ODOT contract 250220 bid tabulation

MAD-Maple Street Bridge (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on April 24, 2025, MAD. 2 bids received; low bid $798,171 by Double Z Construction Company, -6.1% against the engineer's estimate of $850,000.

Owner
Ohio DOT
Letting
24 APR 2025
Pay items
79
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Double Z Construction Company$798,171Low-6.0%
2Complete General Construction Company$978,851+23%+15%
ODOT contract 250220: bids by rank

Engineer's estimate: $850,000.

Bid tabulation

LinePay itemUnitQuantity1. Double Z Construction Company2. Complete General Construction Company
1Clearing and grubbing (201E11000)LS1$9,000.00$9,000.00
2Tree removed, 18" diameter (201E21800)EACH1$1,500.00$2,000.00
3Headwall removed (202E20010)EACH2$700.00$800.00
4Pavement removed (202E23000)SY302$23.00$18.00
5Walk removed (202E30000)SF1,070$2.90$3.00
6Curb removed (202E32000)FT224$11.00$9.00
7Pipe removed (202E34900)FT102$25.00$75.00
8Pipe removed, 24" and under (202E35100)FT22$20.00$35.00
9Pipe removed, over 24" diameter (202E35200)FT34$24.00$80.00
10Manhole removed (202E58000)EACH1$600.00$1,200.00
11Excavation (203E10000)CY84$80.00$36.00
12Embankment (203E20000)CY15$27.00$38.00
13Subgrade compaction (204E10000)SY283$9.50$5.00
144" concrete walk (608E10000)SF534$18.00$9.00
156" concrete walk (608E13000)SF87$22.00$12.00
16Curb ramp (608E52000)SF263$38.00$10.00
17Curb, type 6 (609E26000)FT225$34.00$54.00
18Rock channel protection, type C with filter (601E32200)CY4.50$205.00$200.00
19Soil analysis test (659E00100)EACH2$150.00$150.00
20Topsoil (659E00300)CY50$85.00$48.00
21Seeding and mulching (659E10000)SY445$14.00$7.00
22Repair seeding and mulching (659E14000)SY22$7.00$7.00
23Inter-seeding (659E15000)SY23$7.00$7.00
24Commercial fertilizer (659E20000)TON0.06$1,250.00$1,250.00
25Lime (659E31000)ACRE0.09$150.00$150.00
26Water (659E35000)MGAL2.50$1.00$1.00
27Erosion control (832E30000)EACH10,000$1.00$1.00
28Concrete masonry (602E20000)CY1.10$2,200.00$4,000.00
294" base pipe underdrains, as per plan (605E06001)FT220$14.00$28.00
3018" conduit, type C (611E07600)FT28$105.00$230.00
3136" conduit, type C (611E16600)FT39$225.00$330.00
32Manhole, no. 3 (611E99574)EACH2$4,500.00$6,200.00
33Manhole adjusted to grade (611E99654)EACH1$1,200.00$800.00
34Asphalt concrete base, PG64-22, (449) (301E56000)CY29$385.00$265.00
35Aggregate base (304E20000)CY51$135.00$145.00
36Non-tracking tack coat (407E20000)GAL29$4.40$3.90
37Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY22$390.00$480.00
386" non-reinforced concrete pavement, class QC 1P (452E10010)SY13$69.00$350.00
39Rock channel protection, type C with geotextile fabric (601E32204)CY3$205.00$225.00
40Low strength mortar backfill (613E41200)CY1.30$660.00$225.00
41Special - 8" water main polyvinyl chloride pipe and fittings (638E20420)FT125$230.00$450.00
42Special - valve box adjusted to grade (columbus IT (638E20500)EACH2$475.00$265.00
43Special - 3/4" corporation stop, long (columbus IT (638E20892)EACH1$3,600.00$3,800.00
44Special - 3/4" corporation stop, short (columbus I (638E20892)EACH1$2,200.00$3,700.00
45Manhole adjusted to grade (611E99654)EACH2$1,250.00$750.00
46Removal of ground mounted sign and reerection (630E85100)EACH3$150.00$445.00
47Crosswalk line, 12" (644E00620)FT72$40.00$6.80
48Detour signing (614E12420)LS1$13,000$12,435
49Structure removed, over 20 foot span (202E11002)LS1$50,000$115,000
50Wearing course removed (202E23500)SY86$45.00$19.00
51Cofferdams and excavation bracing (503E11100)LS1$24,000$15,000
52Unclassified excavation (503E21300)LS1$30,000$30,000
53Pile driving equipment mobilization (505E11100)LS1$25,000$26,000
5412" cast-in-place reinforced concrete piles, driven (507E00500)FT350$42.00$15.00
5512" cast-in-place reinforced concrete piles, furnished (507E00550)FT420$57.00$85.00
56Epoxy coated steel reinforcement (509E10000)LB17,339$1.75$2.00
57Class QC2 concrete, superstructure, as per plan (511E31611)CY41$1,505.00$1,500.00
58Class QC1 concrete, abutment including footing (511E43510)CY86$780.00$900.00
59Class QC2 concrete, sidewalk (511E51510)CY18$795.00$700.00
60Sealing of concrete surfaces (non-epoxy) (512E10050)SY69$16.00$20.00
61Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY130$32.00$46.00
62Prestressed concrete composite box beam bridge members, level 1, CB17-48, as per plan (515E12031)EACH9$11,000$14,000
632" preformed expansion joint filler (516E13900)SF28$18.50$16.00
64Integral abutment expansion joint seal (516E14014)FT80$32.00$50.00
652" deep joint sealer (516E31010)FT74$15.50$26.50
661/8" preformed bearing pad, type CDP (516E41100)EACH18$70.00$75.00
67Elastomeric bearing with internal laminates only (neoprene) (516E43100)EACH36$115.00$85.00
68Railing (concrete parapet with twin steel tube railing) (517E75120)FT81$465.00$450.00
69Porous backfill with geotextile fabric (518E21200)CY24$145.00$115.00
706" perforated corrugated plastic pipe (518E40000)FT114$12.50$12.00
716" non-perforated corrugated plastic pipe, including specials (518E40010)FT40$13.00$22.00
72Dynamic load testing (523E20000)EACH1$3,960.00$6,000.00
73Rock channel protection, type C with geotextile fabric (601E32204)CY81$115.00$115.00
74Low strength mortar backfill (613E41200)CY163$175.00$165.00
75Structure grounding system (625E33000)EACH1$11,660$20,000
76Premium for contract performance bond and for payment bond (103E05000)LS1$5,500.00$8,500.00
77Maintaining traffic (614E11000)LS1$10,000$9,000.00
78Construction layout stakes and surveying (623E10000)LS1$6,500.00$16,000
79Mobilization (624E10000)LS1$20,000$50,000
ODOT contract 250220: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy