RankBidderTotal bidAgainst the low bidAgainst the estimate
1John R Jurgensen Company$7,535,868Low0.0%
2Fillmore Construction$8,765,720+16%+16%
ODOT contract 260347: bids by rank

Engineer's estimate: $7,545,000.

Bid tabulation

LinePay itemUnitQuantity1. John R Jurgensen Company2. Fillmore Construction
1Pavement removed, as per plan (202E23001)SY1,988$31.44$20.00
2Concrete median removed, as per plan (202E30601)SY1,179$58.45$20.00
3Curb removed, as per plan (202E32001)FT3,056$14.86$13.00
4Guardrail removed, as per plan (202E38001)FT1,250$2.80$2.80
5Anchor assembly removed, type A, as per plan (202E42001)EACH4$340.00$340.00
6Anchor assembly removed, barrier design (202E42210)EACH2$500.00$500.00
7Excavation, as per plan (203E10001)CY330$50.23$40.00
8Embankment (203E20000)CY407$65.37$60.00
9Embankment, as per plan (203E20001)CY24$30.00$30.00
10Subgrade compaction, as per plan (204E10001)SY3,379$2.58$4.00
11Granular material, type E, as per plan (204E30041)CY25$197.16$200.00
12Proof rolling (204E45000)HR6.80$229.49$120.00
13Linear grading (209E60200)STA6.40$552.62$2,500.00
14Guardrail, type MGS (606E15050)FT151.50$27.00$27.00
15Guardrail, type MGS half post spacing (606E15150)FT314.06$35.00$35.00
16Anchor assembly, MGS type B (606E26050)EACH2$2,550.00$2,550.00
17Anchor assembly, MGS type T (606E26550)EACH2$1,200.00$1,200.00
18Impact attenuator, type 2 (bidirectional), as per plan (606E60029)EACH2$27,392$35,000
19Guardrail, misc.:post footing anchor (606E98100)EACH37$475.00$475.00
20Concrete median, as per plan (609E71001)SF105$97.04$90.00
21Concrete barrier, single slope, type B, as per plan (622E10061)FT152$590.74$585.00
22Concrete barrier end section, type B, as per plan (622E24841)EACH2$16,289$14,500
23Inspection and compaction testing of unbound materials (878E25000)LS1$12,021$37,500
24Topsoil (659E00300)CY366$70.20$68.00
25Seeding and mulching (659E10000)SY3,267$1.45$1.45
26Repair seeding and mulching (659E14000)SY163$1.45$2.20
27Inter-seeding (659E15000)SY163$0.45$2.20
28Commercial fertilizer (659E20000)TON0.44$800.00$1,400.00
29Lime (659E31000)ACRE0.68$0.15$450.00
30Water (659E35000)MGAL18$0.15$10.00
31Erosion control (832E30000)EACH1,000$1.00$1.00
32Catch basin adjusted to grade (611E98630)EACH4$1,389.60$1,500.00
33Manhole adjusted to grade (611E99654)EACH4$1,389.60$1,500.00
34Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY532$164.36$30.00
35Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY235$191.50$45.00
36Partial depth pavement repair (asphalt concrete base), as per plan (251E01041)SY138$173.63$60.00
37Full depth pavement sawing (252E01500)FT5,772$1.65$3.00
38Pavement planing, asphalt concrete, 1.5" (254E01000)SY399,379$1.52$2.00
39Asphalt concrete base, PG64-22, (449) (301E56000)CY592$235.56$220.00
40Aggregate base (304E20000)CY563$106.18$100.00
41Non-tracking tack coat (407E20000)GAL34,369$4.00$3.50
42Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000)CY16,559$264.79$252.00
43Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100)CY219$498.49$252.00
44Compacted aggregate (617E10100)CY662$189.69$88.00
45Shoulder preparation (617E20000)SY23,043$3.07$2.00
46Water (617E25000)MGAL8$100.00$10.00
47Valve box adjusted to grade (638E10800)EACH4$694.81$500.00
48RPM (621E00100)EACH1,733$38.00$46.47
49Raised pavement marker removed (621E54000)EACH1,733$12.39$10.00
50Barrier reflector, type 1, 1-way (626E00102)EACH14$10.00$10.00
51Barrier reflector, type 2, 1-way (626E00110)EACH16$12.00$12.00
52Ground mounted support, no. 2 post (630E02100)FT420$12.00$12.00
53Ground mounted support, no. 3 post (630E03100)FT294$13.50$13.50
54Sign post reflector (630E08600)EACH42$35.00$35.00
55Sign, flat sheet (630E80100)SF200$20.00$20.00
56Removal of ground mounted sign and disposal, as per plan (630E84901)EACH5$35.00$35.00
57Removal of ground mounted sign and reerection, as per plan (630E85101)EACH6$100.00$100.00
58Parking lot stall marking, type 1 (642E01200)FT1,302$1.80$1.80
59Edge line, 6" (644E00104)MI40.12$3,193.00$3,193.00
60Lane line, 6" (644E00204)MI2.34$1,250.00$1,250.00
61Center line (644E00300)MI22.54$4,800.00$4,800.00
62Channelizing line, 8" (644E00400)FT1,667$1.75$1.75
63Channelizing line, 12" (644E00404)FT4,515$2.00$2.00
64Stop line (644E00500)FT629$7.00$7.00
65Crosswalk line, 24" (644E00630)FT1,260$7.00$7.00
66Transverse/diagonal line (644E00700)FT2,037$7.00$7.00
67Lane arrow (644E01300)EACH78$140.00$140.00
68Dotted line, 6" (644E01510)FT609$2.50$2.50
69Removal of pavement marking (644E30000)FT1,114$0.74$0.74
70Removal of pavement marking (644E30000)FT235$0.74$0.74
71Removal of pavement marking (644E30000)FT5,853$0.74$0.74
72Removal of pavement marking (644E30000)FT2,101$0.74$0.74
73Removal of pavement marking (644E30020)EACH2$101.00$101.00
74Edge line, 6" (646E10010)MI0.22$18,214$18,214
75Center line (646E10200)MI0.15$26,713$26,713
76Detector loop, as per plan (632E26501)EACH4$2,200.00$2,200.00
77Loop detector tie in (632E27200)EACH4$100.00$100.00
78Law enforcement officer with patrol car for assistance (614E11110)HR136$126.51$150.00
79Work zone marking sign, as per plan (614E12461)EACH144$110.00$110.00
80Portable changeable message sign, as per plan (614E18601)SNMT9$995.00$995.00
81Work zone lane line, class I, 6", 642 paint (614E20110)MI1.04$1,250.00$1,250.00
82Work zone lane line, class III, 6", 642 paint (614E20560)MI1.30$1,250.00$1,250.00
83Work zone center line, class I, 642 paint (614E21100)MI3.82$4,001.00$4,001.00
84Work zone center line, class III, 642 paint (614E21550)MI35.47$2,500.00$2,500.00
85Work zone edge line, class I, 6", 642 paint (614E22110)MI4.39$2,500.00$2,500.00
86Work zone edge line, class III, 6", 642 paint (614E22360)MI37.85$1,250.00$1,250.00
87Work zone channelizing line, class I, 8", 642 paint (614E23200)FT5,287$1.00$1.00
88Work zone channelizing line, class III, 8", 642 paint (614E23680)FT1,550$1.00$1.00
89Work zone dotted line, class I, 6", 642 paint (614E24202)FT1,488$1.00$1.00
90Work zone dotted line, class III, 6", 642 paint (614E24612)FT229$1.00$1.00
91Work zone stop line, class I, 642 paint (614E26200)FT550$5.00$5.00
92Work zone stop line, class III, 642 paint (614E26610)FT79$5.00$5.00
93Work zone crosswalk line, class I, 12", 642 paint (614E27050)FT1,260$2.00$2.00
94Work zone arrow, class I, 642 paint (614E30200)EACH88$30.00$30.00
95Work zone arrow, class III, 642 paint (614E30650)EACH18$30.00$30.00
96Premium for contract performance bond and for payment bond (103E05000)LS1$26,646$35,000
97Maintaining traffic (614E11000)LS1$130,246$1,250,000
98Construction layout stakes and surveying, as per plan (623E10001)LS1$23,393$75,000
99Mobilization (624E10000)LS1$375,000$750,000
100Excavation of subgrade, as per plan (204E13001)CY25$155.41$100.00
ODOT contract 260347: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy