ODOT contract 260251 bid tabulation
MOT-/WAR-IR 75-11.56/00.00 (MAJOR RECONSTRUCTION). Let by Ohio DOT on May 7, 2026, MOT. 2 bids received; low bid $55,097,195 by John R Jurgensen Company, -6.5% against the engineer's estimate of $58,953,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 267
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $55,097,195 | Low | -7.0% |
| 2 | Barrett Paving Materials Inc | $66,470,000 | +21% | +13% |
Engineer's estimate: $58,953,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Barrett Paving Materials Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,019 | $150,000 |
| 2 | Headwall removed (202E20010) | EACH | 6 | $924.37 | $250.00 |
| 3 | Pavement removed (202E23000) | SY | 124,595 | $9.08 | $11.00 |
| 4 | Wearing course removed (202E23500) | SY | 93,060 | $4.15 | $6.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 257 | $30.66 | $40.00 |
| 6 | Pipe removed, 24" and under, as per plan (202E35101) | FT | 149 | $32.16 | $25.00 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 18 | $58.90 | $90.00 |
| 8 | Guardrail removed (202E38000) | FT | 4,278 | $5.00 | $5.00 |
| 9 | Catch basin removed (202E58100) | EACH | 1 | $836.03 | $950.00 |
| 10 | Special - pipe cleanout over 48" (202E70130) | FT | 1,444 | $60.00 | $30.00 |
| 11 | Excavation (203E10000) | CY | 40,482 | $5.16 | $20.00 |
| 12 | Excavation, as per plan (203E10001) | CY | 5,102 | $45.72 | $35.00 |
| 13 | Embankment (203E20000) | CY | 77,855 | $6.78 | $6.00 |
| 14 | Subgrade compaction (204E10000) | SY | 20,940 | $3.16 | $1.50 |
| 15 | Excavation of subgrade (204E13000) | CY | 2,283 | $37.31 | $70.00 |
| 16 | Excavation of subgrade, as per plan (204E13001) | CY | 4,341 | $45.09 | $70.00 |
| 17 | Granular material, type B (204E30010) | CY | 2,283 | $67.15 | $100.00 |
| 18 | Granular material, type B, as per plan (204E30011) | CY | 4,341 | $68.06 | $100.00 |
| 19 | Proof rolling (204E45000) | HR | 87 | $233.29 | $200.00 |
| 20 | Geotextile fabric (204E50000) | SY | 19,873 | $2.52 | $3.50 |
| 21 | Cement (206E10500) | TON | 4,755 | $256.19 | $222.00 |
| 22 | Curing coat (206E11000) | SY | 157,518 | $1.20 | $1.25 |
| 23 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 157,518 | $4.76 | $4.00 |
| 24 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $55,391 | $55,000 |
| 25 | Guardrail, type MGS (606E15050) | FT | 4,537.50 | $25.75 | $25.75 |
| 26 | Anchor assembly, MGS type B (606E26050) | EACH | 5 | $2,725.00 | $2,725.00 |
| 27 | Anchor assembly, MGS type E (606E26150) | EACH | 17 | $2,650.00 | $2,650.00 |
| 28 | Anchor assembly, MGS type T (606E26550) | EACH | 20 | $1,200.00 | $1,200.00 |
| 29 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,250.00 | $2,250.00 |
| 30 | Concrete barrier, single slope, type D (622E10160) | FT | 253 | $140.00 | $140.00 |
| 31 | Concrete barrier end section, type D (622E25000) | EACH | 2 | $5,787.77 | $4,000.00 |
| 32 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 2 | $5,787.77 | $4,000.00 |
| 33 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 71 | $299.18 | $150.00 |
| 34 | Rock channel protection, type C with filter (601E32200) | CY | 13 | $445.94 | $600.00 |
| 35 | Soil analysis test (659E00100) | EACH | 4 | $50.00 | $85.00 |
| 36 | Topsoil (659E00300) | CY | 52,160 | $12.53 | $12.00 |
| 37 | Seeding and mulching (659E10000) | SY | 385,975 | $0.48 | $0.78 |
| 38 | Repair seeding and mulching (659E14000) | SY | 19,299 | $0.48 | $0.86 |
| 39 | Inter-seeding (659E15000) | SY | 19,299 | $0.01 | $0.61 |
| 40 | Commercial fertilizer (659E20000) | TON | 53.82 | $500.00 | $700.00 |
| 41 | Lime (659E31000) | ACRE | 79.75 | $1.00 | $10.00 |
| 42 | Water (659E35000) | MGAL | 2,137 | $0.01 | $0.50 |
| 43 | Mowing (659E40000) | MSF | 869 | $1.72 | $6.56 |
| 44 | Slope erosion protection (670E00500) | SY | 76,211 | $1.45 | $2.05 |
| 45 | Ditch erosion protection (670E00700) | SY | 16,041 | $1.45 | $1.88 |
| 46 | Storm water pollution prevention plan (832E15000) | LS | 1 | $19,500 | $25,000 |
| 47 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $48,438 | $50,000 |
| 48 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $28,472 | $31,000 |
| 49 | Erosion control (832E30000) | EACH | 1,200,000 | $1.00 | $1.00 |
| 50 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 847 | $5.00 | $5.25 |
| 51 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $16,082 | $2,500.00 |
| 52 | Concrete masonry (602E20000) | CY | 3 | $2,861.51 | $2,200.00 |
| 53 | 6" shallow pipe underdrains (605E11100) | FT | 86,071 | $13.42 | $14.50 |
| 54 | 6" unclassified pipe underdrains (605E13300) | FT | 100 | $72.47 | $50.00 |
| 55 | 6" rock cut underdrains (605E13500) | FT | 20,516 | $17.35 | $20.00 |
| 56 | 6" base pipe underdrains (605E14000) | FT | 60,211 | $10.65 | $13.00 |
| 57 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 4,215 | $40.36 | $25.00 |
| 58 | 18" conduit, type D (611E07900) | FT | 40 | $83.04 | $85.00 |
| 59 | 21" conduit, type B (611E08900) | FT | 177 | $222.17 | $240.00 |
| 60 | 21" conduit, type B (611E08900) | FT | 16 | $345.65 | $185.00 |
| 61 | 30" conduit, type A, 706.02 (611E13200) | FT | 14 | $351.92 | $230.00 |
| 62 | 36" conduit, type A (611E16200) | FT | 12 | $671.26 | $300.00 |
| 63 | Field paving of existing pipe (102" diameter) (611E96550) | FT | 168 | $208.71 | $360.00 |
| 64 | Field paving of existing pipe (66" diameter) (611E96550) | FT | 112 | $186.18 | $480.00 |
| 65 | Catch basin, no. 4 (611E98230) | EACH | 1 | $10,767 | $9,000.00 |
| 66 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 5 | $3,223.31 | $2,600.00 |
| 67 | Precast reinforced concrete outlet (611E99710) | EACH | 39 | $592.83 | $700.00 |
| 68 | Conduit renewal using spray applied structural liner, round conduit (833E10000) | FT | 110 | $1,425.00 | $735.00 |
| 69 | Pavement planing, asphalt concrete (depth = 1.5") (254E01000) | SY | 69,343 | $3.16 | $3.50 |
| 70 | Patching planed surface, as per plan (254E01601) | SY | 350 | $6.53 | $20.00 |
| 71 | Asphalt concrete base, PG64-22, (449) (302E56000) | CY | 67,724 | $194.81 | $220.00 |
| 72 | Aggregate base (304E20000) | CY | 49,338 | $76.26 | $90.00 |
| 73 | Rubblize and roll (320E70000) | SY | 103,494 | $5.04 | $2.55 |
| 74 | Filler aggregate (320E80000) | CY | 5,348 | $64.23 | $90.00 |
| 75 | Non-tracking tack coat (407E20000) | GAL | 50,636 | $5.00 | $5.00 |
| 76 | Anti-segregation equipment (442E00100) | CY | 27,189 | $12.00 | $10.00 |
| 77 | Asphalt concrete intermediate course, 12.5 MM, type A (446), as per plan (442E10081) | CY | 13,263 | $218.81 | $295.00 |
| 78 | Asphalt concrete surface course, 12.5 MM, type A (447), as per plan (442E10301) | CY | 14,110 | $330.30 | $360.00 |
