ODOT contract 260347 bid tabulation
FAY-US 22-00.00, FAY-US 62-00.00 / VAR (FOUR LANE RESURFACING). Let by Ohio DOT on July 30, 2026, FAY. 2 bids received; low bid $7,535,868 by John R Jurgensen Company, -0.1% against the engineer's estimate of $7,545,000.
- Owner
- Ohio DOT
- Letting
- 30 JUL 2026
- Pay items
- 100
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $7,535,868 | Low | 0.0% |
| 2 | Fillmore Construction | $8,765,720 | +16% | +16% |
Engineer's estimate: $7,545,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Fillmore Construction |
|---|---|---|---|---|---|
| 1 | Pavement removed, as per plan (202E23001) | SY | 1,988 | $31.44 | $20.00 |
| 2 | Concrete median removed, as per plan (202E30601) | SY | 1,179 | $58.45 | $20.00 |
| 3 | Curb removed, as per plan (202E32001) | FT | 3,056 | $14.86 | $13.00 |
| 4 | Guardrail removed, as per plan (202E38001) | FT | 1,250 | $2.80 | $2.80 |
| 5 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 4 | $340.00 | $340.00 |
| 6 | Anchor assembly removed, barrier design (202E42210) | EACH | 2 | $500.00 | $500.00 |
| 7 | Excavation, as per plan (203E10001) | CY | 330 | $50.23 | $40.00 |
| 8 | Embankment (203E20000) | CY | 407 | $65.37 | $60.00 |
| 9 | Embankment, as per plan (203E20001) | CY | 24 | $30.00 | $30.00 |
| 10 | Subgrade compaction, as per plan (204E10001) | SY | 3,379 | $2.58 | $4.00 |
| 11 | Granular material, type E, as per plan (204E30041) | CY | 25 | $197.16 | $200.00 |
| 12 | Proof rolling (204E45000) | HR | 6.80 | $229.49 | $120.00 |
| 13 | Linear grading (209E60200) | STA | 6.40 | $552.62 | $2,500.00 |
| 14 | Guardrail, type MGS (606E15050) | FT | 151.50 | $27.00 | $27.00 |
| 15 | Guardrail, type MGS half post spacing (606E15150) | FT | 314.06 | $35.00 | $35.00 |
| 16 | Anchor assembly, MGS type B (606E26050) | EACH | 2 | $2,550.00 | $2,550.00 |
| 17 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,200.00 | $1,200.00 |
| 18 | Impact attenuator, type 2 (bidirectional), as per plan (606E60029) | EACH | 2 | $27,392 | $35,000 |
| 19 | Guardrail, misc.:post footing anchor (606E98100) | EACH | 37 | $475.00 | $475.00 |
| 20 | Concrete median, as per plan (609E71001) | SF | 105 | $97.04 | $90.00 |
| 21 | Concrete barrier, single slope, type B, as per plan (622E10061) | FT | 152 | $590.74 | $585.00 |
| 22 | Concrete barrier end section, type B, as per plan (622E24841) | EACH | 2 | $16,289 | $14,500 |
| 23 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $12,021 | $37,500 |
| 24 | Topsoil (659E00300) | CY | 366 | $70.20 | $68.00 |
| 25 | Seeding and mulching (659E10000) | SY | 3,267 | $1.45 | $1.45 |
| 26 | Repair seeding and mulching (659E14000) | SY | 163 | $1.45 | $2.20 |
| 27 | Inter-seeding (659E15000) | SY | 163 | $0.45 | $2.20 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.44 | $800.00 | $1,400.00 |
| 29 | Lime (659E31000) | ACRE | 0.68 | $0.15 | $450.00 |
| 30 | Water (659E35000) | MGAL | 18 | $0.15 | $10.00 |
| 31 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 32 | Catch basin adjusted to grade (611E98630) | EACH | 4 | $1,389.60 | $1,500.00 |
| 33 | Manhole adjusted to grade (611E99654) | EACH | 4 | $1,389.60 | $1,500.00 |
| 34 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 532 | $164.36 | $30.00 |
| 35 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 235 | $191.50 | $45.00 |
| 36 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 138 | $173.63 | $60.00 |
| 37 | Full depth pavement sawing (252E01500) | FT | 5,772 | $1.65 | $3.00 |
| 38 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 399,379 | $1.52 | $2.00 |
| 39 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 592 | $235.56 | $220.00 |
| 40 | Aggregate base (304E20000) | CY | 563 | $106.18 | $100.00 |
| 41 | Non-tracking tack coat (407E20000) | GAL | 34,369 | $4.00 | $3.50 |
| 42 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 16,559 | $264.79 | $252.00 |
| 43 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 219 | $498.49 | $252.00 |
| 44 | Compacted aggregate (617E10100) | CY | 662 | $189.69 | $88.00 |
| 45 | Shoulder preparation (617E20000) | SY | 23,043 | $3.07 | $2.00 |
| 46 | Water (617E25000) | MGAL | 8 | $100.00 | $10.00 |
| 47 | Valve box adjusted to grade (638E10800) | EACH | 4 | $694.81 | $500.00 |
