ODOT contract 250433 bid tabulation
COL-SR 39/SR 45-13.06/00.37 (TWO LANE RESURFACING). Let by Ohio DOT on September 25, 2025, COL. 4 bids received; low bid $1,348,480 by NLS Paving, Inc, +0.6% against the engineer's estimate of $1,341,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 45
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | NLS Paving, Inc | $1,348,480 | Low | +1.0% |
| 2 | Shelly Company | $1,390,170 | +3.0% | +4.0% |
| 3 | Karvo Companies Inc | $1,395,888 | +4.0% | +4.0% |
| 4 | Barbicas Construction Company Inc | $1,553,148 | +15% | +16% |
Engineer's estimate: $1,341,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. NLS Paving, Inc | 2. Shelly Company | 3. Karvo Companies Inc | 4. Barbicas Construction Company Inc |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 929 | $15.00 | $7.65 | $4.00 | $7.00 |
| 2 | Walk removed (202E30000) | SF | 164 | $25.00 | $12.00 | $25.00 | $25.00 |
| 3 | Fence, misc.: temporarty orange plastic constructi (607E98000) | FT | 138 | $5.00 | $15.00 | $5.00 | $6.50 |
| 4 | 4" concrete walk (608E10000) | SF | 16 | $110.00 | $95.00 | $75.00 | $40.00 |
| 5 | Detectable warning, as per plan (608E53021) | SF | 164 | $45.00 | $80.00 | $25.00 | $80.00 |
| 6 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 11 | $2,300.00 | $2,000.00 | $1,700.00 | $1,200.00 |
| 7 | Special - mailbox support system, single (690E50100) | EACH | 3 | $400.00 | $350.00 | $500.00 | $250.00 |
| 8 | Special - mailbox support system, double (690E50200) | EACH | 8 | $400.00 | $450.00 | $750.00 | $300.00 |
| 9 | Seeding, misc.: curb ramp grading (659E98000) | SY | 9 | $50.00 | $125.00 | $10.00 | $100.00 |
| 10 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 11 | Aggregate drains (605E31100) | FT | 100 | $12.00 | $5.00 | $25.00 | $20.00 |
| 12 | Catch basin reconstructed to grade (611E98634) | EACH | 1 | $5,850.00 | $3,500.00 | $2,500.00 | $1,500.00 |
| 13 | Partial depth pavement repair (asphalt concrete base) (251E01042) | CY | 40 | $590.00 | $975.00 | $800.00 | $300.00 |
| 14 | Pavement repair (253E02000) | CY | 100 | $600.00 | $600.00 | $700.00 | $300.00 |
| 15 | Pavement planing, asphalt concrete, as per plan (2 (254E01001) | SY | 19,464 | $3.00 | $3.25 | $5.00 | $7.00 |
| 16 | Non-tracking tack coat (407E20000) | GAL | 2,661 | $3.25 | $3.00 | $2.45 | $4.00 |
| 17 | Prime coat, as per plan (408E10001) | GAL | 690 | $4.50 | $6.00 | $8.00 | $6.50 |
| 18 | Aggregate, single chip seal, type A, as per plan (422E11001) | SY | 122,214 | $1.50 | $1.60 | $1.50 | $1.50 |
| 19 | Emulsion, chip seal (422E25000) | GAL | 45,218 | $3.55 | $3.15 | $3.00 | $3.55 |
| 20 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 667 | $250.00 | $265.00 | $260.00 | $350.00 |
| 21 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 536 | $230.00 | $240.00 | $234.00 | $350.00 |
| 22 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 31 | $600.00 | $500.00 | $381.00 | $400.00 |
| 23 | Compacted aggregate, as per plan (617E10101) | CY | 108 | $130.00 | $100.00 | $125.00 | $150.00 |
| 24 | Shoulder preparation, as per plan (617E20001) | SY | 1,724 | $0.50 | $1.50 | $5.00 | $5.00 |
| 25 | Fog seal (886E11000) | GAL | 18,332 | $3.55 | $3.15 | $3.00 | $3.55 |
| 26 | RPM (621E00100) | EACH | 1,228 | $37.00 | $37.00 | $34.00 | $34.50 |
| 27 | Raised pavement marker removed (621E54000) | EACH | 1,228 | $25.00 | $15.00 | $10.05 | $12.00 |
| 28 | Edge line, 6", type 1 (642E00104) | MI | 16.06 | $917.00 | $725.00 | $900.00 | $725.00 |
| 29 | Center line, type 1 (642E00300) | MI | 8.03 | $1,040.00 | $995.00 | $1,050.00 | $995.00 |
| 30 | Stop line, type 1 (642E00500) | FT | 17 | $15.00 | $5.00 | $9.00 | $5.00 |
| 31 | Removal of pavement marking (642E30030) | MI | 24.09 | $1,299.00 | $1,100.00 | $1,190.00 | $1,100.00 |
| 32 | Edge line, 6" (646E10010) | MI | 2.16 | $3,333.00 | $3,575.00 | $2,340.00 | $3,500.00 |
| 33 | Center line (646E10200) | MI | 1.16 | $3,999.00 | $3,985.00 | $4,100.00 | $4,000.00 |
| 34 | Channelizing line, 8" (646E10300) | FT | 205 | $1.95 | $2.50 | $2.00 | $2.50 |
| 35 | Stop line (646E10400) | FT | 58 | $15.00 | $12.75 | $12.00 | $12.75 |
| 36 | Lane arrow (646E20300) | EACH | 4 | $170.00 | $175.00 | $160.00 | $175.00 |
| 37 | Work zone marking sign (614E12460) | EACH | 57 | $82.00 | $70.00 | $111.29 | $70.00 |
| 38 | Work zone center line, class II, 642 paint (614E21500) | MI | 27.57 | $500.00 | $600.00 | $725.24 | $500.00 |
| 39 | Work zone center line, class III, 642 paint (614E21550) | MI | 27.57 | $895.00 | $1,150.00 | $900.00 | $1,150.00 |
| 40 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 205 | $4.00 | $0.50 | $2.00 | $0.50 |
| 41 | Work zone stop line, class III, 642 paint (614E26610) | FT | 171 | $10.00 | $3.00 | $4.50 | $3.00 |
| 42 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,000.00 | $7,500.00 | $18,000 | $20,000 |
| 43 | Maintaining traffic (614E11000) | LS | 1 | $125,000 | $192,500 | $105,000 | $150,000 |
| 44 | Field office, type B (619E16010) | MNTH | 4 | $2,500.00 | $2,500.00 | $3,500.00 | $2,000.00 |
| 45 | Mobilization (624E10000) | LS | 1 | $65,000 | $40,000 | $125,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.