| 79 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 261 | $362.57 | $360.00 |
| 80 | Curb, type 4-C (609E24510) | FT | 36 | $80.13 | $60.00 |
| 81 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 16.78 | $865.00 | $1,500.00 |
| 82 | Connection, fused pull apart (625E00450) | EACH | 186 | $195.00 | $195.00 |
| 83 | Connection, unfused permanent (625E00480) | EACH | 48 | $173.00 | $173.00 |
| 84 | Light pole, conventional, design AT15B40 (625E10490) | EACH | 23 | $3,523.00 | $3,523.00 |
| 85 | Light pole, conventional, design AT20B40 (625E10490) | EACH | 2 | $4,681.00 | $4,681.00 |
| 86 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 62 | $2,081.00 | $2,081.00 |
| 87 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 1,836 | $4.95 | $4.95 |
| 88 | No. 10 AWG pole and bracket cable (625E23400) | FT | 12,120 | $2.20 | $2.20 |
| 89 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 12,882 | $14.55 | $14.55 |
| 90 | Conduit, jacked or drilled, 725.04, 3" (625E25902) | FT | 542 | $72.70 | $72.70 |
| 91 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 62 | $685.00 | $685.00 |
| 92 | Trench (625E29000) | FT | 12,124 | $11.10 | $11.10 |
| 93 | Pull box, 725.08, 18" (625E30700) | EACH | 15 | $899.00 | $899.00 |
| 94 | Pull box removed (625E31510) | EACH | 15 | $527.00 | $527.00 |
| 95 | Ground rod (625E32000) | EACH | 62 | $286.00 | $286.00 |
| 96 | Power service, as per plan (625E34001) | EACH | 1 | $15,838 | $15,838 |
| 97 | Remove and reerect existing light pole, as per plan (625E35011) | EACH | 36 | $763.00 | $763.00 |
| 98 | Underground warning marking tape (625E36010) | FT | 12,124 | $1.95 | $1.95 |
| 99 | Special - maintain existing lighting (625E40000) | LS | 1 | $301,500 | $301,500 |
| 100 | Special - replacement of existing lighting unit (625E40010) | EACH | 2 | $4,778.00 | $4,778.00 |
| 101 | Light pole removed (625E75400) | EACH | 1 | $236.00 | $236.00 |
| 102 | Light pole foundation removed (625E75500) | EACH | 37 | $429.77 | $393.00 |
| 103 | Luminaire removed, as per plan (625E75507) | EACH | 37 | $118.00 | $118.00 |
| 104 | Power service removed, as per plan (625E75511) | EACH | 1 | $944.00 | $944.00 |
| 105 | Arc flash calculations and label (CC-'A') (625E76000) | EACH | 1 | $2,420.00 | $2,420.00 |
| 106 | Delineator, post ground mounted (620E00500) | EACH | 12 | $106.00 | $106.00 |
| 107 | Removal of delineator (620E31200) | EACH | 12 | $16.11 | $7.50 |
| 108 | RPM (621E00100) | EACH | 2,525 | $35.70 | $35.70 |
| 109 | RPM reflector (621E00300) | EACH | 9 | $20.00 | $20.00 |
| 110 | Raised pavement marker removed (621E54000) | EACH | 1,080 | $11.22 | $8.00 |
| 111 | Ground rod (625E32000) | EACH | 16 | $286.00 | $286.00 |
| 112 | Barrier reflector, type 1, one way (626E00102) | EACH | 4 | $9.91 | $12.50 |
| 113 | Barrier reflector, type 2, one way (626E00110) | EACH | 84 | $10.00 | $10.00 |
| 114 | Ground mounted support, no. 2 post (630E02100) | FT | 159 | $67.00 | $67.00 |
| 115 | Ground mounted support, no. 3 post (630E03100) | FT | 1,276.50 | $15.00 | $15.00 |
| 116 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 69.30 | $23.00 | $23.00 |
| 117 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 79.30 | $25.00 | $25.00 |
| 118 | Ground mounted structural beam support, W10X12 (630E07600) | FT | 104.30 | $30.50 | $30.50 |
| 119 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 58 | $67.00 | $67.00 |
| 120 | Sign post reflector (630E08600) | EACH | 16 | $45.00 | $45.00 |
| 121 | Breakaway structural beam connection (630E09000) | EACH | 14 | $525.00 | $525.00 |
| 122 | Overhead sign support, type TC-12.31, design 12 (630E72340) | EACH | 3 | $39,600 | $39,600 |
| 123 | Overhead sign support, type TC-15.116, design 2 (630E72420) | EACH | 4 | $87,700 | $87,700 |
| 124 | Overhead sign support, type TC-15.116, design 3 (630E72430) | EACH | 2 | $120,200 | $120,200 |
| 125 | Overhead sign support, type TC-16.22, design 14, as per plan (630E72561) | EACH | 1 | $23,700 | $23,700 |
| 126 | Overhead sign support, misc.: mechanical damper (630E74500) | EACH | 1 | $875.00 | $875.00 |
| 127 | Sign hanger assembly, mast arm, as per plan (630E79101) | EACH | 1 | $425.00 | $425.00 |
| 128 | Sign support assembly, pole mounted (630E79500) | EACH | 4 | $160.00 | $160.00 |
| 129 | Sign support assembly, pole mounted, as per plan (630E79501) | EACH | 1 | $260.00 | $260.00 |
| 130 | Sign, flat sheet (630E80100) | SF | 404.80 | $23.00 | $23.00 |
| 131 | Sign, ground mounted extrusheet (630E80200) | SF | 96 | $42.00 | $42.00 |
| 132 | Sign, overhead extrusheet (630E80224) | SF | 2,554 | $49.00 | $49.00 |
| 133 | Mainline reference marker (630E81000) | EACH | 34 | $250.00 | $250.00 |
| 134 | Ground mounted structural beam support foundation (630E84500) | EACH | 14 | $1,800.00 | $1,800.00 |
| 135 | Rigid overhead sign support foundation (630E84510) | EACH | 16 | $10,500 | $10,500 |
| 136 | Removal of ground mounted sign and disposal (630E84900) | EACH | 66 | $15.00 | $15.00 |
| 137 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $125.00 | $125.00 |
| 138 | Removal of ground mounted post support and disposal (630E86002) | EACH | 72 | $35.00 | $35.00 |
| 139 | Removal of ground mounted structural beam support (630E86102) | EACH | 8 | $175.00 | $175.00 |
| 140 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 19 | $550.00 | $550.00 |
| 141 | Removal of pole mounted sign and disposal (630E87500) | EACH | 4 | $20.00 | $20.00 |
| 142 | Removal of overhead sign support and disposal, type TC-12.30 (630E89706) | EACH | 6 | $1,850.00 | $1,850.00 |
| 143 | Removal of overhead sign support and disposal, type TC-7.65 (630E89802) | EACH | 3 | $2,300.00 | $2,300.00 |
| 144 | Removal of miscellaneous traffic control item: sig (630E89902) | EACH | 2 | $530.06 | $1,500.00 |
| 145 | Edge line, 6" (646E10010) | MI | 0.15 | $19,010 | $19,010 |
| 146 | Lane line, 6" (646E10110) | MI | 0.13 | $13,570 | $13,570 |
| 147 | Stop line (646E10400) | FT | 36 | $15.50 | $15.50 |
| 148 | Chevron marking (646E10620) | FT | 335 | $14.25 | $14.25 |
| 149 | Lane arrow (646E20300) | EACH | 6 | $385.00 | $385.00 |
| 150 | Wrong way arrow (646E20320) | EACH | 3 | $500.00 | $500.00 |
| 151 | Lane reduction arrow (646E20350) | EACH | 2 | $650.00 | $650.00 |
| 152 | Speed measurement marking (646E20710) | EACH | 18 | $697.85 | $325.00 |
| 153 | Removal of pavement marking (646E50200) | SF | 42 | $7.35 | $7.35 |
| 154 | Removal of pavement marking (646E50300) | MI | 0.45 | $9,145.00 | $9,145.00 |
| 155 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 18.01 | $4,750.00 | $4,750.00 |
