ODOT contract 250234 bid tabulation
D07-PPM FY25 (PAVEMENT MARKING). Let by Ohio DOT on April 24, 2025, District 7. 2 bids received; low bid $1,076,000 by The Aero-Mark Company LLC, -25% against the engineer's estimate of $1,443,000.
- Owner
- Ohio DOT
- Letting
- 24 APR 2025
- Pay items
- 25
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Aero-Mark Company LLC | $1,076,000 | Low | -25% |
| 2 | Oglesby Construction Inc | $1,175,000 | +9.0% | -19% |
Engineer's estimate: $1,443,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The Aero-Mark Company LLC | 2. Oglesby Construction Inc |
|---|---|---|---|---|---|
| 1 | Pavement marking, misc.:black shadow lane line (642E50000) | MI | 23.68 | $775.00 | $740.00 |
| 2 | Lane line, 6" (643E00204) | MI | 396.97 | $565.00 | $510.00 |
| 3 | Channelizing line, 8" (643E00400) | FT | 70,058 | $0.50 | $0.70 |
| 4 | Channelizing line, 12" (643E00404) | FT | 185,373 | $0.60 | $0.90 |
| 5 | Stop line (643E00500) | FT | 20,966 | $6.00 | $4.50 |
| 6 | Crosswalk line, 12" (643E00620) | FT | 19,414 | $3.00 | $3.00 |
| 7 | Transverse/diagonal line (643E00700) | FT | 34,813 | $3.00 | $4.00 |
| 8 | Railroad symbol marking (643E01000) | EACH | 43 | $380.00 | $500.00 |
| 9 | School symbol marking, 96" (643E01110) | EACH | 37 | $380.00 | $400.00 |
| 10 | Lane arrow (643E01300) | EACH | 1,288 | $70.00 | $65.00 |
| 11 | Wrong way arrow (643E01310) | EACH | 175 | $300.00 | $275.00 |
| 12 | Word on pavement, 96" (643E01410) | EACH | 63 | $76.00 | $115.00 |
| 13 | Dotted line, 4" (643E01500) | FT | 4,310 | $0.70 | $0.80 |
| 14 | Dotted line, 6" (643E01510) | FT | 131,586 | $0.70 | $0.80 |
| 15 | Dotted line, 12" (643E01550) | FT | 33,099 | $0.70 | $1.00 |
| 16 | Bike lane symbol marking (643E01602) | EACH | 20 | $150.00 | $180.00 |
| 17 | Yield line (643E20802) | FT | 169 | $10.00 | $12.00 |
| 18 | Speed measurement marking (643E40000) | EACH | 269 | $150.00 | $140.00 |
| 19 | Pavement marking, misc.:"merge" (643E50100) | EACH | 6 | $375.00 | $100.00 |
| 20 | Pavement marking, misc.:"xing" (643E50100) | EACH | 2 | $375.00 | $80.00 |
| 21 | Pavement marking, misc.:lane reduction arrow (643E50100) | EACH | 21 | $375.00 | $185.00 |
| 22 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $55.00 | $55.00 |
| 23 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,250.65 | $6,000.00 |
| 24 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $26,000 | $34,846 |
| 25 | Mobilization (624E10000) | LS | 1 | $10,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.