ODOT contract 260380 bid tabulation
CLA-US 40-14.14 (TWO LANE RESURFACING). Let by Ohio DOT on August 27, 2026, CLA. 2 bids received; low bid $1,116,903 by A & B Asphalt Corporation, +1.8% against the engineer's estimate of $1,097,000.
- Owner
- Ohio DOT
- Letting
- 27 AUG 2026
- Pay items
- 47
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A & B Asphalt Corporation | $1,116,903 | Low | +2.0% |
| 2 | Barrett Paving Materials Inc | $1,364,252 | +22% | +24% |
Engineer's estimate: $1,097,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A & B Asphalt Corporation | 2. Barrett Paving Materials Inc |
|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 850 | $27.07 | $21.00 |
| 2 | Curb removed (202E32000) | FT | 470 | $26.12 | $13.00 |
| 3 | Excavation (203E10000) | CY | 152 | $93.83 | $58.00 |
| 4 | Subgrade compaction (204E10000) | SY | 903 | $6.67 | $2.45 |
| 5 | Seeding and mulching, class 1 (659E00500) | SY | 55 | $5.00 | $20.00 |
| 6 | 4" shallow pipe underdrains (605E05100) | FT | 215 | $30.05 | $45.00 |
| 7 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 20 | $24.69 | $100.00 |
| 8 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 45 | $1,406.00 | $1,700.00 |
| 9 | Manhole, misc.: manhole casting furnished (611E99690) | EACH | 45 | $597.23 | $500.00 |
| 10 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 1,000 | $72.26 | $95.00 |
| 11 | Pavement planing, asphalt concrete, 1 3/4" depth (254E01000) | SY | 32,326 | $1.95 | $4.40 |
| 12 | Patching planed surface, as per plan (254E01601) | SY | 100 | $27.80 | $13.00 |
| 13 | Aggregate base (304E20000) | CY | 152 | $138.91 | $130.00 |
| 14 | Non-tracking tack coat (407E20000) | GAL | 2,757 | $4.97 | $4.50 |
| 15 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 1,581 | $296.72 | $370.00 |
| 16 | 9" reinforced concrete pavement, class QC 1P (451E14010) | SY | 850 | $121.43 | $127.00 |
| 17 | Curb, type 2-A (609E14000) | FT | 235 | $65.00 | $12.00 |
| 18 | Curb, type 4-A (609E24000) | FT | 235 | $65.00 | $12.00 |
| 19 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 33 | $850.00 | $900.00 |
| 20 | Water work, misc.: valve box casting furnished (638E98000) | EACH | 33 | $222.18 | $325.00 |
| 21 | Lane line, 4", type 1 (642E00200) | MI | 2.25 | $785.00 | $785.00 |
| 22 | Center line, type 1 (642E00300) | MI | 1.49 | $1,555.00 | $1,555.00 |
| 23 | Channelizing line, 8" (644E00400) | FT | 550 | $3.10 | $3.10 |
| 24 | Stop line (644E00500) | FT | 351 | $7.20 | $7.20 |
| 25 | Crosswalk line, 12" (644E00620) | FT | 1,367 | $3.55 | $3.55 |
| 26 | Transverse/diagonal line (644E00700) | FT | 332 | $7.15 | $7.15 |
| 27 | Lane arrow (644E01300) | EACH | 51 | $127.73 | $127.73 |
| 28 | Word on pavement, 72" (644E01400) | EACH | 5 | $255.43 | $255.43 |
| 29 | Lane line, 4" (646E10100) | MI | 0.04 | $11,331 | $11,331 |
| 30 | Channelizing line, 8" (646E10300) | FT | 50 | $41.83 | $41.83 |
| 31 | Lane arrow (646E20300) | EACH | 1 | $1,000.00 | $1,000.00 |
| 32 | Word on pavement, 72" (646E20400) | EACH | 1 | $1,091.88 | $1,091.88 |
| 33 | Loop detector unit, as per plan (632E27005) | EACH | 3 | $1,600.00 | $1,445.00 |
| 34 | Loop detector tie in, as per plan (632E27201) | EACH | 3 | $100.00 | $185.00 |
| 35 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $75.00 | $100.00 |
| 36 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 4.54 | $595.00 | $595.00 |
| 37 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.98 | $1,786.00 | $1,786.00 |
| 38 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,150 | $0.55 | $0.55 |
| 39 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 332 | $3.35 | $3.35 |
| 40 | Work zone stop line, class III, 642 paint (614E26610) | FT | 702 | $3.75 | $3.75 |
| 41 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 1,367 | $1.85 | $1.85 |
| 42 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 103 | $37.00 | $37.00 |
| 43 | Work zone word on pavement, 72", class III, 642 paint (614E31620) | EACH | 11 | $52.00 | $52.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,914.44 | $3,000.00 |
| 45 | Maintaining traffic (614E11000) | LS | 1 | $54,472 | $55,000 |
| 46 | Detour signing (614E12420) | LS | 1 | $5,690.00 | $5,690.00 |
| 47 | Mobilization (624E10000) | LS | 1 | $32,594 | $86,940 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 27, 2026. Compiled by Mirage Metrics.