ODOT contract 250105 bid tabulation

WAY-SR 94/US 30A-06.70/00.00 (TWO LANE RESURFACING). Let by Ohio DOT on February 13, 2025, WAY. 3 bids received; low bid $1,453,493 by Kokosing Construction Company Inc, -4.6% against the engineer's estimate of $1,524,000.

Owner
Ohio DOT
Letting
13 FEB 2025
Pay items
54
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Kokosing Construction Company Inc$1,453,493Low-5.0%
2Karvo Companies Inc$1,453,5180.0%-5.0%
3Barbicas Construction Company Inc$1,454,5410.0%-5.0%
ODOT contract 250105: bids by rank

Engineer's estimate: $1,524,000.

Bid tabulation

LinePay itemUnitQuantity1. Kokosing Construction Company Inc2. Karvo Companies Inc3. Barbicas Construction Company Inc
1Pavement removed (202E23000)SY39$27.00$67.00$100.00
2Walk removed (202E30000)SF3,709$3.00$1.00$3.00
3Curb removed (202E32000)FT360$8.00$14.25$20.00
4Curb and gutter removed (202E32500)FT72$10.00$32.00$24.00
5Mailbox removed (202E53100)EACH6$50.00$75.00$35.00
6Linear grading (209E60200)STA5.41$62.00$1,100.00$300.00
7Grading mailbox approaches (209E80000)EACH52$20.00$70.00$70.00
84" concrete walk (608E10000)SF1,603$7.38$5.25$11.00
9Curb ramp (608E52000)SF2,750$18.44$13.45$16.00
10Combination curb and gutter, type 2 (609E12000)FT31$31.00$82.00$70.00
11Curb, type 6 (609E26000)FT252$24.00$26.00$38.00
12Monument assembly adjusted to grade, as per plan (623E39501)EACH1$2,000.00$1,200.00$615.00
13Post construction survey monument verification and report (623E51000)LS1$2,500.00$1,040.00$1,440.00
14Special - mailbox support system, double (690E50200)EACH3$400.00$300.00$300.00
15Topsoil, as per plan (659E00301)CY6$160.83$250.00$200.00
16Erosion control (832E30000)EACH3,000$1.00$1.00$1.00
17Catch basin adjusted to grade (611E98630)EACH43$750.00$1,300.00$700.00
18Manhole adjusted to grade (611E99654)EACH19$600.00$1,075.00$550.00
19Partial depth pavement repair (asphalt concrete base) (251E01042)CY120$500.00$470.00$350.00
20Pavement repair (253E02000)CY13$700.00$470.00$400.00
21Pavement planing, asphalt concrete (1.5") (254E01000)SY37,183$2.00$2.10$3.00
22Pavement planing, asphalt concrete (3.0") (254E01000)SY18,922$2.55$3.25$4.00
23Patching planed surface (254E01600)SY2,805$1.25$0.75$2.31
24Aggregate base, as per plan (304E20001)CY1$70.00$155.00$200.00
25Non-tracking tack coat (407E20000)GAL5,455$2.75$2.75$3.20
26Prime coat, as per plan (408E10001)GAL2,424$4.75$5.45$5.20
27Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201)CY671$235.00$240.00$185.00
28Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201)CY1,566$235.00$233.00$185.00
29Asphalt concrete intermediate course, 12.5 MM, type A (448), as per plan (442E20171)CY940$200.00$221.00$235.00
30Compacted aggregate (617E10100)CY389$30.00$72.00$80.00
31Shoulder preparation (617E20000)SY6,060$0.25$1.15$0.50
32Valve box adjusted to grade (638E10800)EACH39$400.00$500.00$400.00
33RPM (621E00100)EACH90$43.00$43.00$65.00
34Raised pavement marker removed (621E54000)EACH56$15.00$10.00$5.00
35Removal of ground mounted sign and reerection (630E85100)EACH4$60.00$60.00$60.00
36Removal of ground mounted post support and reerection (630E86010)EACH4$60.00$60.00$60.00
37Edge line, 6", type 1 (642E00104)MI4.85$700.00$700.00$700.00
38Center line, type 1 (642E00300)MI3.50$975.00$975.00$975.00
39Stop line, type 1 (642E00500)FT533$3.50$3.50$3.50
40Crosswalk line, 12", type 1 (642E00620)FT1,440$3.00$3.00$3.00
41School symbol marking, 96", type 1 (642E01110)EACH2$350.00$350.00$350.00
42Parking lot stall marking, type 1 (642E01200)FT1,135$1.30$1.30$2.00
43Stop line (644E00500)FT88$12.00$12.00$12.00
44Law enforcement officer with patrol car for assistance (614E11110)HR100$125.00$90.00$80.00
45Work zone marking sign (614E12460)EACH64$60.00$55.00$55.00
46Asphalt concrete for maintaining traffic (614E13000)CY25$100.00$300.00$300.00
47Work zone center line, class III, 642 paint (614E21550)MI8.28$950.00$950.00$950.00
48Work zone stop line, class III, 642 paint (614E26610)FT588$1.00$3.50$3.50
49Work zone crosswalk line, class III, 12", 642 paint (614E27250)FT1,376$1.00$2.75$2.75
50Premium for contract performance bond and for payment bond (103E05000)LS1$7,000.00$6,500.00$15,000
51Maintaining traffic (614E11000)LS1$203,030$85,000$222,000
52Field office, type B (619E16010)MNTH6$2,295.00$1,750.00$800.00
53Construction layout stakes and surveying (623E10000)LS1$3,000.00$1,700.00$200.00
54Mobilization (624E10000)LS1$72,000$112,000$50,000
ODOT contract 250105: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy