ODOT contract 260229 bid tabulation

CHP-US 68-01.27 (TWO LANE RESURFACING). Let by Ohio DOT on May 7, 2026, CHP. 3 bids received; low bid $1,679,378 by Shelly Company, +6.8% against the engineer's estimate of $1,572,000.

Owner
Ohio DOT
Letting
07 MAY 2026
Pay items
33
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$1,679,378Low+7.0%
2A & B Asphalt Corporation$1,780,955+6.0%+13%
3Barrett Paving Materials Inc$1,899,836+13%+21%
ODOT contract 260229: bids by rank

Engineer's estimate: $1,572,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company2. A & B Asphalt Corporation3. Barrett Paving Materials Inc
1Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY1,000$70.00$93.10$75.00
2Non-tracking tack coat (407E20000)GAL9,530$3.00$3.00$4.50
3Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100)CY4,673$243.00$257.64$272.00
4Compacted aggregate (617E10100)CY280$105.00$157.26$150.00
5Rumble stripes, edge line (asphalt concrete) (618E41000)MI8.32$1,180.00$1,180.00$1,565.00
6Rumble stripes, center line (asphalt concrete) (618E43000)MI3.29$1,180.00$1,180.00$1,770.00
7Longitudinal joint preparation (874E21000)MI3.29$2,000.00$4,950.00$5,000.00
8Pavement planing, asphalt concrete, class A, 1.5" (897E01010)SY112,118$1.55$1.25$2.15
9Patching planed surface, as per plan (897E02001)SY100$20.00$24.15$25.00
10RPM (621E00100)EACH438$38.00$47.93$38.00
11Raised pavement marker removed (621E54000)EACH438$6.00$18.97$10.00
12Edge line, 6", type 1 (642E00104)MI9.74$875.00$958.00$958.00
13Lane line, 6", type 1 (642E00204)MI0.46$690.00$484.00$494.00
14Center line, type 1 (642E00300)MI3.93$750.00$1,917.00$1,917.00
15Channelizing line, 8" (644E00400)FT355$2.00$1.75$1.75
16Channelizing line, 12" (644E00404)FT712$2.50$2.00$2.00
17Stop line (644E00500)FT245$7.00$7.00$7.00
18Transverse/diagonal line (644E00700)FT1,187$7.00$6.00$6.00
19Lane arrow (644E01300)EACH10$120.00$125.00$125.00
20Dotted line, 6" (644E01510)FT845$1.00$1.75$1.75
21Law enforcement officer with patrol car for assistance (614E11110)HR100$90.00$105.00$98.00
22Work zone marking sign (614E12460)EACH35$105.72$120.00$120.00
23Work zone lane line, class III, 6", 642 paint (614E20560)MI0.92$660.00$1,048.00$1,048.00
24Work zone center line, class I, 642 paint (614E21100)MI7.85$800.00$1,188.00$1,188.00
25Work zone edge line, class I, 6", 642 paint (614E22110)MI19.46$775.00$2,375.00$2,375.00
26Work zone channelizing line, class III, 8", 642 paint (614E23680)FT710$1.00$1.00$1.00
27Work zone channelizing line, class III, 12", 642 paint (614E23690)FT1,424$1.20$1.25$1.25
28Work zone dotted line, class III, 4", 642 paint (614E24610)FT2,214$0.70$0.50$0.50
29Work zone stop line, class III, 642 paint (614E26610)FT490$7.00$3.00$3.00
30Work zone arrow, class III, 642 paint (614E30650)EACH20$55.00$30.00$30.00
31Premium for contract performance bond and for payment bond (103E05000)LS1$8,000.00$5,268.46$5,145.77
32Maintaining traffic (614E11000)LS1$83,000$69,654$27,000
33Mobilization (624E10000)LS1$40,000$26,936$30,000
ODOT contract 260229: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy