ODOT contract 260167 bid tabulation
ERI-US 6-Connectivity Corrid. (MAJOR RECONSTRUCTION). Let by Ohio DOT on May 7, 2026, ERI. 3 bids received; low bid $30,841,629 by Great Lakes Demolition Company, +6.3% against the engineer's estimate of $29,001,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 371
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Demolition Company | $30,841,629 | Low | +6.0% |
| 2 | Miller Bros Const Inc | $33,149,790 | +7.0% | +14% |
| 3 | Kokosing Construction Company Inc | $33,466,778 | +9.0% | +15% |
Engineer's estimate: $29,001,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Demolition Company | 2. Miller Bros Const Inc | 3. Kokosing Construction Company Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $12,500 | $15,000 | $50,000 |
| 2 | Headwall removed (202E20010) | EACH | 7 | $450.00 | $1,000.00 | $1,117.83 |
| 3 | Pavement removed (202E23000) | SY | 65,638 | $8.00 | $22.60 | $8.65 |
| 4 | Walk removed (202E30000) | SF | 10,599 | $2.00 | $1.75 | $2.25 |
| 5 | Curb removed (202E32000) | FT | 1,892 | $5.00 | $2.30 | $5.25 |
| 6 | Curb and gutter removed (202E32500) | FT | 3,735 | $5.00 | $2.50 | $4.50 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 5,662 | $20.00 | $43.00 | $13.25 |
| 8 | Pipe removed, over 24" diameter (202E35200) | FT | 118 | $50.00 | $67.00 | $13.75 |
| 9 | Guardrail removed (202E38000) | FT | 5,381 | $2.40 | $2.40 | $2.40 |
| 10 | Mailbox removed (202E53100) | EACH | 52 | $50.00 | $150.00 | $50.00 |
| 11 | Manhole removed (202E58000) | EACH | 6 | $850.00 | $1,100.00 | $750.00 |
| 12 | Catch basin removed (202E58100) | EACH | 26 | $450.00 | $1,100.00 | $550.00 |
| 13 | Fence removed (202E75000) | FT | 1,701 | $5.00 | $3.00 | $3.00 |
| 14 | Gate removed (202E75250) | EACH | 2 | $235.00 | $235.00 | $235.00 |
| 15 | Meter vault removed (202E75600) | EACH | 5 | $500.00 | $1,200.00 | $500.00 |
| 16 | Valve box removed (202E75610) | EACH | 16 | $850.00 | $450.00 | $500.00 |
| 17 | Removal misc.: billboard (202E98100) | EACH | 1 | $1,500.00 | $4,500.00 | $7,500.00 |
| 18 | Removal misc.: boulder (202E98100) | EACH | 35 | $250.00 | $80.00 | $100.00 |
| 19 | Removal misc.: concrete post (202E98100) | EACH | 4 | $250.00 | $115.00 | $100.00 |
| 20 | Removal misc.: electric outlet (202E98100) | EACH | 2 | $500.00 | $100.00 | $250.00 |
| 21 | Removal misc.: flag pole (202E98100) | EACH | 1 | $250.00 | $250.00 | $750.00 |
| 22 | Removal misc.: landscape rock (202E98100) | EACH | 76 | $120.00 | $75.00 | $50.00 |
| 23 | Removal misc.: private light pole (202E98100) | EACH | 6 | $2,500.00 | $300.00 | $1,000.00 |
| 24 | Removal misc.: private sign (202E98100) | EACH | 35 | $50.00 | $250.00 | $550.00 |
| 25 | Removal misc.: steel post (202E98100) | EACH | 9 | $250.00 | $140.00 | $80.00 |
| 26 | Removal misc.: water faucet (202E98100) | EACH | 3 | $500.00 | $600.00 | $180.00 |
| 27 | Removal misc.: wood post (202E98100) | EACH | 9 | $50.00 | $140.00 | $80.00 |
| 28 | Removal misc.: yard art (202E98100) | EACH | 2 | $750.00 | $230.00 | $350.00 |
| 29 | Removal misc.: landscape wall (202E98200) | FT | 38 | $150.00 | $6.00 | $25.00 |
| 30 | Removal misc.: landscape bed (202E98100) | EACH | 4 | $100.00 | $280.00 | $4,100.00 |
| 31 | Special - wick drain (203E07504) | FT | 70,400 | $2.56 | $1.45 | $1.05 |
| 32 | Excavation (203E10000) | CY | 26,370 | $15.00 | $28.50 | $14.00 |
| 33 | Excavation, as per plan (203E10001) | CY | 3,635 | $15.00 | $60.00 | $15.50 |
| 34 | Embankment (203E20000) | CY | 93,806 | $25.00 | $28.50 | $26.00 |
| 35 | Granular material, type C (203E35120) | CY | 3,260 | $65.00 | $45.00 | $65.00 |
| 36 | Special - settlement platform (203E65000) | EACH | 2 | $1,500.00 | $3,500.00 | $550.00 |
| 37 | Subgrade compaction (204E10000) | SY | 15,687 | $1.00 | $4.00 | $6.75 |
| 38 | Excavation of subgrade (204E13000) | CY | 2,554 | $25.00 | $40.00 | $20.00 |
| 39 | Granular material, type B (204E30010) | CY | 2,554 | $65.00 | $60.00 | $54.00 |
| 40 | Proof rolling (204E45000) | HR | 44 | $150.00 | $175.00 | $220.00 |
| 41 | Geogrid (204E51000) | SY | 6,399 | $6.00 | $3.40 | $2.25 |
| 42 | Cement (206E10500) | TON | 3,106 | $240.00 | $205.00 | $205.00 |
| 43 | Curing coat (206E11000) | SY | 102,916 | $1.30 | $1.25 | $1.25 |
| 44 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 102,916 | $5.50 | $4.90 | $5.75 |
| 45 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $55,000 | $42,500 | $42,500 |
| 46 | Guardrail, type MGS (606E15050) | FT | 3,114 | $23.00 | $22.00 | $22.00 |
| 47 | Anchor assembly, MGS type E [MASH 2016] (606E26150) | EACH | 9 | $3,000.00 | $2,820.00 | $2,820.00 |
| 48 | Anchor assembly, MGS type T (606E26550) | EACH | 10 | $1,500.00 | $1,380.00 | $1,380.00 |
| 49 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,800.00 | $2,675.00 | $2,675.00 |
| 50 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $700.00 | $660.00 | $660.00 |
| 51 | Bridge terminal assembly, type 4 (606E35140) | EACH | 4 | $1,500.00 | $1,330.00 | $1,330.00 |
| 52 | Impact attenuator, type 2 (bidirectional), (55MPH, (606E60028) | EACH | 2 | $30,000 | $29,875 | $29,875 |
| 53 | Fence, type 47 (607E15000) | FT | 573 | $23.00 | $21.40 | $21.40 |
| 54 | Fenceline seeding and mulching (607E70000) | FT | 2,159 | $1.00 | $1.00 | $0.90 |
| 55 | Fence, misc.: wood fence (607E98000) | FT | 2,597 | $50.00 | $49.00 | $49.00 |
| 56 | 4" concrete walk (608E10000) | SF | 1,324 | $5.00 | $10.75 | $9.68 |
| 57 | Curb ramp (608E52000) | SF | 9,533 | $14.00 | $10.75 | $23.73 |
| 58 | Concrete barrier, single slope, type D (622E10160) | FT | 405 | $101.00 | $77.00 | $145.28 |
| 59 | Concrete barrier, single slope, type D, as per plan (622E10161) | FT | 377 | $250.00 | $77.00 | $222.84 |
| 60 | Concrete barrier end section, type D (622E25000) | EACH | 4 | $5,000.00 | $4,350.00 | $4,213.73 |
| 61 | Concrete barrier end section, type D, as per plan (622E25001) | EACH | 1 | $5,500.00 | $4,350.00 | $8,117.22 |
| 62 | Concrete barrier, end anchorage, reinforced, type D, as per plan (622E25051) | EACH | 5 | $5,000.00 | $4,400.00 | $4,727.73 |
| 63 | Monument assembly, type C (623E38500) | EACH | 32 | $1,450.00 | $1,500.00 | $875.00 |
| 64 | Reference monument, type A (623E40500) | EACH | 5 | $1,450.00 | $800.00 | $350.00 |
| 65 | Reference monument, type A, as per plan (623E40501) | EACH | 9 | $1,450.00 | $800.00 | $360.00 |
| 66 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,500.00 | $5,000.00 | $2,500.00 |
| 67 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,500.00 | $5,000.00 | $2,500.00 |
| 68 | Renovating existing soil, as per plan (654E10001) | MSF | 442 | $100.00 | $750.00 | $900.00 |
| 69 | Special - mailbox support system, single (690E50100) | EACH | 48 | $250.00 | $245.00 | $235.00 |
| 70 | Special - grass pavers (690E98300) | SY | 6,316 | $50.00 | $56.50 | $55.00 |
| 71 | Riprap (601E10000) | SY | 1.92 | $2,000.00 | $450.00 | $7,750.00 |
| 72 | Riprap, type D (601E11000) | SY | 29 | $150.00 | $300.00 | $135.00 |
| 73 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 10 | $85.00 | $62.95 | $160.00 |
| 74 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 235 | $85.00 | $63.00 | $80.00 |
| 75 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 22 | $140.00 | $220.00 | $240.00 |
| 76 | Rock channel protection, type B with aggregate filter (601E32110) | CY | 82 | $180.00 | $190.00 | $260.00 |
| 77 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 189 | $120.00 | $165.00 | $190.00 |
| 78 | Rock channel protection, type C with aggregate filter (601E32210) | CY | 4.50 | $150.00 | $700.00 | $600.00 |
| 79 | Bioretention cell (601E45050) | CY | 3,812 | $120.00 | $130.00 | $100.00 |
| 80 | Soil analysis test (659E00100) | EACH | 2 | $100.00 | $60.00 | $60.00 |
| 81 | Topsoil (659E00300) | CY | 9,417 | $65.00 | $35.00 | $25.00 |
| 82 | Seeding and mulching (659E10000) | SY | 88,576 | $2.00 | $0.67 | $0.67 |
| 83 | Repair seeding and mulching (659E14000) | SY | 4,242 | $1.20 | $0.67 | $0.67 |
| 84 | Inter-seeding (659E15000) | SY | 4,242 | $0.10 | $0.67 | $0.67 |
| 85 | Commercial fertilizer (659E20000) | TON | 11.83 | $750.00 | $799.39 | $800.07 |
| 86 | Lime (659E31000) | ACRE | 17.53 | $50.00 | $5.00 | $5.00 |
| 87 | Water (659E35000) | MGAL | 470 | $1.00 | $0.50 | $0.50 |
| 88 | Mowing (659E40000) | MSF | 191 | $5.00 | $5.00 | $5.00 |
| 89 | Erosion control mat (671E14000) | SY | 52,796 | $3.00 | $1.76 | $1.76 |
| 90 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,500.00 | $14,000 | $14,000 |
| 91 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $70,000 | $33,600 | $29,246 |
| 92 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $35,000 | $26,045 | $25,000 |
| 93 | Erosion control (832E30000) | EACH | 744,879 | $1.00 | $1.00 | $1.00 |
| 94 | Concrete masonry (602E20000) | CY | 40.19 | $150.00 | $2,550.00 | $3,200.00 |
| 95 | 4" unclassified pipe underdrains (605E05200) | FT | 500 | $12.00 | $18.80 | $30.00 |
| 96 | 4" unclassified pipe underdrains, as per plan (605E05201) | FT | 1,415 | $12.00 | $13.00 | $10.00 |
| 97 | 4" base pipe underdrains (605E06000) | FT | 65,517 | $12.00 | $15.00 | $10.50 |
| 98 | 4" conduit, type B (611E00100) | FT | 22 | $25.00 | $67.00 | $90.00 |
| 99 | 4" conduit, type C (611E00200) | FT | 129 | $15.00 | $65.00 | $9.00 |
| 100 | 4" conduit, type F (611E00406) | FT | 285 | $20.00 | $35.50 | $25.00 |
| 101 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 2,737 | $15.00 | $55.00 | $24.25 |
| 102 | 6" conduit, type B (611E00900) | FT | 98 | $15.00 | $55.00 | $80.00 |
| 103 | 6" conduit, type B (611E00900) | FT | 16 | $20.00 | $52.00 | $110.00 |
| 104 | 8" conduit, type B (611E01800) | FT | 10 | $17.00 | $225.00 | $140.00 |
| 105 | 12" conduit, type B (611E04400) | FT | 3,486 | $60.00 | $80.00 | $120.00 |
| 106 | 12" conduit, type B (611E04400) | FT | 17 | $60.00 | $145.00 | $225.00 |
| 107 | 12" conduit, type B, as per plan (611E04401) | FT | 25 | $200.00 | $172.00 | $300.00 |
| 108 | 12" conduit, type B, as per plan (611E04401) | FT | 687 | $150.00 | $87.00 | $140.00 |
| 109 | 12" conduit, type C (611E04600) | FT | 12 | $55.00 | $90.00 | $130.00 |
| 110 | 12" conduit, type D, as per plan (611E04901) | FT | 184 | $85.00 | $105.00 | $130.00 |
| 111 | 15" conduit, type A (611E05700) | FT | 86 | $75.00 | $130.00 | $130.00 |
| 112 | 15" conduit, type B (611E05900) | FT | 1,564 | $80.00 | $120.00 | $140.00 |
| 113 | 15" conduit, type B (611E05900) | FT | 10 | $400.00 | $235.00 | $450.00 |
| 114 | 15" conduit, type B, as per plan (611E05901) | FT | 52 | $150.00 | $200.00 | $350.00 |
| 115 | 15" conduit, type B, as per plan (611E05901) | FT | 581 | $250.00 | $136.00 | $180.00 |
| 116 | 15" conduit, type C (611E06100) | FT | 351 | $75.00 | $95.58 | $110.00 |
| 117 | 15" conduit, type D, as per plan (611E06401) | FT | 31 | $120.00 | $140.00 | $165.00 |
| 118 | 15" conduit, type F (611E06700) | FT | 51 | $110.00 | $235.00 | $220.00 |
| 119 | 18" conduit, type B (611E07400) | FT | 797 | $90.00 | $104.00 | $160.00 |
| 120 | 18" conduit, type B (611E07400) | FT | 5 | $250.00 | $530.00 | $570.00 |
| 121 | 18" conduit, type B, as per plan (611E07401) | FT | 254 | $280.00 | $147.00 | $200.00 |
| 122 | 18" conduit, type C (611E07600) | FT | 537 | $85.00 | $114.00 | $160.00 |
| 123 | 18" conduit, type D, as per plan, 706.02 (611E07901) | FT | 203 | $120.00 | $136.00 | $170.00 |
| 124 | 21" conduit, type C (611E09100) | FT | 100 | $110.00 | $137.00 | $160.00 |
| 125 | 24" conduit, type B (611E10400) | FT | 1,478 | $120.00 | $250.00 | $215.00 |
| 126 | 24" conduit, type F (611E11200) | FT | 33 | $150.00 | $340.00 | $315.00 |
| 127 | 30" conduit, type B (611E13400) | FT | 588 | $150.00 | $280.00 | $340.00 |
| 128 | 30" conduit, type C (611E13600) | FT | 24 | $140.00 | $223.00 | $220.00 |
| 129 | 36" conduit, type B (611E16400) | FT | 17 | $180.00 | $470.00 | $400.00 |
| 130 | 42" conduit, type B (611E19400) | FT | 78 | $220.00 | $350.00 | $325.00 |
| 131 | 60" conduit, type A, 707.21 or 707.22 (611E23600) | FT | 20 | $600.00 | $850.00 | $1,100.00 |
| 132 | 72" conduit, type A, 706.02, 707.85, or 707.04 (0. (611E26000) | FT | 108 | $650.00 | $760.00 | $1,000.00 |
| 133 | 29" X 45" conduit, type A, 706.04 (611E52700) | FT | 87 | $350.00 | $120.00 | $535.00 |
| 134 | 43" X 68" conduit, type C, 706.04 (611E53104) | FT | 525 | $585.00 | $500.00 | $650.00 |
| 135 | 8' X 6' conduit, type A, 706.05 (611E94910) | FT | 4 | $7,000.00 | $4,800.00 | $8,200.00 |
| 136 | 9' X 4' conduit, type A, 706.05 (611E94936) | FT | 23 | $2,500.00 | $2,100.00 | $2,275.00 |
| 137 | Catch basin, no. 3 (611E98150) | EACH | 19 | $3,100.00 | $4,500.00 | $6,000.00 |
| 138 | Catch basin, no. 3A (611E98180) | EACH | 35 | $2,500.00 | $3,500.00 | $4,500.00 |
| 139 | Catch basin, no. 4A, as per plan (611E98271) | EACH | 2 | $15,500 | $12,300 | $12,200 |
| 140 | Catch basin, no. 5 (611E98300) | EACH | 9 | $5,800.00 | $8,800.00 | $9,000.00 |
| 141 | Catch basin, no. 6 (611E98370) | EACH | 5 | $2,350.00 | $4,350.00 | $4,500.00 |
| 142 | Catch basin, no. 2-2B (611E98470) | EACH | 24 | $2,500.00 | $2,500.00 | $3,200.00 |
| 143 | Catch basin, no. 2-3 (611E98510) | EACH | 4 | $3,850.00 | $3,500.00 | $5,500.00 |
| 144 | Catch basin adjusted to grade (611E98630) | EACH | 6 | $1,420.00 | $560.00 | $725.00 |
| 145 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 5 | $1,650.00 | $1,900.00 | $975.00 |
| 146 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 1 | $2,000.00 | $2,400.00 | $1,900.00 |
| 147 | Inlet, side ditch (611E98700) | EACH | 1 | $5,800.00 | $1,200.00 | $3,500.00 |
| 148 | Inlet, no. 3D (611E98820) | EACH | 1 | $7,000.00 | $11,500 | $13,000 |
| 149 | Manhole, no. 3 (611E99574) | EACH | 9 | $7,200.00 | $5,550.00 | $7,500.00 |
| 150 | Manhole adjusted to grade (611E99654) | EACH | 25 | $1,450.00 | $630.00 | $1,250.00 |
| 151 | Precast reinforced concrete outlet (611E99710) | EACH | 45 | $200.00 | $450.00 | $620.00 |
| 152 | Junction chamber, as per plan (611E99731) | EACH | 1 | $45,000 | $61,000 | $100,000 |
| 153 | Special - miscellaneous metal (611E99820) | LB | 1,000 | $8.50 | $3.00 | $3.50 |
| 154 | Pavement planing, asphalt concrete (depth varies 0 (254E01000) | SY | 14,597 | $8.00 | $9.75 | $8.80 |
| 155 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 11,983 | $175.00 | $200.69 | $244.00 |
| 156 | Aggregate base (304E20000) | CY | 19,930 | $65.00 | $85.00 | $77.50 |
| 157 | Non-tracking tack coat (407E20000) | GAL | 13,509 | $3.00 | $2.81 | $3.00 |
| 158 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 297 | $420.00 | $415.00 | $590.00 |
| 159 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 362 | $360.00 | $355.00 | $485.00 |
| 160 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 3,165 | $270.00 | $265.00 | $405.00 |
| 161 | Asphalt concrete intermediate course, 12.5 MM, type A (448), as per plan (442E20171) | CY | 3,684 | $220.00 | $255.96 | $339.00 |
| 162 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 1,099 | $265.00 | $260.00 | $370.00 |
| 163 | Asphalt concrete intermediate course, 19 MM, type A (449), as per plan (442E22401) | CY | 1,831 | $235.00 | $230.00 | $330.00 |
| 164 | 8" reinforced concrete pavement, class QC 1P, as per plan (451E13011) | SY | 1,918 | $100.00 | $107.00 | $125.00 |
| 165 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 160 | $60.00 | $55.00 | $72.00 |
| 166 | 6" non-reinforced concrete pavement, class QC 1P, as per plan (452E10011) | SY | 3,287 | $70.00 | $67.00 | $71.00 |
| 167 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 557 | $70.00 | $69.00 | $78.00 |
| 168 | Combination curb and gutter, type 2 (609E12000) | FT | 10,906 | $25.00 | $22.75 | $22.75 |
| 169 | Curb, type 3-B, as per plan (609E22001) | FT | 1,736 | $20.00 | $15.00 | $18.75 |
| 170 | Curb, type 4-A (609E24000) | FT | 1,245 | $10.00 | $15.00 | $17.00 |
| 171 | Curb, type 6 (609E26000) | FT | 8,360 | $20.00 | $15.00 | $19.00 |
| 172 | Curb, type 6, as per plan (609E26001) | FT | 93 | $20.00 | $35.25 | $45.00 |
| 173 | Curb, type 7 (609E28000) | FT | 303 | $20.00 | $27.25 | $35.00 |
| 174 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 4.79 | $900.00 | $875.00 | $875.00 |
| 175 | Rumble stripes, edge line (concrete) (618E42000) | MI | 0.04 | $900.00 | $875.00 | $875.00 |
| 176 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 3.42 | $900.00 | $875.00 | $875.00 |
| 177 | Rumble stripes, center line (concrete) (618E44000) | MI | 0.02 | $900.00 | $875.00 | $875.00 |
| 178 | Longitudinal joint preparation (874E21000) | MI | 1.03 | $15,000 | $15,000 | $24,000 |
| 179 | 6" water main polyvinyl chloride pipe and fittings, AWWA C900, DR18 (638E01130) | FT | 237 | $90.00 | $400.00 | $575.00 |
| 180 | 8" water main polyvinyl chloride pipe and fittings, AWWA C900, DR18 (638E01720) | FT | 406 | $120.00 | $450.00 | $750.00 |
| 181 | 8" water main polyvinyl chloride pipe and fittings, AWWA C900, DR18, as per plan (638E01721) | FT | 22 | $135.00 | $97.00 | $1,650.00 |
| 183 | 12" steel pipe encasement, open cut (638E06500) | FT | 90 | $300.00 | $220.00 | $400.00 |
| 184 | 8" cutting-in sleeve (638E08706) | EACH | 38 | $4,200.00 | $2,000.00 | $3,425.00 |
| 185 | 8" X 6" tapping sleeve, valve and valve box (638E09390) | EACH | 6 | $9,000.00 | $7,800.00 | $32,500 |
| 187 | Fire hydrant extended and adjusted to grade (638E10300) | EACH | 6 | $3,250.00 | $3,500.00 | $1,250.00 |
| 188 | Fire hydrant adjusted to grade (638E10400) | EACH | 11 | $4,850.00 | $3,350.00 | $1,650.00 |
| 189 | Fire hydrant removed (638E10480) | EACH | 15 | $1,200.00 | $600.00 | $1,200.00 |
