ODOT contract 250222 bid tabulation
OTT-SR 163-24.22 PC Shore Revtmt (SLIDE REPAIR). Let by Ohio DOT on April 24, 2025, OTT. 10 bids received; low bid $3,386,581 by Mark Haynes Construction Inc, -35% against the engineer's estimate of $5,186,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 26
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mark Haynes Construction Inc | $3,386,581 | Low | -35% |
| 2 | Shoreline Contractors | $3,386,790 | 0.0% | -35% |
| 3 | Geo Gradel Co | $3,530,241 | +4.0% | -32% |
| 4 | Kwest Group LLC | $3,760,896 | +11% | -27% |
| 5 | Mark Schaffer Excavating & Trucking Inc | $3,884,521 | +15% | -25% |
| 6 | Great Lakes Demolition Company | $3,898,459 | +15% | -25% |
| 7 | Great Lakes Construction Co | $4,151,799 | +23% | -20% |
| 8 | Beaver Excavating Company | $4,918,495 | +45% | -5.0% |
| 9 | Michels Corporation | $5,081,584 | +50% | -2.0% |
| 10 | V3 Construction Group LTD | $6,130,000 | +81% | +18% |
Engineer's estimate: $5,186,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mark Haynes Construction Inc | 2. Shoreline Contractors | 3. Geo Gradel Co | 4. Kwest Group LLC | 5. Mark Schaffer Excavating & Trucking Inc | 6. Great Lakes Demolition Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $4,900.00 | $25,000 | $2,000.00 | $2,500.00 | $158,734 | $500.00 |
| 2 | Excavation (203E10000) | CY | 14,182 | $7.45 | $16.00 | $23.50 | $23.00 | $25.00 | $25.00 |
| 3 | Roadway, misc.:rock channel protection: armour sto (203E98200) | TON | 14,716 | $93.00 | $65.00 | $66.00 | $65.00 | $70.00 | $95.00 |
| 4 | Roadway, misc.:rock channel protection: crest ston (203E98200) | TON | 2,738 | $93.00 | $65.00 | $109.00 | $112.00 | $140.00 | $120.00 |
| 5 | Roadway, misc.:rock channel protection: toe stone (203E98200) | TON | 2,567 | $93.00 | $65.00 | $111.00 | $115.00 | $140.00 | $120.00 |
| 6 | Geotextile fabric (204E50000) | SY | 16,688 | $1.60 | $7.00 | $10.00 | $2.00 | $1.50 | $3.00 |
| 7 | Geogrid, as per plan (204E51001) | SY | 9,240 | $3.20 | $8.00 | $15.00 | $6.00 | $10.50 | $7.00 |
| 8 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $10,000 | $28,800 | $55,000 | $299,500 | $5,000.00 | $21,000 |
| 9 | Concrete slope protection, as per plan (601E21001) | SY | 2,738 | $113.00 | $129.75 | $93.00 | $84.00 | $90.00 | $87.00 |
| 10 | Rock channel protection, misc.: underlayer stone, (601E35000) | CY | 8,670 | $72.00 | $99.00 | $72.00 | $87.00 | $105.00 | $87.00 |
| 11 | Manhole adjusted to grade (611E99654) | EACH | 1 | $4,500.00 | $2,898.00 | $900.00 | $2,200.00 | $1,000.00 | $90.00 |
| 12 | Monument assembly, type C (623E38500) | EACH | 5 | $1,500.00 | $2,024.82 | $1,800.00 | $4,000.00 | $1,500.00 | $950.00 |
| 13 | Topsoil furnished and placed (653E10000) | CY | 235 | $65.50 | $100.28 | $60.00 | $8.50 | $40.00 | $45.00 |
| 14 | Seeding and mulching (659E10000) | SY | 2,078 | $6.75 | $4.25 | $1.80 | $3.75 | $2.50 | $3.00 |
| 15 | Storm water pollution prevention plan (832E15000) | LS | 1 | $8,080.00 | $8,250.00 | $975.00 | $2,425.00 | $2,500.00 | $1,200.00 |
| 16 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,650.00 | $6,600.00 | $6,600.00 | $7,140.00 | $4,000.00 | $6,500.00 |
| 17 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $8,500.00 | $2,200.00 | $18,000 | $15,000 | $10,000 | $20,000 |
| 18 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,060.00 | $1,140.00 | $805.00 | $1,563.00 | $900.00 | $850.00 |
| 20 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $34,200 | $39,000 | $33,000 | $30,000 | $30,000 | $27,000 |
| 21 | CPM progress schedule (108E10000) | LS | 1 | $6,250.00 | $15,000 | $30,000 | $3,000.00 | $2,000.00 | $6,500.00 |
| 22 | Maintaining traffic (614E11000) | LS | 1 | $134,600 | $130,000 | $120,000 | $111,000 | $60,000 | $25,000 |
| 23 | Field office, type B (619E16010) | MNTH | 6 | $1,875.00 | $1,824.56 | $2,000.00 | $5,900.00 | $1,200.00 | $2,500.00 |
| 24 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,500 | $4,000.00 | $27,000 | $6,500.00 | $10,000 | $10,000 |
| 25 | Mobilization (624E10000) | LS | 1 | $72,000 | $86,000 | $100,000 | $175,000 | $100,000 | $163,500 |
| 100 | Pavement repair (253E02000) | CY | 100 | $550.00 | $292.95 | $60.00 | $550.00 | $450.00 | $640.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.