Wenger Excavating Inc: ODOT bid record

Wenger Excavating Inc submitted 11 bids on Ohio DOT contracts in the data, from 11 FEB 2021 to 24 APR 2025, and was the low bidder on 1 of them (9%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$1,785,586
Latest bid
24 APR 2025
Data through
12 NOV 2026
11Bids
1Low bids
9Win rate, percent
+15%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
2021700%
2022200%
2024100%
202511100%
Wenger Excavating Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
STA9111%
CAR100%
SUM100%
Wenger Excavating Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1111 (100%)$1.00$1.00
Topsoil659E00300CY1010 (100%)$11.50$45.00
Water616E10000MGAL105 (50%)$12.00$20.00
Embankment203E20000CY114 (36%)$20.00$25.00
Pavement removed202E23000SY114 (36%)$11.80$17.00
Repair seeding and mulching659E14000SY104 (40%)$0.80$1.25
Asphalt concrete surface course, type 1, (448), as per plan441E50101CY104 (40%)$188.00$275.00
Asphalt concrete for maintaining traffic614E13000CY94 (44%)$178.00$250.00
Asphalt concrete base, PG64-22301E46000CY74 (57%)$168.00$235.00
6" conduit, type F for underdrain outlets611E00510FT74 (57%)$11.00$26.00
Embankment, as per plan203E20001CY74 (57%)$21.80$47.49
6" unclassified pipe underdrains605E13300FT54 (80%)$12.00$19.17
Wenger Excavating Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
S E T Inc95 of 9
Karvo Companies Inc85 of 8
Eclipse Co LLC74 of 7
Lockhart Concrete Co52 of 5
Shelly & Sands Inc55 of 5
Shelly Company42 of 4
Digioia-Suburban Excavating LLC44 of 4
Stanley Miller Construction Company21 of 2
Tucson Inc22 of 2
Central-Allied Enterprises Inc11 of 1
Wenger Excavating Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
24 APR 2025250228STASTA-SR 687-02.30 (MINOR RECONSTRUCTION)1 of 2$1,785,586Low, 21% under the second
22 FEB 2024240107SUMSUM-Wooster Road West (MAJOR RECONSTRUCTION)5 of 5$10,360,424+17%
01 DEC 2022220643STASTA-SR 43-20.20 (MINOR RECONSTRUCTION)6 of 7$1,561,663+27%
27 JAN 2022220060STASTA-SR 43-09.08 Drainage (CULVERT REPLACEMENT)7 of 7$505,729+51%
16 DEC 2021210666STASTA-SR 172-10.86 (MINOR RECONSTRUCTION)4 of 6$2,200,511+8.0%
02 DEC 2021210627CARCAR-SR 43-16.05 (INTERSECTION)5 of 5$1,555,202+26%
16 SEP 2021210496STASTA-SR 687-03.03 (INTERSECTION)6 of 7$1,505,514+31%
15 APR 2021210244STASTA-SR 241-09.71 (MINOR RECONSTRUCTION)2 of 7$7,889,973+10%
11 MAR 2021210140STASTA-SR 687-00.91 (TWO LANE RESURFACING)2 of 4$2,585,585+3.0%
11 MAR 2021210176STASTA-SR 183-09.84 (MINOR RECONSTRUCTION)3 of 4$1,285,752+13%
11 FEB 2021210099STASTA-SR 619-13.15 (INTERSECTION)4 of 9$1,885,957+9.0%
Wenger Excavating Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy