Mark Schaffer Excavating & Trucking Inc: ODOT bid record
Mark Schaffer Excavating & Trucking Inc submitted 17 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 08 MAY 2025, and was the low bidder on 2 of them (12%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $2,906,638
- Latest bid
- 08 MAY 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 4 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 3 | 1 | 33% |
| 2025 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CRA | 2 | 0 | 0% |
| HUR | 2 | 1 | 50% |
| OTT | 2 | 0 | 0% |
| PAU | 1 | 0 | 0% |
| SAN | 1 | 0 | 0% |
| POR | 1 | 0 | 0% |
| LOR | 1 | 0 | 0% |
| MED | 1 | 0 | 0% |
| DEL | 1 | 0 | 0% |
| KNO | 1 | 0 | 0% |
| CUY | 1 | 0 | 0% |
| ERI | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 17 | 17 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 16 | 9 (56%) | $1.00 | $1.00 |
| Topsoil | 659E00300 | CY | 13 | 9 (69%) | $15.00 | $45.00 |
| Repair seeding and mulching | 659E14000 | SY | 14 | 7 (50%) | $0.86 | $1.25 |
| Seeding and mulching | 659E10000 | SY | 15 | 5 (33%) | $0.92 | $2.60 |
| Lime | 659E31000 | ACRE | 13 | 5 (38%) | $35.00 | $150.00 |
| Inter-seeding | 659E15000 | SY | 13 | 5 (38%) | $0.50 | $1.00 |
| Soil analysis test | 659E00100 | EACH | 12 | 5 (42%) | $50.00 | $115.50 |
| Proof rolling | 204E45000 | HR | 10 | 5 (50%) | $200.00 | $219.05 |
| 12" conduit, type C | 611E04600 | FT | 8 | 5 (63%) | $46.00 | $84.00 |
| Commercial fertilizer | 659E20000 | TON | 16 | 4 (25%) | $750.00 | $850.00 |
| Embankment | 203E20000 | CY | 14 | 4 (29%) | $11.88 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 10 | 4 of 10 |
| Shelly & Sands Inc | 8 | 6 of 8 |
| Great Lakes Demolition Company | 5 | 3 of 5 |
| Vernon Nagel Inc | 4 | 3 of 4 |
| Beaver Excavating Company | 4 | 1 of 4 |
| Kokosing Construction Company Inc | 4 | 4 of 4 |
| Tri-Mor Corp | 4 | 2 of 4 |
| Great Lakes Construction Co | 4 | 2 of 4 |
| Miller Bros Const Inc | 3 | 2 of 3 |
| Karvo Companies Inc | 3 | 2 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAY 2025 | 250257 | OTT | OTT-SR 269-01.78 Roundabout (INTERSECTION) | 3 of 3 | $3,441,703 | +11% |
| 24 APR 2025 | 250222 | OTT | OTT-SR 163-24.22 PC Shore Revtmt (SLIDE REPAIR) | 5 of 10 | $3,884,521 | +15% |
| 23 MAY 2024 | 240321 | TUS | TUS-SR 39-07.62 (MINOR RECONSTRUCTION) | 1 of 4 | $1,258,794 | Low, 4.0% under the second |
| 22 FEB 2024 | 240093 | HUR | HUR-SR 13-00.00 (MINOR RECONSTRUCTION) | 3 of 3 | $13,801,573 | +14% |
| 25 JAN 2024 | 240079 | WYA | WYA-US 23-Rest Areas (MINOR RECONSTRUCTION) | 4 of 6 | $5,620,000 | +7.0% |
| 26 JAN 2023 | 230047 | ERI | ERI-SR 4-04.65 (INTERSECTION) | 3 of 4 | $3,369,544 | +40% |
| 29 SEP 2022 | 220533 | CUY | CUY-US 422-18.74/VAR Slide (SLIDE REPAIR) | 8 of 11 | $1,248,450 | +48% |
| 11 AUG 2022 | 220466 | KNO | KNO-SR 229-14.80 (MISCELLANEOUS) | 2 of 6 | $1,134,222 | +4.0% |
| 17 MAR 2022 | 220169 | CRA | CRA-SR 602-04.25 (MAJOR RECONSTRUCTION) | 3 of 3 | $9,539,912 | +16% |
| 17 FEB 2022 | 220091 | DEL | DEL-US 42-02.28 (MINOR RECONSTRUCTION) | 3 of 3 | $6,189,807 | +29% |
| 12 AUG 2021 | 210472 | MED | MED-SR 57-17.65 (CULVERT REPLACEMENT) | 5 of 11 | $1,549,873 | +16% |
| 01 JUL 2021 | 210389 | HUR | HUR-US 20-17.82 (INTERSECTION) | 1 of 3 | $1,647,844 | Low, 7.0% under the second |
| 15 APR 2021 | 210238 | LOR | LOR-SR 113-03.75 Baumhart Sfty (INTERSECTION) | 4 of 6 | $1,884,835 | +25% |
| 28 JAN 2021 | 210075 | POR | POR-D04 POR IR-76 RA Parking Lots (SPOT SAFETY) | 11 of 12 | $3,876,323 | +20% |
| 03 DEC 2020 | 200578 | SAN | SAN-US 6-15.30 Slope Repair (SLIDE REPAIR) | 9 of 11 | $1,844,429 | +22% |
| 16 JUL 2020 | 200390 | CRA | CRA-US 30-10.92 GSM (MISCELLANEOUS) | 3 of 3 | $859,440 | +18% |
| 13 FEB 2020 | 200070 | PAU | PAU-US 24-05.42/11.52 (SLIDE REPAIR) | 4 of 6 | $1,845,169 | +33% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.