ODOT contract 254019 bid tabulation

STA-SR 44-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on June 26, 2025, STA. 1 bid received; low bid $2,507,740 by Barbicas Construction Company Inc, +23% against the engineer's estimate of $2,040,000.

Owner
Ohio DOT
Letting
26 JUN 2025
Pay items
39
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Barbicas Construction Company Inc$2,507,740Low+23%
ODOT contract 254019: bids by rank

Engineer's estimate: $2,040,000.

Bid tabulation

LinePay itemUnitQuantity1. Barbicas Construction Company Inc
1Wearing course removed (202E23500)SY471$20.00
2Removal misc.: barrier reflector (202E98100)EACH18$5.00
3Excavation (203E10000)CY46$20.00
4Linear grading (209E60200)STA810$20.00
5Monument assembly adjusted to grade, as per plan (623E39501)EACH5$1,400.00
6Barrier reflector, type 2, bidirectional (626E00110)EACH85$14.00
7Special - as-built construction plans (690E91000)LS1$200.00
8Erosion control (832E30000)EACH3,000$1.00
9Partial depth pavement repair (441) (251E01000)SY1,250$25.00
10Partial depth pavement repair (441) (251E01000)SY250$50.00
11Pavement repair (253E01000)SY275$90.00
12Pavement planing, asphalt concrete. (254E01000)SY122,257$4.65
13Aggregate base (304E20000)CY46$60.00
14Non-tracking tack coat (407E20000)GAL11,046$3.00
15Prime coat, as per plan (408E10001)GAL7,331$5.00
16Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100)CY5,110$215.00
17Compacted aggregate, as per plan (617E10101)CY510$80.00
18Rumble stripes, center line (asphalt concrete) (618E43000)MI8$1,500.00
19Longitudinal joint preparation (874E21000)MI8$4,000.00
20RPM (621E00100)EACH999$36.50
21Raised pavement marker removed (621E54000)EACH808$6.00
22Edge line, 6" (646E10010)MI15.62$2,800.00
23Center line (646E10200)MI7.81$4,000.00
24Stop line (646E10400)FT50$11.50
25Railroad symbol marking (646E20000)EACH2$450.00
26Work zone marking sign (614E12460)EACH18$65.00
27Asphalt concrete for maintaining traffic (614E13000)CY10$200.00
28Portable changeable message sign, as per plan (614E18601)SNMT2$900.00
29Work zone center line, class I (614E21000)MI7.81$975.00
30Work zone center line, class III, 642 paint (614E21550)MI7.81$975.00
31Work zone edge line, class III, 6", 642 paint (614E22360)MI15.62$500.00
32Work zone stop line, class I (614E26000)FT50$3.50
33Work zone stop line, class III, 642 paint (614E26610)FT50$3.50
34Premium on railroads' protective public liability and property damage liability insurance (100E00300)LS1$8,000.00
35Premium for contract performance bond and for payment bond (103E05000)LS1$40,000
36Maintaining traffic (614E11000)LS1$250,000
37Field office, type B (619E16010)MNTH6$1,100.00
38Construction layout stakes and surveying (623E10000)LS1$1,000.00
39Mobilization (624E10000)LS1$125,000
ODOT contract 254019: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy