GRE-US 35-00.08 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION). Let by Ohio DOT on May 8, 2025, GRE. 2 bids received; low bid $6,591,961 by John R Jurgensen Company, -5.9% against the engineer's estimate of $7,002,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 137
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $6,591,961 | Low | -6.0% |
| 2 | Barrett Paving Materials Inc | $7,660,322 | +16% | +9.0% |
Engineer's estimate: $7,002,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Barrett Paving Materials Inc |
|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 19,933 | $8.87 | $14.25 |
| 2 | Concrete barrier removed (202E30700) | FT | 258 | $53.12 | $50.00 |
| 3 | Guardrail removed (202E38000) | FT | 437.50 | $4.00 | $4.00 |
| 4 | Bridge terminal assembly removed (202E47000) | EACH | 1 | $125.00 | $125.00 |
| 5 | Proof rolling (204E45000) | HR | 10 | $212.58 | $425.00 |
| 6 | Cement (206E10500) | TON | 602 | $235.33 | $189.00 |
| 7 | Curing coat (206E11000) | SY | 19,933 | $1.34 | $1.20 |
| 8 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 19,933 | $5.79 | $5.55 |
| 9 | Rock channel protection, type C with filter, as per plan (601E32201) | CY | 1.40 | $1,377.17 | $935.00 |
| 10 | Guardrail, type MGS (606E15050) | FT | 437.50 | $22.25 | $22.25 |
| 11 | Bridge terminal assembly, type 2 (606E35100) | EACH | 1 | $325.00 | $325.00 |
| 12 | Barrier, misc.:concrete barrier, type A (622E90000) | FT | 238 | $139.23 | $190.00 |
| 13 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 3.60 | $505.02 | $435.00 |
| 14 | Seeding and mulching (659E10000) | SY | 56 | $12.00 | $12.00 |
| 15 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 |
| 16 | Concrete masonry (602E20000) | CY | 0.27 | $5,888.63 | $5,145.00 |
| 17 | 4" conduit, type F (611E00406) | FT | 40 | $69.75 | $55.00 |
| 18 | 15" conduit, type B (611E05900) | FT | 50 | $253.73 | $245.00 |
| 19 | Inlet, no. 3C, as per plan (611E98811) | EACH | 1 | $24,882 | $40,000 |
| 20 | Precast reinforced concrete outlet, as per plan (611E99711) | EACH | 2 | $598.57 | $550.00 |
| 21 | Pavement repair, as per plan (253E02001) | CY | 500 | $609.59 | $475.00 |
| 22 | Pavement planing, asphalt concrete, 1.5" depth (254E01000) | SY | 151,175 | $1.48 | $2.00 |
| 23 | Patching planed surface (254E01600) | SY | 1,377 | $3.91 | $11.00 |
| 24 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 4,817 | $158.19 | $205.00 |
| 25 | Aggregate base (304E20000) | CY | 3,284 | $66.70 | $115.00 |
| 26 | Non-tracking tack coat (407E20000) | GAL | 27,750 | $4.50 | $3.75 |
| 27 | Anti-segregation equipment (442E00100) | CY | 4,034 | $7.50 | $20.00 |
| 28 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 1,456 | $202.13 | $278.00 |
| 29 | Asphalt concrete surface course, 12.5 MM, type A (447) (442E10300) | CY | 7,107 | $241.03 | $265.00 |
| 30 | Compacted aggregate (617E10100) | CY | 262 | $220.27 | $215.00 |
| 31 | Shoulder preparation (617E20000) | SY | 6,281 | $2.07 | $2.75 |
| 32 | Water (617E25000) | MGAL | 5.20 | $100.05 | $150.00 |
| 33 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 13.05 | $1,050.00 | $1,475.00 |
| 34 | RPM (621E00100) | EACH | 420 | $35.00 | $35.00 |
| 35 | Raised pavement marker removed (621E54000) | EACH | 420 | $10.84 | $12.00 |
| 36 | Sign, temporary overlay (630E80300) | SF | 45 | $120.00 | $32.68 |
| 37 | Detector loop (632E26500) | EACH | 6 | $1,415.00 | $1,415.00 |
| 38 | Loop detector tie in (632E27200) | EACH | 6 | $155.00 | $155.00 |
| 39 | Stop line (644E00500) | FT | 115 | $5.50 | $5.50 |
| 40 | Crosswalk line, 12" (644E00620) | FT | 392 | $5.00 | $5.00 |
| 41 | Transverse/diagonal line (644E00700) | FT | 1,110 | $5.25 | $5.25 |
| 42 | Chevron marking (644E00720) | FT | 472 | $5.25 | $5.25 |
| 43 | Lane arrow (644E01300) | EACH | 17 | $185.00 | $185.00 |
| 44 | Wrong way arrow (644E01360) | EACH | 7 | $360.00 | $360.00 |
| 45 | Edge line, 6", type A4 (645E00118) | MI | 0.85 | $31,475 | $31,475 |
| 46 | Lane line, 6", type A4 (645E00220) | MI | 0.37 | $10,895 | $10,895 |
| 47 | Channelizing line, 12", type A4 (645E00418) | FT | 740 | $11.05 | $11.05 |
| 48 | Wet reflective thermoplastic pavement marking, edge line, 6" (807E14010) | MI | 14.82 | $5,600.00 | $5,600.00 |
| 49 | Wet reflective thermoplastic pavement marking, lane line, 6" (807E14110) | MI | 5.96 | $2,025.00 | $2,025.00 |
| 50 | Wet reflective thermoplastic pavement marking, channelizing line, 12" (807E14310) | FT | 6,334 | $2.50 | $2.50 |
| 51 | Wet reflective thermoplastic pavement marking, dotted line, 6" (807E14410) | FT | 1,864 | $0.90 | $0.90 |
| 52 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 20.78 | $1,500.00 | $1,500.00 |
| 53 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 6,036 | $1.50 | $1.50 |
| 54 | Asphalt concrete intermediate course, 19 MM, type A (449) (442E22400) | CY | 2.20 | $920.98 | $2,000.00 |
| 55 | Reset bearing, as per plan (516E46701) | EACH | 14 | $5,845.00 | $3,895.35 |
| 56 | Patching concrete bridge deck - type B (519E12300) | SY | 0.40 | $3,500.00 | $1,504.50 |
| 57 | Correcting elevation of concrete approach slabs with high density polyurethane (842E10000) | LB | 270 | $25.93 | $8.75 |
| 58 | Concrete patching with galvanic anode protection (844E10000) | SF | 129 | $113.82 | $250.30 |
| 59 | Reset bearing, as per plan (516E46701) | EACH | 7 | $5,845.00 | $4,689.00 |
| 60 | Patching concrete bridge deck - type B (519E12300) | SY | 5.40 | $1,500.00 | $1,053.00 |
| 61 | Concrete patching with galvanic anode protection (844E10000) | SF | 113 | $113.85 | $250.30 |
| 62 | Reset bearing, as per plan (516E46701) | EACH | 9 | $5,845.00 | $4,369.00 |
| 63 | Patching concrete bridge deck - type B (519E12300) | SY | 6 | $1,500.00 | $1,053.00 |
| 64 | Concrete patching with galvanic anode protection (844E10000) | SF | 39 | $113.80 | $250.30 |
| 65 | Patching concrete bridge deck - type B (519E12300) | SY | 2.70 | $1,800.00 | $1,504.50 |
| 66 | Patching concrete bridge deck - type B (519E12300) | SY | 4 | $1,450.00 | $1,117.50 |
| 67 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 477 | $20.00 | $14.95 |
| 68 | Removal of existing pavement marking (512E74500) | FT | 141 | $34.50 | $3.40 |
| 69 | Patching concrete structure (519E11100) | SF | 10 | $225.00 | $172.00 |
| 70 | Patching concrete bridge deck - type B (519E12300) | SY | 15 | $1,000.00 | $1,053.00 |
| 71 | Patching concrete bridge deck - type B (519E12300) | SY | 16.60 | $1,000.00 | $1,053.00 |
| 72 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 500 | $106.89 | $97.00 |
| 73 | Increased barrier delineation (614E11630) | FT | 264 | $3.01 | $3.05 |
| 74 | Work zone impact attenuator, over 24" and less than 36" wide hazards, (unidirectional) (614E12390) | EACH | 7 | $1,836.59 | $1,840.00 |
| 75 | Detour signing (614E12420) | LS | 1 | $9,721.45 | $10,000 |
| 76 | Work zone increased penalties sign (614E12484) | EACH | 4 | $249.72 | $250.00 |
| 78 | Work zone raised pavement marker (614E12800) | EACH | 250 | $24.96 | $8.00 |
| 79 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $185.40 | $840.00 |
| 80 | Barrier reflector, type 1, one-way (614E13310) | EACH | 397 | $11.76 | $11.80 |
| 81 | Maintaining traffic, misc.: rumble strip milled/FI (614E18030) | FT | 29,120 | $2.13 | $4.00 |
| 82 | Portable changeable message sign, as per plan (614E18601) | SNMT | 10 | $889.10 | $890.00 |
| 83 | Work zone lane line, class I, 6" (614E20010) | MI | 0.05 | $625.00 | $625.00 |
| 84 | Work zone edge line, class I, 6" (614E22010) | MI | 26.06 | $1,835.00 | $1,835.00 |
| 85 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.13 | $9,244.85 | $9,244.85 |
| 86 | Work zone channelizing line, class I, 12" (614E23010) | FT | 5,070 | $1.05 | $1.05 |
| 87 | Work zone channelizing line, class I, 12", 740.06, type I (614E23410) | FT | 1,657 | $2.43 | $2.43 |
| 88 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 3,249 | $1.00 | $1.00 |
| 89 | Pavement for maintaining traffic, class A (615E20000) | SY | 53 | $154.59 | $275.00 |
| 90 | Water (616E10000) | MGAL | 40 | $110.28 | $50.00 |