| 190 | Valve box adjusted to grade (638E10800) | EACH | 17 | $500.00 | $300.00 | $800.00 |
| 191 | Meter and chamber removed and reset (638E11100) | EACH | 21 | $1,500.00 | $3,000.00 | $3,000.00 |
| 192 | Meter, setting, stop and chamber (638E11200) | EACH | 5 | $3,500.00 | $14,000 | $12,000 |
| 193 | Special - 6" gate valve with valve boxresilient WE (638E20538) | EACH | 16 | $3,200.00 | $2,800.00 | $4,400.00 |
| 194 | Special - 8" gate valve with valve boxresilient WE (638E20554) | EACH | 23 | $4,300.00 | $3,600.00 | $5,700.00 |
| 195 | Special - 6" fire hydrantamerican avk 2780 or muel (638E20750) | EACH | 11 | $9,500.00 | $6,500.00 | $11,500 |
| 196 | Special - retap, reconnect and extend 1" polyethylene water service connection (638E20826) | FT | 161 | $50.00 | $100.00 | $180.00 |
| 197 | Water work, misc.: AWWA standard testing (638E98100) | LS | 1 | $35,000 | $25,000 | $8,500.00 |
| 198 | Water work, misc.:16? water main concrete encaseme (638E98600) | FT | 10 | $1,500.00 | $300.00 | $3,500.00 |
| 199 | Manhole adjusted to grade (611E99654) | EACH | 36 | $1,450.00 | $1,400.00 | $1,200.00 |
| 200 | Connection, fused pull apart (625E00450) | EACH | 176 | $155.00 | $153.75 | $240.00 |
| 201 | Connection, unfused permanent (625E00480) | EACH | 135 | $155.00 | $142.25 | $190.00 |
| 202 | Light pole, conventional, 30' (625E10490) | EACH | 88 | $4,500.00 | $3,915.90 | $3,900.00 |
| 203 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 88 | $2,400.00 | $2,413.75 | $2,250.00 |
| 204 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 37,725 | $6.00 | $5.70 | $4.00 |
| 205 | No. 10 AWG pole and bracket cable (625E23400) | FT | 12,144 | $3.00 | $2.72 | $2.25 |
| 206 | Conduit, 3", 725.04 (625E25500) | FT | 10,413 | $31.00 | $32.59 | $40.00 |
| 207 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 1,665 | $75.00 | $62.85 | $70.00 |
| 208 | Luminaire, conventional, solid state (LED), type I (625E26252) | EACH | 88 | $550.00 | $547.50 | $575.00 |
| 209 | Trench (625E29000) | FT | 10,413 | $22.00 | $12.34 | $8.00 |
| 210 | Pull box, 725.08, 18" (625E30700) | EACH | 17 | $1,300.00 | $1,093.50 | $1,900.00 |
| 211 | Pull box, 725.08, 24" (625E30706) | EACH | 28 | $1,600.00 | $1,289.00 | $2,500.00 |
| 212 | Pull box removed (625E31510) | EACH | 1 | $500.00 | $597.50 | $285.00 |
| 213 | Ground rod (625E32000) | EACH | 90 | $400.00 | $278.75 | $340.00 |
| 214 | Power service, as per plan (625E34001) | EACH | 8 | $25,000 | $7,512.50 | $10,500 |
| 215 | Underground warning marking tape (625E36010) | FT | 10,413 | $4.00 | $2.08 | $0.55 |
| 216 | Light pole removed (625E75400) | EACH | 7 | $1,300.00 | $597.50 | $1,025.00 |
| 217 | Light pole foundation removed (625E75500) | EACH | 7 | $600.00 | $925.00 | $580.00 |
| 218 | Luminaire removed (625E75506) | EACH | 8 | $300.00 | $146.50 | $145.00 |
| 219 | Distribution cable removed (625E75550) | FT | 2,861 | $3.00 | $2.18 | $1.50 |
| 220 | Delineator, misc.: high intensity retro-reflective (620E70000) | EACH | 14 | $250.00 | $250.00 | $425.00 |
| 221 | RPM (621E00100) | EACH | 605 | $65.00 | $32.50 | $44.00 |
| 222 | Raised pavement marker removed (621E54000) | EACH | 318 | $55.00 | $6.00 | $40.00 |
| 223 | Barrier reflector, type 1 (one-way) (626E00102) | EACH | 8 | $14.00 | $13.70 | $13.70 |
| 224 | Barrier reflector, type 2 (one-way) (626E00110) | EACH | 48 | $15.00 | $15.00 | $15.00 |
| 225 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 3,612 | $16.00 | $16.00 | $16.00 |
| 226 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 36 | $55.00 | $55.00 | $55.00 |
| 227 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 80 | $65.00 | $65.00 | $65.00 |
| 228 | Sign post reflector (630E08600) | EACH | 95 | $45.00 | $45.00 | $45.00 |
| 229 | Breakaway structural beam connection (630E09000) | EACH | 2 | $680.00 | $680.00 | $680.00 |
| 230 | Overhead sign support, type TC-16.22, design 9 (630E72530) | EACH | 1 | $22,000 | $19,280 | $19,280 |
| 231 | Overhead sign support, type TC-16.22, design 13, as per plan (630E72551) | EACH | 1 | $30,000 | $27,340 | $27,340 |
| 232 | Sign support assembly, pole mounted (630E79500) | EACH | 11 | $300.00 | $295.00 | $295.00 |
| 233 | Sign, flat sheet (630E80100) | SF | 1,940 | $20.00 | $19.70 | $19.70 |
| 234 | Sign, ground mounted extrusheet (630E80200) | SF | 40 | $30.00 | $29.00 | $29.00 |
| 235 | Covering of sign (630E83000) | SF | 176 | $40.00 | $40.00 | $40.00 |
| 236 | Ground mounted structural beam support foundation (630E84500) | EACH | 2 | $1,000.00 | $980.00 | $980.00 |
| 237 | Rigid overhead sign support foundation (630E84510) | EACH | 3 | $10,000 | $9,680.00 | $9,680.00 |
| 238 | Removal of ground mounted sign and disposal (630E84900) | EACH | 228 | $20.00 | $15.00 | $15.00 |
| 239 | Removal of ground mounted sign and reerection (630E85100) | EACH | 23 | $70.00 | $65.00 | $65.00 |
| 240 | Removal of ground mounted post support and disposal (630E86002) | EACH | 166 | $25.00 | $20.00 | $20.00 |
| 241 | Removal of ground mounted structural beam support (630E86102) | EACH | 10 | $345.00 | $345.00 | $345.00 |
| 242 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 4 | $220.00 | $220.00 | $220.00 |
| 243 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 2 | $2,200.00 | $2,120.00 | $2,120.00 |
| 244 | Signing, misc.: 12" PVC pipe (630E97700) | EACH | 23 | $35.00 | $30.00 | $30.00 |
| 245 | Signing, misc.: solar-powered rectangular rapid FL (630E97700) | EACH | 8 | $10,000 | $10,000 | $17,000 |
| 246 | Edge line, 6", type 1 (642E00104) | MI | 9.85 | $1,200.00 | $1,200.00 | $867.00 |
| 247 | Center line, type 1 (642E00300) | MI | 6.75 | $1,200.00 | $1,200.00 | $990.00 |
| 248 | Channelizing line, 12", type 1 (642E00404) | FT | 3,659 | $1.00 | $1.00 | $1.50 |
| 249 | Dotted line, 12", type 1 (642E01560) | FT | 2,074 | $1.00 | $1.00 | $1.40 |
| 250 | Pavement marking, misc.: crosswalk line, 18" (642E50020) | FT | 624 | $4.00 | $4.00 | $6.20 |
| 251 | Stop line (644E00500) | FT | 146 | $10.00 | $10.00 | $6.75 |
| 252 | Crosswalk line, 12" (644E00620) | FT | 468 | $4.00 | $4.00 | $6.25 |
| 253 | Transverse/diagonal line (644E00700) | FT | 1,992 | $10.00 | $10.00 | $6.50 |
| 254 | Chevron marking (644E00720) | FT | 639 | $10.00 | $10.00 | $6.50 |
| 255 | Railroad symbol marking (644E01000) | EACH | 2 | $600.00 | $600.00 | $475.00 |
| 256 | Lane arrow (644E01300) | EACH | 80 | $125.00 | $125.00 | $150.00 |
| 257 | Lane reduction arrow (644E01350) | EACH | 2 | $250.00 | $250.00 | $400.00 |
| 258 | Wrong way arrow (644E01360) | EACH | 3 | $200.00 | $200.00 | $350.00 |
| 259 | Two way left turn arrow (644E01370) | EACH | 1 | $250.00 | $250.00 | $300.00 |
| 260 | Word on pavement, 48" (644E01382) | EACH | 4 | $325.00 | $325.00 | $175.00 |
| 261 | Word on pavement, 96" (644E01410) | EACH | 2 | $450.00 | $450.00 | $175.00 |
| 262 | Dotted line, 12" (644E01520) | FT | 932 | $2.00 | $2.00 | $3.25 |
| 263 | Shared lane marking (644E19000) | EACH | 1 | $300.00 | $300.00 | $680.00 |
| 264 | Yield line (644E20800) | FT | 574 | $10.00 | $10.00 | $22.40 |
| 265 | Edge line, 6" (646E10010) | MI | 4.82 | $5,000.00 | $5,000.00 | $4,195.00 |
| 266 | Center line (646E10200) | MI | 0.05 | $15,000 | $15,000 | $5,595.00 |
| 267 | Transverse/diagonal line (646E10600) | FT | 2,477 | $16.00 | $16.00 | $10.65 |
| 268 | Pedestal foundation (632E64020) | EACH | 8 | $2,500.00 | $1,500.00 | $2,400.00 |
| 269 | Removal of traffic signal installation (632E90100) | EACH | 3 | $7,000.00 | $7,917.50 | $13,000 |
| 270 | Special - item special - stone mulch, as per plan (690E98700) | CY | 900 | $160.00 | $63.00 | $150.00 |
| 271 | Building demolished, parcel 41-000028.000, 1-story (202E56100) | EACH | 1 | $1,200.00 | $4,500.00 | $8,500.00 |
| 272 | Traffic compacted surface, type A or B (410E12000) | CY | 500 | $300.00 | $175.00 | $130.00 |
| 273 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 800 | $150.00 | $92.00 | $120.00 |
| 274 | Special - work zone traffic signal (614E11300) | EACH | 3 | $65,000 | $49,805 | $30,000 |
| 275 | Increased barrier delineation (614E11630) | FT | 696 | $4.00 | $4.00 | $0.70 |
| 276 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 38 | $2,500.00 | $2,200.00 | $2,400.00 |
| 277 | Detour signing (614E12420) | LS | 1 | $40,000 | $35,000 | $115,000 |
| 278 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 497 | $65.00 | $55.00 | $48.00 |
| 279 | Asphalt concrete for maintaining traffic (614E13000) | CY | 340 | $300.00 | $240.00 | $550.00 |
| 280 | Barrier reflector, type 1 (one way) (614E13310) | EACH | 28 | $10.00 | $10.00 | $6.50 |
| 281 | Object marker, one way (614E13350) | EACH | 112 | $20.00 | $20.00 | $18.00 |
| 282 | Maintaining traffic, misc.: temporary lighting (by (614E18000) | EACH | 5 | $25,000 | $5,775.00 | $2,850.00 |
| 283 | Portable changeable message sign, as per plan (614E18601) | SNMT | 288 | $1,000.00 | $900.00 | $600.00 |
| 284 | Work zone lane line, class I, 6" (614E20010) | MI | 1 | $550.00 | $550.00 | $255.00 |
| 285 | Work zone center line, class I (614E21000) | MI | 7 | $1,200.00 | $1,200.00 | $965.00 |
| 286 | Work zone edge line, class I, 6" (614E22010) | MI | 22 | $1,200.00 | $1,200.00 | $745.00 |
| 287 | Work zone channelizing line, class I, 12" (614E23010) | FT | 2,224 | $2.00 | $2.00 | $0.85 |
| 288 | Work zone dotted line, class I (614E24000) | FT | 6,128 | $2.00 | $2.00 | $0.80 |
| 289 | Work zone transverse/diagonal line, class I (614E25000) | FT | 3,618 | $3.00 | $3.00 | $3.65 |
| 290 | Work zone stop line, class I (614E26000) | FT | 519 | $3.00 | $3.00 | $4.60 |
| 291 | Work zone arrow, class I (614E30000) | EACH | 86 | $50.00 | $50.00 | $120.00 |
| 292 | Business entrance sign (614E40050) | EACH | 10 | $200.00 | $200.00 | $400.00 |
| 293 | Roads for maintaining traffic (615E10000) | LS | 1 | $120,000 | $100,000 | $125,000 |
| 294 | Pavement for maintaining traffic, class A (615E20000) | SY | 17,669 | $80.00 | $76.95 | $70.00 |
| 295 | Water (616E10000) | MGAL | 657 | $1.00 | $15.00 | $85.00 |
| 296 | Portable barrier, unanchored (622E41100) | FT | 8,979 | $15.00 | $20.00 | $14.75 |
| 297 | Railroad flagging services (900E00100) | EACH | 75,000 | $1.00 | $1.00 | $1.00 |
| 298 | Structure removed (202E11000) | LS | 1 | $12,500 | $5,830.95 | $4,200.00 |
| 299 | Granular embankment (203E35000) | CY | 81.50 | $85.00 | $112.86 | $75.00 |
| 300 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $6,500.00 | $31,804 | $25,000 |
| 301 | Unclassified excavation (503E21300) | LS | 1 | $8,500.00 | $14,557 | $12,500 |
| 302 | Epoxy coated steel reinforcement (509E10000) | LB | 5,818 | $2.50 | $2.17 | $2.25 |
| 303 | Class QC1 concrete, retaining/wingwall not including footing (511E46000) | SY | 41 | $900.00 | $1,010.32 | $900.00 |
| 304 | Class QC1 concrete, footing (511E46510) | CY | 45.10 | $850.00 | $1,118.78 | $650.00 |
| 305 | Class QC1 concrete, headwall (511E46610) | CY | 1 | $2,500.00 | $2,571.55 | $1,900.00 |
| 306 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 89 | $40.00 | $43.03 | $115.00 |
| 307 | Type 2 waterproofing (512E33000) | SY | 73 | $60.00 | $30.82 | $25.00 |
| 308 | 1" preformed expansion joint filler (516E13600) | SF | 50 | $20.00 | $6.67 | $15.00 |
| 309 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $6,000.00 | $4,545.36 | $3,800.00 |
| 310 | Prefabricated modular retaining wall (870E10000) | SF | 435 | $76.00 | $74.66 | $80.00 |
| 311 | Wall excavation (870E11000) | CY | 220 | $25.00 | $36.59 | $45.00 |
| 312 | Natural soil (870E11100) | CY | 25 | $60.00 | $57.42 | $30.00 |
| 313 | 6" drainage pipe, perforated (870E12000) | FT | 105 | $15.00 | $14.67 | $50.00 |
| 314 | 6" drainage pipe, non-perforated (870E12100) | FT | 10 | $15.00 | $40.83 | $20.00 |
| 315 | On-site assistance (870E14000) | DAY | 2 | $1,200.00 | $1,000.00 | $100.00 |
| 316 | PMRW inspection and compaction testing (870E15000) | LS | 1 | $2,500.00 | $2,000.00 | $3,200.00 |
| 317 | Wearing course removed, as per plan (202E23501) | SY | 478 | $35.00 | $22.75 | $25.00 |
| 318 | Tack coat (407E10000) | GAL | 540 | $3.00 | $2.55 | $3.00 |
| 319 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 14 | $270.00 | $265.00 | $405.00 |
| 320 | Asphalt concrete intermediate course, 12.5 MM, type A (446), as per plan (442E10081) | CY | 18 | $230.00 | $235.00 | $340.00 |
| 321 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 5 | $265.00 | $260.00 | $370.00 |
| 322 | Asphalt concrete intermediate course, 19 MM, type A (449), as per plan (442E22401) | CY | 9 | $235.00 | $230.00 | $330.00 |
| 323 | Epoxy coated steel reinforcement (509E10000) | LB | 400 | $5.00 | $2.47 | $2.25 |
| 324 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 1,218 | $2.00 | $1.94 | $1.60 |
| 325 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 32 | $150.00 | $31.41 | $30.00 |
| 326 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 84 | $40.00 | $40.04 | $120.00 |
| 327 | Type 3 waterproofing, as per plan (512E33011) | SY | 135 | $50.00 | $49.01 | $50.00 |
| 328 | 1" preformed expansion joint filler (516E13600) | SF | 19 | $20.00 | $7.50 | $20.00 |
| 329 | Joint sealer (516E31000) | FT | 62 | $45.00 | $18.46 | $15.00 |
| 330 | Deep beam bridge retrofit railing (517E75600) | FT | 68 | $145.00 | $134.00 | $134.00 |
