ODOT contract 250124 bid tabulation
LIC-CR 804-00.96 (Church St) (MINOR RECONSTRUCTION). Let by Ohio DOT on February 27, 2025, LIC. 10 bids received; low bid $2,135,073 by Miller Bros Const Inc, -11% against the engineer's estimate of $2,400,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 91
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Miller Bros Const Inc | $2,135,073 | Low | -11% |
| 2 | Law General Contracting Inc | $2,185,999 | +2.0% | -9.0% |
| 3 | Trucco Construction Co Inc | $2,387,947 | +12% | -1.0% |
| 4 | Axis Civil Construction LLC | $2,584,500 | +21% | +8.0% |
| 5 | Eclipse Co LLC | $2,670,034 | +25% | +11% |
| 6 | Boss Excavating & Grading Inc | $2,686,425 | +26% | +12% |
| 7 | Shelly & Sands Inc | $2,714,151 | +27% | +13% |
| 8 | Danbert Incorporated | $2,772,514 | +30% | +16% |
| 9 | Double Z Construction Company | $2,873,018 | +35% | +20% |
| 10 | Complete General Construction Company | $2,970,946 | +39% | +24% |
Engineer's estimate: $2,400,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Bros Const Inc | 2. Law General Contracting Inc | 3. Trucco Construction Co Inc | 4. Axis Civil Construction LLC | 5. Eclipse Co LLC | 6. Boss Excavating & Grading Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $18,000 | $7,144.00 | $2,500.00 | $10,000 | $5,000.00 | $6,880.00 |
| 2 | Pavement removed (202E23000) | SY | 7,305 | $6.50 | $7.00 | $6.14 | $12.50 | $10.00 | $14.00 |
| 3 | Walk removed (202E30000) | SF | 10,544 | $1.00 | $1.25 | $1.60 | $2.00 | $1.00 | $8.00 |
| 4 | Curb removed (202E32000) | FT | 302 | $4.50 | $9.00 | $3.84 | $6.00 | $12.00 | $10.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 579 | $80.00 | $41.00 | $46.93 | $20.00 | $22.00 | $14.00 |
| 6 | Guardrail removed (202E38000) | FT | 53 | $14.50 | $39.00 | $15.00 | $8.00 | $10.00 | $3.00 |
| 7 | Manhole removed (202E58000) | EACH | 1 | $1,000.00 | $825.00 | $678.44 | $1,500.00 | $436.00 | $312.00 |
| 8 | Catch basin removed (202E58100) | EACH | 6 | $750.00 | $425.00 | $644.57 | $700.00 | $436.00 | $829.00 |
| 9 | Fence removed (202E75000) | FT | 24 | $10.00 | $13.70 | $10.00 | $12.00 | $20.00 | $27.00 |
| 10 | Gate removed (202E75250) | EACH | 1 | $250.00 | $82.00 | $1,500.00 | $290.00 | $250.00 | $662.00 |
| 11 | Excavation (203E10000) | CY | 4,520 | $26.70 | $32.00 | $25.00 | $35.00 | $47.00 | $35.00 |
| 12 | Embankment (203E20000) | CY | 357 | $26.70 | $16.00 | $17.04 | $35.00 | $25.00 | $15.00 |
| 13 | Subgrade compaction (204E10000) | SY | 8,665 | $1.00 | $0.80 | $2.29 | $2.00 | $1.00 | $2.00 |
| 14 | Excavation of subgrade (204E13000) | CY | 2,463 | $22.50 | $31.00 | $21.21 | $35.00 | $48.00 | $42.00 |
| 15 | Embankment (204E20000) | CY | 198 | $19.00 | $21.50 | $18.18 | $35.00 | $50.00 | $22.00 |
| 16 | Granular material, type B (204E30010) | CY | 2,265 | $66.00 | $54.00 | $72.19 | $72.00 | $106.00 | $52.00 |
| 17 | Proof rolling (204E45000) | HR | 8 | $135.00 | $157.00 | $313.20 | $225.00 | $304.00 | $616.00 |
| 18 | Geotextile fabric (204E50000) | SY | 1,493 | $1.85 | $1.75 | $1.94 | $1.80 | $1.00 | $4.00 |
| 19 | Geogrid (204E51000) | SY | 1,254 | $2.85 | $3.00 | $1.73 | $3.50 | $2.00 | $5.00 |
| 20 | Gate, type CLT (607E61200) | EACH | 1 | $6,850.00 | $3,000.00 | $6,850.00 | $6,850.00 | $4,500.00 | $3,360.00 |
| 21 | 4" concrete walk (608E10000) | SF | 14,751 | $9.60 | $7.50 | $11.99 | $9.00 | $8.00 | $10.00 |
| 22 | Curb ramp (608E52000) | SF | 703 | $23.50 | $24.00 | $25.97 | $18.00 | $14.00 | $20.00 |
| 23 | Detectable warning (608E53020) | SF | 120 | $25.00 | $59.00 | $32.43 | $24.00 | $25.00 | $50.00 |
| 24 | Right-of-way monument, type B (623E40520) | EACH | 44 | $125.00 | $144.00 | $126.51 | $95.00 | $627.00 | $164.00 |
| 25 | Special - bollard (690E50600) | EACH | 9 | $575.00 | $691.00 | $575.00 | $575.00 | $1,500.00 | $2,700.00 |
| 26 | Topsoil furnished and placed (653E10000) | CY | 727 | $85.00 | $55.00 | $66.39 | $50.00 | $80.00 | $81.00 |
| 27 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $147.00 | $125.00 | $150.00 | $125.00 | $202.00 |
| 28 | Seeding and mulching, class 1 (659E00500) | SY | 6,551 | $1.00 | $1.30 | $1.10 | $1.00 | $1.00 | $3.00 |
| 29 | Repair seeding and mulching (659E14000) | SY | 328 | $1.00 | $1.00 | $0.80 | $1.00 | $1.00 | $7.00 |
| 30 | Commercial fertilizer (659E20000) | TON | 0.88 | $1,250.00 | $1,055.00 | $898.22 | $1,250.00 | $898.00 | $2,688.00 |
| 31 | Lime (659E31000) | ACRE | 1.35 | $150.00 | $182.00 | $155.50 | $150.00 | $156.00 | $672.00 |
| 32 | Water (659E35000) | MGAL | 35 | $1.00 | $1.20 | $1.00 | $1.00 | $1.00 | $20.00 |
| 33 | Storm water pollution prevention plan (832E15000) | LS | 1 | $2,500.00 | $5,286.00 | $2,000.00 | $2,500.00 | $2,450.00 | $3,182.00 |
| 34 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,350.00 | $11,747 | $4,800.00 | $8,100.00 | $4,080.00 | $3,200.00 |
| 35 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $1,800.00 | $2,114.00 | $1,736.00 | $2,000.00 | $1,736.00 | $2,333.00 |
| 36 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 37 | 4" base pipe underdrains (605E06000) | FT | 3,409 | $10.00 | $9.00 | $7.77 | $14.00 | $25.00 | $15.00 |
| 38 | 4" base pipe underdrains, as per plan (605E06001) | FT | 56 | $25.00 | $9.50 | $7.75 | $10.00 | $28.00 | $20.00 |
| 39 | 12" conduit, type B (611E04400) | FT | 1,079 | $70.00 | $93.00 | $155.00 | $145.00 | $119.00 | $150.00 |
| 40 | 12" conduit, type C (611E04600) | FT | 373 | $53.00 | $56.00 | $75.64 | $110.00 | $97.00 | $92.00 |
| 41 | 18" conduit, type B (611E07400) | FT | 34 | $134.00 | $130.00 | $135.33 | $150.00 | $157.00 | $215.00 |
| 42 | 30" conduit, type B (611E13400) | FT | 310 | $219.00 | $292.00 | $400.63 | $330.00 | $330.00 | $270.00 |
| 43 | 14" X 23" conduit, type B, 706.04 (611E52202) | FT | 127 | $197.00 | $220.00 | $390.66 | $330.00 | $457.00 | $286.00 |
| 44 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $2,800.00 | $2,788.00 | $4,042.69 | $4,200.00 | $4,859.00 | $3,873.00 |
| 45 | Manhole, no. 3 (611E99574) | EACH | 8 | $4,700.00 | $9,971.00 | $7,196.55 | $7,200.00 | $9,680.00 | $10,752 |
| 46 | Manhole reconstructed to grade (611E99660) | EACH | 11 | $1,700.00 | $1,205.00 | $2,916.28 | $4,000.00 | $1,443.00 | $977.00 |
| 47 | Drainage structure, misc.: bulkhead (611E99900) | EACH | 1 | $2,200.00 | $1,395.00 | $887.34 | $430.00 | $1,141.00 | $1,117.00 |
| 48 | Drainage structure, misc.: curb inlet, 600-2 (611E99900) | EACH | 7 | $3,000.00 | $2,810.00 | $4,452.53 | $6,000.00 | $5,973.00 | $4,768.00 |
| 49 | Drainage structure, misc.: curb inlet, 600-2, deep (611E99900) | EACH | 11 | $3,100.00 | $4,313.00 | $4,452.85 | $6,700.00 | $5,652.00 | $4,969.00 |
| 50 | Drainage structure, misc.: yard drain (611E99900) | EACH | 21 | $1,400.00 | $1,141.00 | $2,048.07 | $1,700.00 | $3,153.00 | $2,169.00 |
| 51 | Low strength mortar backfill (613E41200) | CY | 38 | $235.00 | $222.00 | $227.67 | $160.00 | $310.00 | $279.00 |
| 52 | Full depth pavement sawing (252E01500) | FT | 818 | $3.00 | $2.00 | $2.50 | $2.00 | $3.00 | $3.00 |
| 53 | Pavement planing, asphalt concrete, 1.25" depth (254E01000) | SY | 270 | $31.25 | $12.00 | $23.51 | $12.00 | $24.00 | $42.00 |
| 54 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,462 | $181.00 | $197.00 | $189.10 | $216.00 | $189.00 | $245.00 |
| 55 | Aggregate base (304E20000) | CY | 1,400 | $87.00 | $80.00 | $88.00 | $115.00 | $95.00 | $51.00 |
| 56 | Tack coat (407E10000) | GAL | 746 | $2.25 | $6.00 | $4.90 | $3.50 | $5.00 | $3.00 |
| 57 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 243 | $259.00 | $247.00 | $214.10 | $255.00 | $214.00 | $348.00 |
| 58 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 320 | $217.00 | $223.00 | $202.10 | $255.00 | $202.00 | $291.00 |
| 59 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 620 | $85.50 | $90.00 | $87.45 | $95.00 | $75.00 | $120.00 |
| 60 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 90 | $99.00 | $106.00 | $110.06 | $105.00 | $87.00 | $145.00 |
| 61 | Combination curb and gutter, type 2, as per plan (609E12001) | FT | 3,403 | $28.00 | $33.00 | $25.57 | $36.75 | $26.00 | $35.00 |
| 62 | Curb, type 6 (609E26000) | FT | 65 | $65.00 | $85.00 | $40.14 | $38.75 | $55.00 | $82.00 |
| 63 | Fire hydrant adjusted to grade (638E10400) | EACH | 3 | $3,900.00 | $1,200.00 | $1,998.14 | $4,000.00 | $2,029.00 | $2,540.00 |
| 64 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 39 | $265.00 | $103.00 | $544.93 | $445.00 | $721.00 | $900.00 |
| 65 | Special - 3/4" copper water service line, (city of (638E20766) | FT | 137 | $32.00 | $33.00 | $167.17 | $75.00 | $31.00 | $35.00 |
| 66 | Special - 3/4" corporation stop, (city of newark S (638E20892) | EACH | 4 | $980.00 | $111.00 | $707.60 | $520.00 | $402.00 | $287.00 |
| 67 | Special - service box, (city of newark standard DR (638E20904) | EACH | 4 | $1,340.00 | $521.00 | $771.24 | $740.00 | $641.00 | $711.00 |
| 68 | Water work, misc.: waterline lowering (638E98000) | EACH | 5 | $9,600.00 | $4,437.00 | $19,020 | $11,500 | $9,883.00 | $10,300 |
| 69 | Conduit, misc.: sanitary sewer service replaced (611E97200) | EACH | 5 | $2,800.00 | $564.00 | $649.48 | $2,400.00 | $7,503.00 | $5,500.00 |
| 70 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 251.40 | $25.00 | $12.00 | $25.00 | $25.00 | $21.00 | $13.00 |
| 71 | Sign post reflector (630E08600) | EACH | 9 | $55.00 | $41.00 | $55.00 | $55.00 | $73.00 | $47.00 |
| 72 | Sign, flat sheet (630E80100) | SF | 115 | $28.00 | $24.00 | $28.00 | $28.00 | $24.00 | $27.00 |
| 73 | Removal of ground mounted sign and disposal (630E84900) | EACH | 21 | $30.00 | $24.00 | $30.00 | $30.00 | $18.00 | $564.00 |
| 74 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $250.00 | $53.00 | $250.00 | $250.00 | $72.00 | $61.00 |
| 75 | Removal of ground mounted post support and disposal (630E86002) | EACH | 17 | $30.00 | $24.00 | $30.00 | $30.00 | $23.00 | $27.00 |
| 76 | Center line (644E00300) | MI | 0.49 | $6,250.00 | $8,500.00 | $6,250.00 | $6,250.00 | $10,846 | $8,400.00 |
| 77 | Channelizing line, 8" (644E00400) | FT | 167 | $2.30 | $3.00 | $2.30 | $2.30 | $3.00 | $3.00 |
| 78 | Stop line (644E00500) | FT | 64 | $8.00 | $12.00 | $8.00 | $8.00 | $8.00 | $11.00 |
| 79 | Crosswalk line, 12" (644E00620) | FT | 432 | $3.75 | $5.50 | $3.75 | $3.75 | $4.00 | $5.00 |
| 80 | School symbol marking, 72" (644E01100) | EACH | 1 | $830.00 | $528.00 | $830.00 | $830.00 | $750.00 | $1,115.00 |
| 81 | Lane arrow (644E01300) | EACH | 14 | $95.00 | $206.00 | $95.00 | $95.00 | $135.00 | $128.00 |
| 82 | Word on pavement, 72" (644E01400) | EACH | 1 | $125.00 | $323.00 | $125.00 | $125.00 | $210.00 | $168.00 |
| 83 | Crosswalk line, 12", type B125, as per plan (647E20036) | FT | 276 | $17.85 | $5.50 | $17.85 | $17.85 | $16.00 | $24.00 |
| 84 | Pull box, misc.: reset (625E31600) | EACH | 3 | $825.00 | $700.00 | $788.41 | $400.00 | $4,000.00 | $1,344.00 |
| 85 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $90.00 | $88.00 | $130.27 | $65.00 | $65.00 | $161.00 |
| 86 | Detour signing (614E12420) | LS | 1 | $3,750.00 | $5,873.00 | $3,750.00 | $3,750.00 | $3,750.00 | $14,065 |
| 87 | Water (616E10000) | MGAL | 20 | $75.00 | $111.00 | $79.16 | $1.00 | $22.00 | $145.00 |
| 88 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $18,000 | $25,000 | $15,327 | $18,000 | $29,000 | $26,881 |
| 89 | Maintaining traffic (614E11000) | LS | 1 | $27,000 | $13,400 | $7,000.00 | $40,000 | $38,320 | $4,531.00 |
| 90 | Construction layout stakes and surveying (623E10000) | LS | 1 | $29,200 | $32,000 | $18,260 | $15,000 | $12,866 | $35,816 |
| 91 | Mobilization (624E10000) | LS | 1 | $106,000 | $154,969 | $100,000 | $65,000 | $67,882 | $38,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.