| 156 | Wet reflective epoxy pavement marking, lane line, 6" (807E12110) | MI | 22.69 | $1,975.00 | $1,975.00 |
| 157 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 11,052 | $2.95 | $2.95 |
| 158 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 4,426 | $1.50 | $1.50 |
| 159 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 40.70 | $1,650.00 | $1,650.00 |
| 160 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 4,426 | $1.00 | $1.00 |
| 161 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 17,278 | $1.50 | $1.50 |
| 162 | Connection, unfused permanent (625E00480) | EACH | 6 | $173.00 | $173.00 |
| 163 | No. 6 AWG 600 volt distribution cable (625E22990) | FT | 3,951 | $3.35 | $3.35 |
| 164 | Conduit, 2", 725.052 (625E25410) | FT | 911 | $8.50 | $8.50 |
| 165 | Conduit, jacked or drilled, 725.052, as per plan (625E25909) | FT | 345 | $51.00 | $51.00 |
| 166 | Conduit, jacked or drilled, 725.052, as per plan (625E25909) | FT | 910 | $42.90 | $42.90 |
| 167 | Conduit cleaned and cables removed (625E25910) | FT | 1,275 | $1.75 | $1.75 |
| 168 | Trench (625E29000) | FT | 911 | $13.45 | $13.45 |
| 169 | Trench in paved areas, as per plan (625E29401) | FT | 18 | $280.96 | $50.00 |
| 170 | Pull box, 725.08, 24" (625E30706) | EACH | 13 | $1,368.00 | $1,368.00 |
| 171 | Pull box removed (625E31510) | EACH | 23 | $500.00 | $500.00 |
| 172 | Pull box, misc.: adjust pull box to grade (625E31600) | EACH | 5 | $500.00 | $500.00 |
| 173 | Power service, as per plan (625E34001) | EACH | 1 | $7,826.00 | $7,826.00 |
| 174 | Underground warning marking tape (625E36010) | FT | 964 | $3.45 | $3.45 |
| 175 | Removal of miscellaneous traffic signal item: high (632E90020) | EACH | 1 | $1,526.00 | $1,526.00 |
| 176 | Removal of miscellaneous traffic signal item: pole (632E90020) | EACH | 1 | $1,526.00 | $1,526.00 |
| 177 | Removal of miscellaneous traffic signal item: pole (632E90020) | EACH | 3 | $1,526.00 | $1,526.00 |
| 178 | Removal of miscellaneous traffic signal item: wood (632E90020) | EACH | 1 | $763.00 | $763.00 |
| 179 | Controller work pad, as per plan (633E67201) | EACH | 3 | $692.00 | $692.00 |
| 180 | ITS pull box with pad and standard lid assembly, 3 (809E01900) | EACH | 10 | $4,557.00 | $4,557.00 |
| 181 | ITS pull box with pad and hinged lid assembly, 32" wide, type 1 (809E01920) | EACH | 13 | $5,687.00 | $5,687.00 |
| 182 | Micro-duct pathway, 4 cell 14/10 (809E20020) | FT | 17,804 | $8.25 | $8.25 |
| 183 | ITS cabinet - ground mounted (809E65000) | EACH | 3 | $8,818.00 | $8,818.00 |
| 184 | Step-down transformer, 3KVA (809E65100) | EACH | 3 | $12,800 | $12,800 |
| 185 | ITS device, misc.: removal and reinstallation of I (809E65990) | EACH | 1 | $3,382.00 | $3,382.00 |
| 186 | Maintaining ITS during construction (809E70000) | LS | 1 | $77,857 | $77,858 |
| 187 | Conduit, 2", 725.04 (625E25400) | FT | 7 | $60.70 | $60.70 |
| 188 | Trench in paved areas, as per plan (625E29401) | FT | 7 | $302.59 | $50.00 |
| 189 | Ground rod (625E32000) | EACH | 1 | $269.00 | $269.00 |
| 190 | Underground warning marking tape (625E36010) | FT | 7 | $12.90 | $12.90 |
| 191 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 3 | $1,248.00 | $1,248.00 |
| 192 | Pedestrian signal head (LED), type D2, countdown (632E20730) | EACH | 1 | $734.00 | $734.00 |
| 193 | Covering of vehicular signal head (632E25000) | EACH | 3 | $84.00 | $84.00 |