| 331 | Deep beam bridge retrofit railing, as per plan (517E75601) | FT | 68 | $155.00 | $147.00 | $147.00 |
| 332 | Special - steel drip strip (518E22300) | FT | 62 | $20.00 | $25.26 | $30.00 |
| 333 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 57 | $125.00 | $131.00 | $132.53 |
| 334 | Barrier, misc.: modified concrete barrier, single (622E90000) | FT | 94 | $250.00 | $190.89 | $250.00 |
| 335 | Polymer modified asphalt expansion joint system, as per plan (846E00111) | CF | 43 | $700.00 | $662.23 | $569.29 |
| 336 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $25,000 | $11,512 | $8,000.00 |
| 337 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $120,000 | $92,707 | $80,000 |
| 338 | Unclassified excavation, including rock and/or shale (503E22200) | CY | 251 | $120.00 | $101.51 | $110.00 |
| 339 | Epoxy coated steel reinforcement (509E10000) | LB | 7,679 | $2.50 | $2.12 | $2.20 |
| 340 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 124 | $120.00 | $27.02 | $40.00 |
| 341 | Class QC1 concrete, abutment including footing (511E43510) | CY | 69 | $900.00 | $1,189.82 | $1,200.00 |
| 342 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 34 | $40.00 | $44.73 | $300.00 |
| 343 | Type 2 waterproofing (512E33000) | SY | 16 | $60.00 | $38.71 | $30.00 |
| 344 | Structural steel, misc.: prefabricated truss bridg (513E95020) | LS | 1 | $150,000 | $125,014 | $140,000 |
| 345 | Structural expansion joint including elastomeric compression seal, as per plan (516E10501) | FT | 22 | $600.00 | $866.28 | $850.00 |
| 346 | Railing, timber, as per plan (517E74001) | FT | 22 | $175.00 | $168.50 | $120.00 |
| 347 | Prefabricated geocomposite drain (518E20000) | SY | 43 | $50.00 | $36.79 | $40.00 |
| 348 | Porous backfill with geotextile fabric (518E21200) | CY | 2 | $80.00 | $511.19 | $240.00 |
| 349 | 6" perforated corrugated plastic pipe (518E40000) | FT | 37 | $15.00 | $13.88 | $17.50 |
| 350 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 39 | $15.00 | $20.94 | $25.00 |
| 351 | Rock channel protection, type C without filter (601E34200) | CY | 35 | $125.00 | $127.47 | $120.00 |
| 352 | Epoxy coated steel reinforcement (509E10000) | LB | 1,624 | $2.50 | $2.21 | $2.25 |
| 353 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 4,594 | $2.00 | $1.87 | $1.70 |
| 354 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 117 | $120.00 | $28.64 | $35.00 |
| 355 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 313 | $40.00 | $25.04 | $50.00 |
| 356 | 1/2" preformed expansion joint filler (516E13200) | SF | 10 | $20.00 | $13.03 | $17.00 |
| 357 | 1" preformed expansion joint filler (516E13600) | SF | 10 | $20.00 | $14.24 | $20.00 |
| 358 | Vandal protection fence, 6' straight, coated fabric, as per plan (607E39901) | FT | 591 | $85.00 | $87.80 | $78.80 |
| 359 | Special - vandal protection fence (607E40000) | FT | 591 | $15.00 | $11.00 | $11.00 |
| 360 | Barrier, misc.: modified concrete barrier, single (622E90000) | FT | 347 | $250.00 | $181.71 | $170.00 |
| 361 | Ground rod (625E32000) | EACH | 2 | $400.00 | $278.75 | $350.00 |
| 362 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $35,000 | $5,000.00 | $5,000.00 |
| 363 | Department'S share of the dispute resolution advisor (100E51200) | EACH | 50,000 | $1.00 | $1.00 | $1.00 |
| 364 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $160,000 | $125,000 | $194,000 |
| 365 | CPM progress schedule (108E10000) | LS | 1 | $45,000 | $5,000.00 | $5,000.00 |
| 366 | Special - departments share facilitated partnering costs (111E10100) | EACH | 12,250 | $1.00 | $1.00 | $1.00 |
| 367 | Maintaining traffic (614E11000) | LS | 1 | $550,000 | $1,830,000 | $1,000,000 |
| 368 | Field office, type C (619E16020) | MNTH | 36 | $6,500.00 | $2,800.00 | $1,500.00 |
| 369 | Construction layout stakes and surveying (623E10000) | LS | 1 | $350,000 | $200,000 | $330,000 |
| 370 | Mobilization (624E10000) | LS | 1 | $2,345,274 | $1,656,000 | $1,670,000 |
| 400 | Maintaining traffic, misc.:meter base, non fused S (614E18002) | LS | 1 | $4,000.00 | $4,917.50 | $1,450.00 |
| 401 | Special - maintain existing lighting (625E40000) | LS | 1 | $50,000 | $8,275.00 | $13,500 |
| 402 | 8" water main polyvinyl chloride pipe and fittings, AWWA C900, DR18, as per plan (638E01721) | FT | 60 | $950.00 | $1,300.00 | $2,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.