ODOT contract 250093 bid tabulation
LIC-CR 134-02.06 (MINOR RECONSTRUCTION). Let by Ohio DOT on February 27, 2025, LIC. 10 bids received; low bid $2,445,730 by Miller Bros Const Inc, -12% against the engineer's estimate of $2,789,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 100
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Miller Bros Const Inc | $2,445,730 | Low | -12% |
| 2 | Strawser Paving Co Inc | $2,558,903 | +5.0% | -8.0% |
| 3 | Shelly Company | $2,569,506 | +5.0% | -8.0% |
| 4 | Shelly & Sands Inc | $2,652,154 | +8.0% | -5.0% |
| 5 | Law General Contracting Inc | $2,665,252 | +9.0% | -4.0% |
| 6 | Trucco Construction Co Inc | $2,790,364 | +14% | 0.0% |
| 7 | Danbert Incorporated | $2,908,205 | +19% | +4.0% |
| 8 | Double Z Construction Company | $2,963,911 | +21% | +6.0% |
| 9 | Eclipse Co LLC | $3,047,925 | +25% | +9.0% |
| 10 | Complete General Construction Company | $3,114,629 | +27% | +12% |
Engineer's estimate: $2,789,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Bros Const Inc | 2. Strawser Paving Co Inc | 3. Shelly Company | 4. Shelly & Sands Inc | 5. Law General Contracting Inc | 6. Trucco Construction Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,000 | $2,000.00 | $13,000 | $22,000 | $2,600.00 | $19,200 |
| 2 | Tree removed, 18" diameter (201E21800) | EACH | 16 | $1,200.00 | $500.00 | $425.00 | $1,200.00 | $785.00 | $300.00 |
| 3 | Stump removed, 18", as per plan (201E26501) | EACH | 2 | $250.00 | $375.00 | $675.00 | $250.00 | $524.00 | $1,180.00 |
| 4 | Pavement removed (202E23000) | SY | 6,276 | $11.00 | $14.00 | $16.25 | $10.95 | $5.50 | $7.60 |
| 5 | Pavement removed (202E23000) | SY | 571 | $10.00 | $27.00 | $16.35 | $18.00 | $21.00 | $23.00 |
| 6 | Curb and gutter removed (202E32500) | FT | 22 | $10.00 | $50.00 | $22.50 | $12.00 | $16.00 | $43.00 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 534 | $17.70 | $6.00 | $34.00 | $10.00 | $27.00 | $28.00 |
| 8 | Guardrail removed (202E38000) | FT | 703 | $1.80 | $2.80 | $2.80 | $2.80 | $2.00 | $2.80 |
| 9 | Catch basin removed (202E58100) | EACH | 1 | $800.00 | $600.00 | $560.00 | $150.00 | $297.00 | $690.00 |
| 10 | Fence removed (202E75000) | FT | 158 | $4.00 | $5.00 | $3.50 | $3.50 | $3.50 | $10.90 |
| 11 | Excavation (203E10000) | CY | 2,069 | $30.00 | $23.50 | $40.00 | $28.00 | $39.50 | $65.00 |
| 12 | Embankment (203E20000) | CY | 1,034 | $7.50 | $9.50 | $28.75 | $16.00 | $21.00 | $9.40 |
| 13 | Subgrade compaction (204E10000) | SY | 571 | $4.50 | $2.00 | $5.00 | $12.00 | $3.00 | $7.80 |
| 14 | Excavation of subgrade (204E13000) | CY | 110 | $25.50 | $25.00 | $56.50 | $45.00 | $36.00 | $47.00 |
| 15 | Granular material, type B (204E30010) | CY | 110 | $88.00 | $25.00 | $76.50 | $75.00 | $84.00 | $87.00 |
| 16 | Proof rolling (204E45000) | HR | 8 | $140.00 | $100.00 | $245.00 | $250.00 | $156.00 | $350.00 |
| 17 | Geotextile fabric (204E50000) | SY | 310 | $2.80 | $2.50 | $3.20 | $1.50 | $1.50 | $4.00 |
| 18 | Cement (206E10500) | TON | 240 | $222.00 | $221.49 | $221.49 | $225.00 | $255.00 | $221.00 |
| 19 | Curing coat (206E11000) | SY | 8,295 | $1.30 | $1.27 | $1.27 | $1.30 | $1.40 | $1.30 |
| 20 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 8,295 | $4.50 | $4.47 | $4.47 | $4.50 | $6.00 | $7.00 |
| 21 | Guardrail, type MGS (606E15050) | FT | 879 | $20.40 | $22.00 | $22.00 | $22.00 | $24.00 | $22.00 |
| 22 | Anchor assembly, type E (606E26100) | EACH | 8 | $2,485.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,892.00 | $2,500.00 |
| 23 | Anchor assembly, type T (606E26500) | EACH | 4 | $1,340.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,560.00 | $1,000.00 |
| 24 | Combination curb and gutter, type 2 (609E12000) | FT | 22 | $127.40 | $60.00 | $110.00 | $68.00 | $146.00 | $108.00 |
| 25 | Low strength mortar backfill (613E41200) | CY | 25 | $205.00 | $250.00 | $225.00 | $185.00 | $177.00 | $213.00 |
| 26 | Special - mailbox removed and reset (690E50350) | EACH | 7 | $194.00 | $400.00 | $210.00 | $450.00 | $146.00 | $750.00 |
| 27 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $125.00 | $125.00 | $125.00 | $582.00 | $125.00 |
| 28 | Topsoil (659E00300) | CY | 750 | $8.50 | $45.00 | $45.00 | $50.00 | $60.00 | $64.00 |
| 29 | Seeding and mulching, class 1 (659E00500) | SY | 6,751 | $1.00 | $0.77 | $0.77 | $0.80 | $1.50 | $0.80 |
| 30 | Repair seeding and mulching (659E14000) | SY | 338 | $1.00 | $0.80 | $0.80 | $0.80 | $1.50 | $0.80 |
| 31 | Inter-seeding (659E15000) | SY | 338 | $1.00 | $0.80 | $0.80 | $0.80 | $2.50 | $0.80 |
| 32 | Commercial fertilizer (659E20000) | TON | 0.61 | $1,250.00 | $891.38 | $891.38 | $895.00 | $1,400.00 | $890.00 |
| 33 | Lime (659E31000) | ACRE | 1.39 | $150.00 | $155.50 | $155.50 | $160.00 | $175.00 | $156.00 |
| 34 | Water (659E35000) | MGAL | 36 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | Slope erosion protection (670E00500) | SY | 2,300 | $2.50 | $1.26 | $1.26 | $1.30 | $3.00 | $1.30 |
| 36 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,500.00 | $1,975.00 | $1,975.00 | $3,200.00 | $8,728.00 | $1,980.00 |
| 37 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,360.00 | $2,040.00 | $1,770.00 | $8,000.00 | $31,421 | $8,200.00 |
| 38 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $2,500.00 | $8,000.00 | $8,000.00 | $14,750 | $2,100.00 | $19,600 |
| 39 | Erosion control (832E30000) | EACH | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Rock channel protection, type B with filter (601E32100) | CY | 2.80 | $250.00 | $700.00 | $675.00 | $450.00 | $302.00 | $243.00 |
| 41 | Concrete masonry (602E20000) | CY | 0.86 | $1,200.00 | $3,500.00 | $2,400.00 | $3,000.00 | $3,689.00 | $4,870.00 |
| 42 | 4" base pipe underdrains (605E06000) | FT | 4,514 | $5.50 | $8.00 | $14.50 | $13.50 | $12.00 | $11.50 |
| 43 | 4" conduit, type E (611E00400) | FT | 100 | $35.00 | $10.00 | $16.50 | $10.00 | $11.50 | $31.00 |
| 44 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 269 | $28.00 | $10.00 | $36.00 | $20.00 | $28.00 | $60.00 |
| 45 | 12" conduit, type B (611E04400) | FT | 5 | $300.00 | $100.00 | $182.00 | $375.00 | $136.00 | $371.00 |
| 46 | 18" conduit, type B (611E07400) | FT | 72 | $95.00 | $110.00 | $85.50 | $120.00 | $132.00 | $126.00 |
| 47 | 24" conduit, type B (611E10400) | FT | 383 | $140.00 | $120.00 | $100.50 | $160.00 | $128.00 | $170.00 |
| 48 | Catch basin, no. 2-3 (611E98510) | EACH | 11 | $2,500.00 | $2,700.00 | $3,375.00 | $3,300.00 | $4,800.00 | $3,640.00 |
| 49 | Manhole, no. 3 (611E99574) | EACH | 1 | $2,700.00 | $3,000.00 | $2,970.00 | $4,200.00 | $3,400.00 | $4,220.00 |
| 50 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $200.00 | $700.00 | $325.00 | $250.00 | $238.00 | $2,000.00 |
| 51 | Pavement planing, asphalt concrete 3" (254E01000) | SY | 395 | $31.75 | $25.00 | $23.00 | $31.75 | $15.50 | $30.00 |
| 52 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,996 | $174.75 | $165.00 | $174.75 | $175.00 | $210.00 | $167.00 |
| 53 | Aggregate base (304E20000) | CY | 41 | $90.00 | $165.00 | $124.00 | $160.00 | $113.00 | $173.00 |
| 54 | Aggregate base (304E20000) | CY | 1,860 | $75.00 | $70.00 | $69.25 | $88.00 | $78.00 | $90.00 |
| 55 | Non-tracking tack coat (407E20000) | GAL | 1,001 | $3.90 | $3.00 | $3.90 | $3.90 | $5.50 | $3.00 |
| 56 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 285 | $217.75 | $220.00 | $217.75 | $217.75 | $261.00 | $223.00 |
| 57 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 399 | $200.75 | $210.00 | $200.75 | $200.75 | $250.00 | $215.00 |
| 58 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 14 | $555.00 | $800.00 | $555.00 | $555.00 | $503.00 | $800.00 |
| 59 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 189 | $132.00 | $85.00 | $94.00 | $100.00 | $87.00 | $96.00 |
| 60 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 68 | $148.00 | $115.00 | $227.00 | $135.00 | $135.00 | $101.00 |
| 61 | Compacted aggregate (617E10100) | CY | 305 | $90.00 | $50.00 | $118.00 | $105.00 | $76.00 | $123.00 |
| 62 | 8" water main polyvinyl chloride pipe and fittings, AWWA C900, DR14 (638E01710) | FT | 125 | $123.00 | $280.00 | $123.00 | $200.00 | $211.00 | $387.00 |
| 63 | 12" water main polyvinyl chloride pipe and fittings, AWWA C900, DR-14 (638E02750) | FT | 2,070 | $133.00 | $178.00 | $133.00 | $185.00 | $121.00 | $187.00 |
| 64 | 8" gate valve and valve box (638E07900) | EACH | 4 | $4,000.00 | $3,200.00 | $4,000.00 | $2,800.00 | $3,925.00 | $3,610.00 |
| 65 | 12" gate valve and valve box (638E08100) | EACH | 7 | $6,700.00 | $5,000.00 | $6,700.00 | $4,200.00 | $5,800.00 | $6,900.00 |
| 66 | 6" fire hydrant, as per plan (638E10201) | EACH | 5 | $9,700.00 | $12,500 | $9,700.00 | $8,650.00 | $8,200.00 | $11,100 |
| 67 | Fire hydrant removed (638E10480) | EACH | 4 | $1,000.00 | $500.00 | $1,000.00 | $400.00 | $360.00 | $3,650.00 |
| 68 | Special - cut and plug existing 8" water line, hea (638E20880) | EACH | 4 | $3,000.00 | $1,200.00 | $3,000.00 | $985.00 | $765.00 | $1,970.00 |
| 69 | Water work, misc.:8" cap and plug (638E98000) | EACH | 1 | $4,000.00 | $1,200.00 | $4,000.00 | $1,600.00 | $530.00 | $1,960.00 |
| 70 | Water work, misc.:12" water main HDPE directional (638E98600) | FT | 150 | $500.00 | $250.00 | $500.00 | $185.00 | $290.00 | $304.00 |
| 71 | Ground mounted support, no. 3 post (630E03100) | FT | 119.50 | $18.00 | $19.88 | $25.00 | $19.90 | $14.00 | $19.90 |
| 72 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 37.50 | $30.50 | $21.74 | $30.00 | $21.50 | $22.00 | $22.00 |
| 73 | Sign, flat sheet (630E80100) | SF | 61.38 | $25.00 | $23.19 | $25.00 | $23.20 | $29.00 | $23.00 |
| 74 | Sign, flat sheet, as per plan (630E80101) | SF | 33.50 | $34.50 | $26.04 | $35.00 | $26.05 | $37.00 | $26.00 |
| 75 | Removal of ground mounted sign and disposal (630E84900) | EACH | 16 | $10.00 | $16.10 | $30.00 | $16.10 | $47.00 | $16.10 |
| 76 | Removal of ground mounted post support and disposal (630E86002) | EACH | 14 | $20.00 | $21.47 | $30.00 | $21.50 | $70.00 | $21.00 |
| 77 | Edge line, 6" (644E00104) | MI | 0.99 | $6,240.00 | $3,601.00 | $5,350.00 | $3,601.00 | $6,230.00 | $5,400.00 |
| 78 | Center line (644E00300) | MI | 0.49 | $8,320.00 | $5,700.00 | $9,000.00 | $5,700.00 | $10,500 | $9,000.00 |
| 79 | Stop line (644E00500) | FT | 53 | $9.50 | $13.00 | $11.50 | $13.00 | $13.50 | $11.50 |
| 80 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $90.00 | $70.00 | $80.00 | $100.00 | $64.00 | $130.00 |
| 81 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 14 | $2,280.00 | $2,400.00 | $2,400.00 | $2,200.00 | $2,560.00 | $2,200.00 |
| 82 | Detour signing (614E12420) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $10,500 | $13,180 | $17,600 |
| 83 | Work zone sign support (614E12440) | EACH | 35 | $50.00 | $50.00 | $50.00 | $50.00 | $110.00 | $385.00 |
| 84 | Work zone marking sign (614E12460) | EACH | 35 | $100.00 | $100.00 | $100.00 | $100.00 | $110.00 | $140.00 |
| 85 | Barrier reflector, type 1, 1 way (614E13310) | EACH | 86 | $28.00 | $15.00 | $15.00 | $15.00 | $29.00 | $15.00 |
| 86 | Object marker, one way (614E13350) | EACH | 86 | $32.00 | $18.00 | $18.00 | $16.00 | $35.00 | $25.00 |
| 87 | Portable changeable message sign, as per plan (614E18601) | SNMT | 24 | $1,500.00 | $1,500.00 | $1,500.00 | $950.00 | $990.00 | $730.00 |
| 88 | Work zone edge line, class I, 6" (614E22010) | MI | 1.89 | $1,800.00 | $1,800.00 | $1,490.00 | $1,800.00 | $1,650.00 | $6,300.00 |
| 89 | Roads for maintaining traffic (615E10000) | LS | 1 | $35,000 | $23,000 | $15,000 | $34,000 | $5,250.00 | $40,300 |
| 90 | Pavement for maintaining traffic, class A (615E20000) | SY | 1,340 | $64.00 | $100.00 | $75.00 | $65.00 | $94.00 | $80.00 |
| 91 | Water (616E10000) | MGAL | 8 | $75.00 | $100.00 | $1.00 | $30.00 | $350.00 | $87.00 |
| 92 | Portable barrier, unanchored (622E41100) | FT | 3,946 | $18.00 | $28.15 | $28.15 | $18.00 | $37.00 | $17.40 |
| 93 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $18,000 | $20,400 | $12,500 | $16,500 | $29,000 | $17,500 |
| 94 | Maintaining traffic (614E11000) | LS | 1 | $52,200 | $75,000 | $43,500 | $65,000 | $23,000 | $9,800.00 |
| 95 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,400 | $10,000 | $35,000 | $27,000 | $32,000 | $9,900.00 |
| 96 | Mobilization, as per plan (624E10001) | LS | 1 | $122,000 | $100,000 | $86,000 | $130,000 | $136,600 | $100,000 |
| 97 | Special - record construction drawings (690E98400) | LS | 1 | $100.00 | $2,000.00 | $2,000.00 | $4,200.00 | $2,800.00 | $7,700.00 |
| 100 | 12" conduit, type C (611E04600) | FT | 250 | $60.00 | $100.00 | $59.25 | $79.00 | $49.00 | $80.00 |
| 101 | 18" conduit, type C (611E07600) | FT | 450 | $74.00 | $110.00 | $83.50 | $104.00 | $64.00 | $92.00 |
| 102 | 24" conduit, type C (611E10600) | FT | 737 | $95.00 | $120.00 | $107.00 | $135.00 | $76.00 | $122.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.