfill (type 2) (613E41300) | CY | 186 | $160.00 | $200.00 | $175.00 | $170.00 |
| 48 | Pavement repair (253E02000) | CY | 225 | $101.00 | $10.00 | $325.00 | $292.00 |
| 49 | Pavement planing, asphalt concrete (1.5" depth) (254E01000) | SY | 2,285 | $8.00 | $7.00 | $10.00 | $15.00 |
| 50 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 146 | $401.00 | $325.00 | $390.00 | $530.00 |
| 51 | Aggregate base (304E20000) | CY | 158 | $65.00 | $100.00 | $150.00 | $160.00 |
| 52 | Non-tracking tack coat (407E20000) | GAL | 379 | $5.50 | $10.00 | $5.00 | $3.90 |
| 53 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 198 | $401.00 | $390.00 | $395.00 | $400.00 |
| 54 | Raised pavement marker removed (621E54000) | EACH | 13 | $20.00 | $50.00 | $25.00 | $1.00 |
| 55 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 23 | $12.00 | $10.00 | $13.00 | $14.00 |
| 56 | Edge line, 6", type 1 (642E00104) | MI | 0.56 | $4,400.00 | $4,400.00 | $4,400.00 | $5,000.00 |
| 57 | Center line, type 1 (642E00300) | MI | 0.28 | $7,550.00 | $7,550.00 | $7,550.00 | $8,000.00 |
| 58 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 8 | $1,500.00 | $2,000.00 | $1,650.00 | $2,500.00 |
| 59 | Work zone lighting system (614E12740) | EACH | 2 | $200.00 | $5,000.00 | $500.00 | $2,000.00 |
| 60 | Barrier reflector, type 1 (bidirectional) (614E13310) | EACH | 22 | $10.00 | $64.00 | $20.00 | $25.00 |
| 61 | Object marker, two way (614E13360) | EACH | 22 | $10.00 | $64.00 | $30.00 | $25.00 |
| 62 | Work zone edge line, class I, 4" (614E22000) | MI | 0.57 | $4,750.00 | $12,500 | $5,750.00 | $8,000.00 |
| 63 | Work zone stop line, class I (614E26000) | FT | 40 | $10.00 | $100.00 | $14.00 | $20.00 |
| 64 | Roads for maintaining traffic (615E10000) | LS | 1 | $10,000 | $10,000 | $5,000.00 | $2,000.00 |
| 65 | Pavement for maintaining traffic, class A, as per plan (615E20001) | SY | 191 | $75.00 | $150.00 | $110.00 | $170.00 |
| 66 | Portable barrier, unanchored (622E41100) | FT | 420 | $10.00 | $25.00 | $38.00 | $30.00 |
| 67 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $41,740 | $45,000 | $8,500.00 | $60,000 |
| 68 | Maintaining traffic (614E11000) | LS | 1 | $53,730 | $35,000 | $40,000 | $85,000 |
| 69 | Construction layout stakes and surveying (623E10000) | LS | 1 | $39,730 | $12,500 | $16,000 | $30,000 |
| 70 | Mobilization (624E10000) | LS | 1 | $58,980 | $20,000 | $40,000 | $55,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 16, 2025. Compiled by Mirage Metrics.