| 48 | RPM (621E00100) | EACH | 1,733 | $38.00 | $46.47 |
| 49 | Raised pavement marker removed (621E54000) | EACH | 1,733 | $12.39 | $10.00 |
| 50 | Barrier reflector, type 1, 1-way (626E00102) | EACH | 14 | $10.00 | $10.00 |
| 51 | Barrier reflector, type 2, 1-way (626E00110) | EACH | 16 | $12.00 | $12.00 |
| 52 | Ground mounted support, no. 2 post (630E02100) | FT | 420 | $12.00 | $12.00 |
| 53 | Ground mounted support, no. 3 post (630E03100) | FT | 294 | $13.50 | $13.50 |
| 54 | Sign post reflector (630E08600) | EACH | 42 | $35.00 | $35.00 |
| 55 | Sign, flat sheet (630E80100) | SF | 200 | $20.00 | $20.00 |
| 56 | Removal of ground mounted sign and disposal, as per plan (630E84901) | EACH | 5 | $35.00 | $35.00 |
| 57 | Removal of ground mounted sign and reerection, as per plan (630E85101) | EACH | 6 | $100.00 | $100.00 |
| 58 | Parking lot stall marking, type 1 (642E01200) | FT | 1,302 | $1.80 | $1.80 |
| 59 | Edge line, 6" (644E00104) | MI | 40.12 | $3,193.00 | $3,193.00 |
| 60 | Lane line, 6" (644E00204) | MI | 2.34 | $1,250.00 | $1,250.00 |
| 61 | Center line (644E00300) | MI | 22.54 | $4,800.00 | $4,800.00 |
| 62 | Channelizing line, 8" (644E00400) | FT | 1,667 | $1.75 | $1.75 |
| 63 | Channelizing line, 12" (644E00404) | FT | 4,515 | $2.00 | $2.00 |
| 64 | Stop line (644E00500) | FT | 629 | $7.00 | $7.00 |
| 65 | Crosswalk line, 24" (644E00630) | FT | 1,260 | $7.00 | $7.00 |
| 66 | Transverse/diagonal line (644E00700) | FT | 2,037 | $7.00 | $7.00 |
| 67 | Lane arrow (644E01300) | EACH | 78 | $140.00 | $140.00 |
| 68 | Dotted line, 6" (644E01510) | FT | 609 | $2.50 | $2.50 |
| 69 | Removal of pavement marking (644E30000) | FT | 1,114 | $0.74 | $0.74 |
| 70 | Removal of pavement marking (644E30000) | FT | 235 | $0.74 | $0.74 |
| 71 | Removal of pavement marking (644E30000) | FT | 5,853 | $0.74 | $0.74 |
| 72 | Removal of pavement marking (644E30000) | FT | 2,101 | $0.74 | $0.74 |
| 73 | Removal of pavement marking (644E30020) | EACH | 2 | $101.00 | $101.00 |
| 74 | Edge line, 6" (646E10010) | MI | 0.22 | $18,214 | $18,214 |
| 75 | Center line (646E10200) | MI | 0.15 | $26,713 | $26,713 |
| 76 | Detector loop, as per plan (632E26501) | EACH | 4 | $2,200.00 | $2,200.00 |
| 77 | Loop detector tie in (632E27200) | EACH | 4 | $100.00 | $100.00 |
| 78 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 136 | $126.51 | $150.00 |
| 79 | Work zone marking sign, as per plan (614E12461) | EACH | 144 | $110.00 | $110.00 |
| 80 | Portable changeable message sign, as per plan (614E18601) | SNMT | 9 | $995.00 | $995.00 |
| 81 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 1.04 | $1,250.00 | $1,250.00 |
| 82 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 1.30 | $1,250.00 | $1,250.00 |
| 83 | Work zone center line, class I, 642 paint (614E21100) | MI | 3.82 | $4,001.00 | $4,001.00 |
| 84 | Work zone center line, class III, 642 paint (614E21550) | MI | 35.47 | $2,500.00 | $2,500.00 |
| 85 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 4.39 | $2,500.00 | $2,500.00 |
| 86 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 37.85 | $1,250.00 | $1,250.00 |
| 87 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 5,287 | $1.00 | $1.00 |
| 88 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,550 | $1.00 | $1.00 |
| 89 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 1,488 | $1.00 | $1.00 |
| 90 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 229 | $1.00 | $1.00 |
| 91 | Work zone stop line, class I, 642 paint (614E26200) | FT | 550 | $5.00 | $5.00 |
| 92 | Work zone stop line, class III, 642 paint (614E26610) | FT | 79 | $5.00 | $5.00 |
| 93 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 1,260 | $2.00 | $2.00 |
| 94 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 88 | $30.00 | $30.00 |
| 95 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 18 | $30.00 | $30.00 |
| 96 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $26,646 | $35,000 |
| 97 | Maintaining traffic (614E11000) | LS | 1 | $130,246 | $1,250,000 |
| 98 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $23,393 | $75,000 |
| 99 | Mobilization (624E10000) | LS | 1 | $375,000 | $750,000 |
| 100 | Excavation of subgrade, as per plan (204E13001) | CY | 25 | $155.41 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.