| 194 | Covering of pedestrian signal head (632E25010) | EACH | 1 | $84.00 | $84.00 |
| 195 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 306 | $3.00 | $3.00 |
| 196 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 397 | $3.90 | $3.90 |
| 197 | Signal support foundation, as per plan (632E64011) | EACH | 1 | $8,063.00 | $8,063.00 |
| 198 | Signal support, type TC-81.22, design 13, as per plan (632E72141) | EACH | 1 | $23,832 | $23,832 |
| 199 | Removal of traffic signal installation (632E90100) | EACH | 1 | $4,830.00 | $4,830.00 |
| 200 | Signalization, misc.: relocate existing dilemma ZO (632E90400) | EACH | 1 | $1,494.00 | $1,494.00 |
| 201 | Signalization, misc.: relocate existing stop line (632E90400) | EACH | 1 | $1,494.00 | $1,494.00 |
| 202 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $10,255 | $10,255 |
| 203 | Removal misc.: rumble strips (A) (202E98200) | FT | 15,400 | $10.41 | $13.12 |
| 204 | Pavement repair, as per plan (253E01001) | SY | 1,000 | $140.98 | $150.00 |
| 205 | Pavement repair, as per plan (253E01001) | SY | 1,000 | $80.95 | $150.00 |
| 206 | Pavement planing, asphalt concrete, (T = 2") (254E01000) | SY | 13,340 | $3.08 | $4.00 |
| 207 | Non-tracking tack coat (407E20000) | GAL | 1,134 | $5.00 | $5.00 |
| 208 | Traffic compacted surface, type A or B (410E12000) | CY | 100 | $179.15 | $330.00 |
| 209 | Traffic compacted surface, type C (410E13000) | CY | 100 | $179.15 | $330.00 |
| 210 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 240 | $317.83 | $370.00 |
| 211 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 3,000 | $105.00 | $100.00 |
| 212 | Increased barrier delineation (614E11630) | FT | 5,245 | $3.04 | $1.34 |
| 213 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 28 | $2,744.37 | $2,067.12 |
| 214 | Detour signing (614E12420) | LS | 1 | $10,868 | $8,950.00 |
| 215 | Work zone increased penalties sign (614E12484) | EACH | 28 | $230.99 | $249.88 |
| 216 | Replacement sign (614E12500) | EACH | 20 | $300.00 | $173.12 |
| 217 | Replacement drum (614E12600) | EACH | 100 | $150.00 | $46.24 |
| 218 | Work zone crossover lighting system (614E12756) | EACH | 3 | $41,200 | $41,200 |
| 219 | Work zone raised pavement marker, as per plan (614E12801) | EACH | 9,570 | $34.12 | $23.00 |
| 220 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $275.33 | $2,000.00 |
| 221 | Barrier reflector, type 1, one way (614E13310) | EACH | 2,151 | $21.02 | $7.38 |
| 222 | Barrier reflector, type 2, one way (614E13312) | EACH | 52 | $23.35 | $9.54 |
| 223 | Object marker, one way (614E13350) | EACH | 1,410 | $21.02 | $17.39 |
| 224 | Object marker, two way (614E13360) | EACH | 1,446 | $21.02 | $19.56 |
| 225 | Portable changeable message sign, as per plan (614E18601) | SNMT | 200 | $500.00 | $850.00 |
| 226 | Work zone lane line, class I, 6", 648 (614E20366) | MI | 53 | $1,200.00 | $1,200.00 |
| 227 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 75.69 | $180.00 | $180.00 |
| 228 | Work zone edge line, class I, 6", 648 (614E22336) | MI | 73.77 | $2,000.00 | $2,000.00 |
| 229 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 91.79 | $480.00 | $480.00 |
| 230 | Work zone channelizing line, class I, 12", 648 (614E23150) | FT | 82,206 | $1.00 | $1.00 |
| 231 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 93,258 | $0.75 | $0.75 |
| 232 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 32,352 | $0.90 | $0.90 |
| 233 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 43,004 | $0.50 | $0.50 |
| 234 | Work zone transverse/diagonal line, class I, 642 paint (614E25200) | FT | 560 | $5.60 | $5.60 |
| 235 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 16 | $75.00 | $75.00 |
| 236 | Work zone speed measurement marking, class I, 642 paint (614E32658) | EACH | 108 | $522.85 | $150.00 |
| 237 | Work zone pavement marking, misc.: route shield SY (614E98200) | EACH | 22 | $2,395.00 | $2,395.00 |
| 238 | Work zone pavement marking, misc.: word on pavemen (614E98200) | EACH | 22 | $2,300.00 | $2,300.00 |
| 239 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $875,654 | $3,000,000 |
| 240 | Pavement for maintaining traffic, class A (615E20000) | SY | 94,215 | $57.67 | $73.00 |
| 241 | Water (616E10000) | MGAL | 675 | $167.76 | $20.00 |
| 242 | Portable barrier, 50", as per plan (622E41011) | FT | 36,440 | $30.12 | $31.63 |
| 243 | Portable barrier, unanchored, as per plan (622E41101) | FT | 32,060 | $14.29 | $25.21 |
| 244 | Portable barrier, anchored, as per plan (622E41111) | FT | 1,400 | $57.29 | $29.57 |
| 245 | Sign, temporary overlay (630E80300) | SF | 144.40 | $19.97 | $19.97 |
| 246 | Removal of temporary overlay sign and disposal (630E89894) | EACH | 4 | $367.51 | $367.51 |
| 247 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 461 | $376.94 | $376.94 |
| 248 | Portable non-intrusive traffic sensor, class II (896E00012) | SNMT | 48 | $995.00 | $995.00 |
| 249 | Portable changeable message sign, as per plan (896E00021) | SNMT | 12 | $1,195.00 | $1,195.00 |
| 250 | Unclassified excavation (503E21100) | CY | 28 | $308.48 | $117.80 |
| 251 | Uncoated steel reinforcement (509E25000) | LB | 2,532 | $2.47 | $4.42 |
| 252 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 126 | $56.91 | $39.95 |
| 253 | Class QC1 concrete, pier above footings (511E40510) | CY | 52 | $1,147.46 | $920.24 |
| 254 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 65 | $85.00 | $85.00 |
| 255 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 20 | $50.00 | $50.00 |
| 256 | Department'S share of the dispute resolution board (100E51100) | EACH | 155,000 | $1.00 | $1.00 |
| 257 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $243,632 | $172,878 |
| 258 | CPM progress schedule (108E10000) | LS | 1 | $43,759 | $20,000 |
| 259 | Special - departments share facilitated partnering costs (111E10100) | EACH | 12,250 | $1.00 | $1.00 |
| 260 | Maintaining traffic (614E11000) | LS | 1 | $1,087,957 | $4,600,000 |
| 261 | Field office, type C (619E16020) | MNTH | 42 | $4,550.63 | $2,000.00 |
| 262 | Construction layout stakes and surveying (623E10000) | LS | 1 | $297,245 | $500,000 |
| 263 | Mobilization (624E10000) | LS | 1 | $1,500,000 | $350,000 |
| 300 | Removal misc.: rumble strips (B) (202E98200) | FT | 6,080 | $11.57 | $10.52 |
| 301 | Providing electronic instrumentation (623E11000) | LS | 1 | $37,456 | $30,000 |
| 302 | Wet reflective epoxy pavement marking, dotted line, 12" (807E12430) | FT | 6,226 | $1.56 | $1.56 |
| 303 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 502 | $252.60 | $290.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.