Belgray, Inc: ODOT bid record
Belgray, Inc submitted 14 bids on Ohio DOT contracts in the data, from 18 JUN 2020 to 19 FEB 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $0
- Latest bid
- 19 FEB 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2022 | 4 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CLI | 4 | 0 | 0% |
| MOT | 3 | 0 | 0% |
| BUT | 2 | 0 | 0% |
| MER | 1 | 0 | 0% |
| CLE | 1 | 0 | 0% |
| VAN | 1 | 0 | 0% |
| WAR | 1 | 0 | 0% |
| HAM | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 13 | 13 (100%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 12 | 3 (25%) | $750.00 | $850.00 |
| Edge line, 6", type 1 | 642E00104 | MI | 8 | 3 (38%) | $22,389 | $3,200.00 |
| Removal of ground mounted sign and reerection | 630E85100 | EACH | 8 | 3 (38%) | $89.00 | $75.00 |
| Sign, flat sheet | 630E80100 | SF | 7 | 3 (43%) | $25.00 | $24.00 |
| Center line, type 1 | 642E00300 | MI | 7 | 3 (43%) | $32,100 | $5,500.00 |
| Non-tracking tack coat | 407E20000 | GAL | 10 | 2 (20%) | $10.00 | $3.25 |
| Type 2 waterproofing | 512E33000 | SY | 9 | 2 (22%) | $25.00 | $30.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 8 | 2 (25%) | $16.50 | $15.20 |
| Asphalt concrete surface course, type 1, (448), PG64-22 | 441E50000 | CY | 8 | 2 (25%) | $527.50 | $300.00 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 8 | 2 (25%) | $2.25 | $1.75 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 7 | 2 (29%) | $30.00 | $23.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Axis Civil Construction LLC | 9 | 9 of 9 |
| Rack & Ballauer Excavating Co Inc | 5 | 5 of 5 |
| Sunesis Construction Co | 5 | 3 of 5 |
| Eclipse Co LLC | 5 | 4 of 5 |
| Fillmore Construction | 3 | 2 of 3 |
| L J Deweese Co Inc | 3 | 2 of 3 |
| Complete General Construction Company | 2 | 2 of 2 |
| John R Jurgensen Company | 2 | 0 of 2 |
| Prus Construction Company | 2 | 1 of 2 |
| BCC Ohio Inc | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 FEB 2026 | 260089 | MOT | MOT-GMR Trail IMP CR22A (BIKEWAYS) | 4 of 4 | $393,232 | +22% |
| 22 FEB 2024 | 240089 | HAM | HAM-Sharonville SRTS 2021 (MISCELLANEOUS) | 4 of 4 | $608,632 | +63% |
| 11 JAN 2024 | 244000 | CLI | CLI-SR 73-01.80/20.74, CLI-SR 350-15.78 (CULVERT REPLACEMENT) | 4 of 4 | $1,484,732 | +30% |
| 11 MAY 2023 | 230296 | MOT | MOT-Trotwood SRTS-Infras-FY23 (SIDEWALK) | 2 of 3 | $92,320 | +8.0% |
| 31 MAR 2022 | 220202 | CLI | CLI-Blanchester SRTS FY 22 (SIDEWALK) | 2 of 2 | $176,732 | +32% |
| 13 JAN 2022 | 220020 | MOT | MOT-Brookville SRTS IFS 1 (MISCELLANEOUS) | 2 of 7 | $312,320 | +6.0% |
| 13 JAN 2022 | 224000 | VAN | VAN-SR 116-02.16/11.67 (CULVERT REPLACEMENT) | 3 of 3 | $720,320 | +13% |
| 13 JAN 2022 | 224001 | WAR | WAR-SR 122-06.33 (CULVERT REPLACEMENT) | 3 of 4 | $392,432 | +40% |
| 02 DEC 2021 | 210628 | CLI | CLI-Culverts FY22 (MISCELLANEOUS) | 3 of 6 | $261,402 | +47% |
| 18 NOV 2021 | 214017 | BUT | BUT-Culverts FY22 (CULVERT REPLACEMENT) | 5 of 5 | $477,732 | +76% |
| 28 OCT 2021 | 210568 | CLI | CLI-SR 28/SR 124-04.52/05.47/00.54 (CULVERT REPLACEMENT) | 6 of 8 | $838,320 | +12% |
| 30 SEP 2021 | 210505 | CLE | CLE-/WAR-SR 132/SR 123-21.21/01.51 (CULVERT REPLACEMENT) | 6 of 10 | $777,320 | +16% |
| 14 JAN 2021 | 214000 | MER | MER-SR 219-12.10 (CULVERT REPLACEMENT) | 4 of 4 | $326,343 | +20% |
| 18 JUN 2020 | 200344 | BUT | BUT-SR 4-17.90 (MISCELLANEOUS) | 4 of 4 | $447,214 | +211% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.