Kelstin Inc: ODOT bid record

Kelstin Inc submitted 10 bids on Ohio DOT contracts in the data, from 07 MAY 2020 to 19 DEC 2024, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +23% above the low bid.

Owner
Ohio DOT
Low bid volume
$955,552
Latest bid
19 DEC 2024
Data through
12 NOV 2026
10Bids
2Low bids
20Win rate, percent
+23%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20205120%
2021100%
20244125%
Kelstin Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
ASD400%
HUR300%
RIC2150%
MRW11100%
Kelstin Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1010 (100%)$1.00$1.00
Aggregate base304E20000CY94 (44%)$62.50$90.00
Concrete masonry602E20000CY84 (50%)$1,100.00$2,300.00
Riprap, type D601E11000SY64 (67%)$100.00$290.00
Field office, type A619E16000MNTH54 (80%)$500.00$1,400.00
Monument assembly, type C623E38500EACH54 (80%)$120.00$1,000.00
Topsoil659E00300CY103 (30%)$40.00$45.00
Pavement removed202E23000SY93 (33%)$15.00$17.00
Aggregate drains605E31100FT93 (33%)$25.00$20.00
Asphalt concrete surface course, 9.5 MM, type A (4442E10501CY63 (50%)$282.50$320.00
Type 2 waterproofing512E33000SY53 (60%)$30.00$30.00
Class QC1 concrete, footing511E46510CY53 (60%)$400.00$690.00
Kelstin Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Kelstin Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
19 DEC 2024244026ASDASD-SR 511-22.26 (CULVERT REPLACEMENT)4 of 4$337,597+28%
22 FEB 2024244007MRWMRW-SR 314-(08.11) (20.62) (CULVERT REPLACEMENT)1 of 4$789,461Low, 20% under the second
08 FEB 2024244005HURHUR-SR 61-05.62 (CULVERT REPLACEMENT)4 of 4$303,566+92%
11 JAN 2024240040RICRIC-SR 61/SR 598-12.74/00.71 (CULVERT REPLACEMENT)2 of 5$343,327+7.0%
29 APR 2021214010ASDASD-US 42/SR 60-15.05/27.40 (CULVERT REPLACEMENT)4 of 5$384,567+23%
17 DEC 2020204028RICRIC-SR 545-03.77 (CULVERT REPLACEMENT)1 of 6$166,091Low, 4.0% under the second
04 JUN 2020204012ASDASD-SR 60-09.95 (CULVERT REPLACEMENT)5 of 5$253,411+7.0%
21 MAY 2020200297ASDASD-SR 179-04.91 (CULVERT REPLACEMENT)6 of 7$201,788+38%
21 MAY 2020200304HURHUR-SR 60/SR 99-10.78/08.04 (CULVERT REPLACEMENT)6 of 7$402,828+23%
07 MAY 2020200270HURHUR-SR 601-01.85 (CULVERT REPLACEMENT)5 of 8$240,361+15%
Kelstin Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy