ODOT contract 260046 bid tabulation
CHP-SR 55-15.02 (TWO LANE RESURFACING). Let by Ohio DOT on January 29, 2026, CHP. 3 bids received; low bid $461,961 by A & B Asphalt Corporation, -13% against the engineer's estimate of $534,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 34
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A & B Asphalt Corporation | $461,961 | Low | -13% |
| 2 | Barrett Paving Materials Inc | $474,400 | +3.0% | -11% |
| 3 | Shelly Company | $475,658 | +3.0% | -11% |
Engineer's estimate: $534,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A & B Asphalt Corporation | 2. Barrett Paving Materials Inc | 3. Shelly Company |
|---|---|---|---|---|---|---|
| 1 | Monument assembly adjusted to grade (623E39500) | EACH | 3 | $1,000.00 | $800.00 | $825.00 |
| 2 | Manhole adjusted to grade (611E99654) | EACH | 2 | $1,000.00 | $1,700.00 | $1,300.00 |
| 3 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 500 | $63.15 | $78.00 | $115.00 |
| 4 | Pavement planing, asphalt concrete, 1 1/2" depth (254E01000) | SY | 27,433 | $2.05 | $2.10 | $1.50 |
| 5 | Patching planed surface, as per plan (254E01601) | SY | 300 | $5.00 | $5.00 | $12.00 |
| 6 | Non-tracking tack coat (407E20000) | GAL | 2,332 | $3.00 | $2.00 | $3.00 |
| 7 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 1,143 | $225.06 | $240.00 | $230.00 |
| 8 | Compacted aggregate (617E10100) | CY | 94 | $100.00 | $160.00 | $130.00 |
| 9 | Valve box adjusted to grade (638E10800) | EACH | 4 | $100.00 | $500.00 | $825.00 |
| 10 | RPM (621E00100) | EACH | 50 | $94.40 | $94.40 | $115.00 |
| 11 | Raised pavement marker removed (621E54000) | EACH | 50 | $18.46 | $15.00 | $4.00 |
| 12 | Edge line, 4" (644E00100) | MI | 2.50 | $3,150.00 | $3,150.00 | $3,200.00 |
| 13 | Edge line, 6" (644E00104) | MI | 0.40 | $3,922.00 | $3,922.00 | $3,500.00 |
| 14 | Center line (644E00300) | MI | 1.62 | $5,825.00 | $5,825.00 | $3,985.00 |
| 15 | Channelizing line, 8" (644E00400) | FT | 192 | $2.50 | $2.50 | $2.00 |
| 16 | Stop line (644E00500) | FT | 52 | $10.00 | $10.00 | $7.00 |
| 17 | Crosswalk line, 12" (644E00620) | FT | 64 | $5.00 | $5.00 | $4.00 |
| 18 | Crosswalk line, 24" (644E00630) | FT | 60 | $10.00 | $10.00 | $7.00 |
| 19 | Lane arrow (644E01300) | EACH | 2 | $250.00 | $250.00 | $125.00 |
| 20 | Lane arrow (644E01300) | EACH | 2 | $250.00 | $250.00 | $125.00 |
| 21 | Yield line (644E20800) | FT | 15 | $50.00 | $50.00 | $5.00 |
| 22 | Detector loop, as per plan (632E26501) | EACH | 2 | $1,200.00 | $1,455.00 | $1,455.00 |
| 23 | Loop detector tie in, as per plan (632E27201) | EACH | 2 | $150.00 | $175.00 | $175.00 |
| 24 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 20 | $75.00 | $80.00 | $90.00 |
| 25 | Work zone center line, class I, 642 paint (614E21100) | MI | 3.24 | $2,186.00 | $2,186.00 | $980.00 |
| 26 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 5 | $900.00 | $900.00 | $660.00 |
| 27 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.80 | $1,114.00 | $1,114.00 | $700.00 |
| 28 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 384 | $1.00 | $1.00 | $0.55 |
| 29 | Work zone stop line, class I, 642 paint (614E26200) | FT | 104 | $5.00 | $5.00 | $4.00 |
| 30 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 4 | $30.00 | $30.00 | $50.00 |
| 31 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 4 | $30.00 | $30.00 | $50.00 |
| 32 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $1,400.00 | $1,968.56 | $3,500.00 |
| 33 | Maintaining traffic (614E11000) | LS | 1 | $22,136 | $16,000 | $25,000 |
| 34 | Mobilization (624E10000) | LS | 1 | $24,062 | $10,000 | $17,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.