Kelstin Inc: ODOT bid record
Kelstin Inc submitted 10 bids on Ohio DOT contracts in the data, from 07 MAY 2020 to 19 DEC 2024, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $955,552
- Latest bid
- 19 DEC 2024
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 1 | 20% |
| 2021 | 1 | 0 | 0% |
| 2024 | 4 | 1 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| ASD | 4 | 0 | 0% |
| HUR | 3 | 0 | 0% |
| RIC | 2 | 1 | 50% |
| MRW | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 10 | 10 (100%) | $1.00 | $1.00 |
| Aggregate base | 304E20000 | CY | 9 | 4 (44%) | $62.50 | $90.00 |
| Concrete masonry | 602E20000 | CY | 8 | 4 (50%) | $1,100.00 | $2,300.00 |
| Riprap, type D | 601E11000 | SY | 6 | 4 (67%) | $100.00 | $290.00 |
| Field office, type A | 619E16000 | MNTH | 5 | 4 (80%) | $500.00 | $1,400.00 |
| Monument assembly, type C | 623E38500 | EACH | 5 | 4 (80%) | $120.00 | $1,000.00 |
| Topsoil | 659E00300 | CY | 10 | 3 (30%) | $40.00 | $45.00 |
| Pavement removed | 202E23000 | SY | 9 | 3 (33%) | $15.00 | $17.00 |
| Aggregate drains | 605E31100 | FT | 9 | 3 (33%) | $25.00 | $20.00 |
| Asphalt concrete surface course, 9.5 MM, type A (4 | 442E10501 | CY | 6 | 3 (50%) | $282.50 | $320.00 |
| Type 2 waterproofing | 512E33000 | SY | 5 | 3 (60%) | $30.00 | $30.00 |
| Class QC1 concrete, footing | 511E46510 | CY | 5 | 3 (60%) | $400.00 | $690.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Great Lakes Demolition Company | 8 | 7 of 8 |
| Eclipse Co LLC | 7 | 5 of 7 |
| BCC Ohio Inc | 5 | 3 of 5 |
| Adena Corporation | 4 | 4 of 4 |
| Rietschlin Construction Inc | 4 | 1 of 4 |
| Lockhart Concrete Co | 3 | 0 of 3 |
| Mosser Construction Inc | 2 | 2 of 2 |
| Stanley Miller Construction Company | 2 | 1 of 2 |
| Crawford Construction Company Inc | 2 | 1 of 2 |
| A J Riley Inc | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 DEC 2024 | 244026 | ASD | ASD-SR 511-22.26 (CULVERT REPLACEMENT) | 4 of 4 | $337,597 | +28% |
| 22 FEB 2024 | 244007 | MRW | MRW-SR 314-(08.11) (20.62) (CULVERT REPLACEMENT) | 1 of 4 | $789,461 | Low, 20% under the second |
| 08 FEB 2024 | 244005 | HUR | HUR-SR 61-05.62 (CULVERT REPLACEMENT) | 4 of 4 | $303,566 | +92% |
| 11 JAN 2024 | 240040 | RIC | RIC-SR 61/SR 598-12.74/00.71 (CULVERT REPLACEMENT) | 2 of 5 | $343,327 | +7.0% |
| 29 APR 2021 | 214010 | ASD | ASD-US 42/SR 60-15.05/27.40 (CULVERT REPLACEMENT) | 4 of 5 | $384,567 | +23% |
| 17 DEC 2020 | 204028 | RIC | RIC-SR 545-03.77 (CULVERT REPLACEMENT) | 1 of 6 | $166,091 | Low, 4.0% under the second |
| 04 JUN 2020 | 204012 | ASD | ASD-SR 60-09.95 (CULVERT REPLACEMENT) | 5 of 5 | $253,411 | +7.0% |
| 21 MAY 2020 | 200297 | ASD | ASD-SR 179-04.91 (CULVERT REPLACEMENT) | 6 of 7 | $201,788 | +38% |
| 21 MAY 2020 | 200304 | HUR | HUR-SR 60/SR 99-10.78/08.04 (CULVERT REPLACEMENT) | 6 of 7 | $402,828 | +23% |
| 07 MAY 2020 | 200270 | HUR | HUR-SR 601-01.85 (CULVERT REPLACEMENT) | 5 of 8 | $240,361 | +15% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.