ODOT contract 250250 bid tabulation
HAM-CR 96-05.25 Springdale Road (SIDEWALK). Let by Ohio DOT on May 8, 2025, HAM. 2 bids received; low bid $1,051,156 by Prus Construction Company, +14% against the engineer's estimate of $926,000.
- Owner
- Ohio DOT
- Letting
- 08 MAY 2025
- Pay items
- 85
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Prus Construction Company | $1,051,156 | Low | +14% |
| 2 | Sunesis Construction Co | $1,279,020 | +22% | +38% |
Engineer's estimate: $926,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Prus Construction Company | 2. Sunesis Construction Co |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,500.00 | $4,105.00 |
| 2 | Pavement removed (202E23000) | SY | 1,086 | $33.00 | $12.30 |
| 3 | Pavement removed (202E23000) | SY | 178 | $32.00 | $18.75 |
| 4 | Walk removed (202E30000) | SF | 1,368 | $4.50 | $1.80 |
| 5 | Curb removed (202E32000) | FT | 1,548 | $13.00 | $10.65 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 277 | $65.00 | $23.00 |
| 7 | Catch basin removed (202E58100) | EACH | 16 | $985.00 | $550.00 |
| 8 | Excavation (203E10000) | CY | 893 | $38.00 | $67.75 |
| 9 | Embankment (203E20000) | CY | 32 | $80.00 | $53.50 |
| 10 | 5" concrete walk (608E12000) | SF | 9,216 | $10.00 | $10.40 |
| 11 | Curb ramp (608E52000) | SF | 2,327 | $17.00 | $25.65 |
| 12 | Monument assembly, type C (623E38500) | EACH | 1 | $1,650.00 | $1,475.00 |
| 13 | Pull box, misc.:, traffic pull box adjusted to gra (625E31600) | EACH | 1 | $550.00 | $500.00 |
| 14 | Topsoil furnished and placed (653E10000) | CY | 10 | $115.00 | $89.00 |
| 15 | Special - mailbox and support system, single (690E98000) | EACH | 11 | $850.00 | $140.00 |
| 16 | Special -consultant for concrete quality control I (690E98400) | LS | 1 | $23,000 | $9,870.00 |
| 17 | Topsoil (659E00300) | CY | 293 | $71.50 | $81.00 |
| 18 | Seeding and mulching, class 1 (659E00500) | SY | 2,640 | $2.40 | $13.00 |
| 19 | Repair seeding and mulching (659E14000) | SY | 132 | $2.40 | $2.10 |
| 20 | Inter-seeding (659E15000) | SY | 132 | $2.40 | $2.10 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.36 | $850.00 | $760.00 |
| 22 | Lime (659E31000) | ACRE | 0.55 | $55.00 | $50.00 |
| 23 | Water (659E35000) | MGAL | 14.60 | $55.00 | $50.00 |
| 24 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 |
| 25 | 8" conduit, type B (611E01800) | FT | 5 | $350.00 | $179.50 |
| 26 | 10" conduit, type B (611E03100) | FT | 5 | $350.00 | $264.00 |
| 27 | 12" conduit, type B (611E04400) | FT | 112 | $165.00 | $134.00 |
| 28 | 12" conduit, type B (611E04400) | FT | 105 | $220.00 | $291.00 |
| 29 | 12" conduit, type C (611E04600) | FT | 82 | $225.00 | $301.00 |
| 30 | 18" conduit, type B (611E07400) | FT | 5 | $560.00 | $630.00 |
| 31 | 24" conduit, type B (611E10400) | FT | 5 | $1,925.00 | $883.00 |
| 32 | 24" conduit, type C (611E10600) | FT | 10 | $475.00 | $263.00 |
| 33 | Catch basin, no. 2-2B (611E98470) | EACH | 15 | $3,800.00 | $2,140.00 |
| 34 | Manhole, no. 3 (611E99574) | EACH | 1 | $11,000 | $7,235.00 |
| 35 | Manhole adjusted to grade (611E99654) | EACH | 1 | $850.00 | $717.00 |
| 36 | Manhole reconstructed to grade (611E99660) | EACH | 4 | $3,350.00 | $2,035.00 |
| 37 | Pavement repair, as per plan (253E02001) | CY | 146 | $300.00 | $835.00 |
| 38 | Aggregate base (304E20000) | CY | 79 | $145.00 | $141.50 |
| 39 | Non-tracking tack coat (407E20000) | GAL | 22 | $12.00 | $27.00 |
| 40 | Stabilized crushed aggregate (411E10000) | CY | 185 | $115.00 | $172.00 |
| 41 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 13 | $800.00 | $1,776.00 |
| 42 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 27 | $650.00 | $1,014.00 |
| 43 | 7" non-reinforced concrete pavement, class QC 1P (452E11010) | SY | 216 | $115.00 | $103.65 |
| 44 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 714 | $120.00 | $108.00 |
| 45 | Curb, type 6 (609E26000) | FT | 1,239 | $45.00 | $36.75 |
| 46 | Water work, misc.: curb box (per GCWW plan) (638E98000) | EACH | 5 | $300.00 | $847.00 |
| 47 | Water work, misc.: resetting existing 2" frost-pro (638E98000) | EACH | 2 | $1,400.00 | $1,285.00 |
| 48 | Water work, misc.:roadway box (per GCWW plan) (638E98000) | EACH | 3 | $1,050.00 | $920.00 |
| 49 | Ground mounted support, no. 3 post (630E03100) | FT | 93 | $18.00 | $15.50 |
| 50 | Sign support assembly, pole mounted (630E79500) | EACH | 5 | $61.00 | $55.00 |
| 51 | Sign, flat sheet (630E80100) | SF | 31 | $18.00 | $16.00 |
| 52 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $22.00 | $20.00 |
| 53 | Removal of ground mounted sign and reerection (630E85100) | EACH | 7 | $50.00 | $45.00 |
| 54 | Removal of ground mounted post support and disposal (630E86002) | EACH | 7 | $28.00 | $25.00 |
| 55 | Stop line, type 1 (642E00500) | FT | 216 | $5.50 | $5.00 |
| 56 | Crosswalk line, 12", type 1 (642E00620) | FT | 895 | $2.75 | $2.50 |
| 57 | Lane arrow, type 1 (642E01300) | EACH | 8 | $136.00 | $123.00 |
| 58 | 4" conduit, type E (611E00400) | FT | 20 | $1.65 | $1.50 |
| 59 | Conduit, 2", 725.051 (625E25408) | FT | 117 | $7.00 | $6.30 |
| 60 | Conduit, 3", 725.051 (625E25504) | FT | 8 | $10.30 | $9.35 |
| 61 | Conduit, 4", 725.051 (625E25604) | FT | 22 | $13.50 | $12.20 |
| 62 | Trench (625E29000) | FT | 147 | $17.00 | $15.35 |
| 63 | Pull box, 725.08, 18" (625E30700) | EACH | 1 | $1,310.00 | $1,190.00 |
| 64 | Ground rod (625E32000) | EACH | 12 | $540.00 | $485.00 |
| 65 | Underground warning marking tape (625E36010) | FT | 147 | $2.00 | $1.75 |
| 66 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 22 | $825.00 | $750.00 |
| 67 | Accessible pedestrian pushbutton, as per plan (632E20751) | EACH | 22 | $965.00 | $875.00 |
| 68 | Covering of pedestrian signal head (632E25010) | EACH | 22 | $83.00 | $75.00 |
| 69 | Signal cable, 3 conductor, no. 14 AWG (632E40300) | FT | 3,316 | $2.30 | $2.05 |
| 70 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 3,348 | $2.60 | $2.35 |
| 71 | Pedestal foundation (632E64020) | EACH | 9 | $1,925.00 | $1,750.00 |
| 72 | Conduit riser, 2" diameter (632E70400) | EACH | 5 | $1,450.00 | $1,320.00 |
| 73 | Conduit riser, 2" diameter, as per plan (632E70401) | EACH | 1 | $3,110.00 | $2,825.00 |
| 74 | Conduit riser, 3" diameter (632E70600) | EACH | 1 | $2,450.00 | $2,210.00 |
| 75 | Pedestal, 8', transformer base (632E89900) | EACH | 9 | $1,170.00 | $1,060.00 |
| 76 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 3 | $1,815.00 | $1,650.00 |
| 77 | Signalization, misc.: conduit riser, 4" diameter ( (632E90400) | EACH | 1 | $3,610.00 | $3,280.00 |
| 78 | Signalization, misc.: conduit riser, 4" diameter ( (632E90400) | EACH | 1 | $3,610.00 | $3,280.00 |
| 79 | Signalization, misc.: unlash and relash messenger (632E90500) | FT | 562 | $34.50 | $57.00 |
| 80 | Controller item, misc.: rewire/reprogram controlle (633E99000) | EACH | 3 | $2,200.00 | $2,000.00 |
| 81 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $132.00 | $75.00 |
| 82 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,000 | $7,526.00 |
| 83 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $146,155 |
| 84 | Construction layout stakes and surveying (623E10000) | LS | 1 | $20,000 | $17,150 |
| 85 | Mobilization (624E10000) | LS | 1 | $30,000 | $92,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 8, 2025. Compiled by Mirage Metrics.