| 92 | Portable barrier, unanchored (622E41100) | FT | 17,598 | $15.33 | $15.35 |
| 93 | Portable barrier, anchored (622E41110) | FT | 1,994 | $21.69 | $21.70 |
| 94 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 12 | $674.69 | $675.00 |
| 95 | Seeding and mulching (659E10000) | SY | 1,082 | $4.00 | $4.00 |
| 96 | Commercial fertilizer (659E20000) | TON | 0.15 | $800.00 | $800.00 |
| 97 | Lime (659E31000) | ACRE | 0.22 | $50.00 | $50.00 |
| 98 | Water (659E35000) | MGAL | 5.80 | $10.00 | $10.00 |
| 99 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 100 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $106.89 | $97.00 |
| 101 | Portable changeable message sign, as per plan (614E18601) | SNMT | 3 | $889.10 | $890.00 |
| 102 | Ground rod (625E32000) | EACH | 1 | $260.00 | $260.00 |
| 103 | Overhead sign support, type TC-16.22, design 14 (630E72560) | EACH | 1 | $25,650 | $25,650 |
| 104 | Sign hanger assembly, mast arm (630E79100) | EACH | 3 | $450.00 | $450.00 |
| 105 | Sign, flat sheet (630E80100) | SF | 22.50 | $35.00 | $35.00 |
| 106 | Rigid overhead sign support foundation (630E84510) | EACH | 1 | $8,500.00 | $8,500.00 |
| 107 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 3 | $100.00 | $300.00 |
| 108 | Removal of overhead sign support and disposal (630E89702) | EACH | 1 | $1,200.00 | $1,200.00 |
| 109 | Channelizing line, 12" (644E00404) | FT | 95 | $2.00 | $2.00 |
| 110 | Chevron marking (644E00720) | FT | 120 | $5.25 | $5.25 |
| 111 | Removal of pavement marking (644E30000) | FT | 15 | $34.50 | $34.50 |
| 112 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $32.24 | $8.15 |
| 113 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 10 | $320.37 | $31.50 |
| 114 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 323 | $35.00 | $39.00 |
| 115 | Concrete repair by epoxy injection, as per plan (512E10601) | FT | 1,205 | $65.06 | $57.00 |
| 116 | Special - urethane top coat sealer (512E71500) | SY | 214 | $28.00 | $45.25 |
| 117 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 213 | $38.00 | $21.10 |
| 118 | Special - composite fiber wrap system (519E00100) | SF | 1,924 | $30.00 | $56.20 |
| 119 | Patching concrete structure, as per plan (519E11101) | SF | 190 | $165.00 | $172.00 |
| 120 | Lighting, misc.: spot repair of conduit in parapet (625E98200) | LS | 1 | $6,640.00 | $3,006.00 |
| 121 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $32.24 | $8.15 |
| 122 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 10 | $320.37 | $31.50 |
| 123 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 98 | $35.00 | $39.00 |
| 124 | Concrete repair by epoxy injection, as per plan (512E10601) | FT | 534 | $65.06 | $57.00 |
| 125 | Special - urethane top coat sealer (512E71500) | SY | 166 | $28.00 | $42.00 |
| 126 | Special - composite fiber wrap system (519E00100) | SF | 1,493 | $30.00 | $56.80 |
| 127 | Patching concrete structure, as per plan (519E11101) | SF | 41 | $200.00 | $172.00 |
| 128 | Concrete coping, as per plan (840E26001) | FT | 4 | $3,237.23 | $1,785.00 |
| 129 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $45,061 | $33,441 |
| 130 | Maintaining traffic (614E11000) | LS | 1 | $192,384 | $495,000 |
| 131 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $13,022 | $20,000 |
| 132 | Mobilization (624E10000) | LS | 1 | $300,000 | $150,000 |
| 200 | Clearing and grubbing (201E11000) | LS | 1 | $8,286.09 | $2,000.00 |
| 201 | Excavation of subgrade (204E13000) | CY | 5,676 | $29.87 | $32.00 |
| 202 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 13 | $702.42 | $275.00 |
| 203 | Work zone impact attenuator, misc.:' 48" wide atte (614E12400) | EACH | 3 | $8,234.03 | $8,235.00 |
| 204 | Work zone pavement marking, misc.:' 24? white chev (614E98100) | FT | 317 | $4.15 | $4.15 |
| 205 | Portable non-intrusive traffic sensor, class I (896E00010) | SNMT | 12 | $1,269.57 | $1,270.00 |
| 206 | Portable changeable message sign (896E00020) | SNMT | 12 | $889.10 | $890.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.