ODOT contract 250320 bid tabulation
LAK-SR 84-01.00 (TWO LANE RESURFACING). Let by Ohio DOT on June 26, 2025, LAK. 4 bids received; low bid $2,495,176 by Phillips Paving LLC, +12% against the engineer's estimate of $2,237,000.
- Owner
- Ohio DOT
- Letting
- 26 JUN 2025
- Pay items
- 61
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Phillips Paving LLC | $2,495,176 | Low | +12% |
| 2 | Barbicas Construction Company Inc | $2,562,828 | +3.0% | +15% |
| 3 | Karvo Companies Inc | $2,707,000 | +8.0% | +21% |
| 4 | Shelly Company | $2,830,745 | +13% | +27% |
Engineer's estimate: $2,237,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Phillips Paving LLC | 2. Barbicas Construction Company Inc | 3. Karvo Companies Inc | 4. Shelly Company |
|---|---|---|---|---|---|---|---|
| 1 | Walk removed, as per plan (202E30001) | SF | 4,912 | $5.00 | $4.00 | $8.00 | $8.00 |
| 2 | Curb removed, as per plan (202E32001) | FT | 719 | $10.00 | $5.00 | $35.00 | $35.00 |
| 3 | Excavation, as per plan (203E10001) | CY | 105 | $50.00 | $20.00 | $25.00 | $25.00 |
| 4 | Subgrade compaction (204E10000) | SY | 50 | $10.00 | $2.00 | $5.00 | $5.00 |
| 5 | Geotextile fabric, as per plan (204E50001) | SY | 450 | $5.00 | $4.00 | $2.00 | $2.00 |
| 6 | 4" concrete walk (608E10000) | SF | 965 | $20.00 | $11.00 | $18.00 | $18.00 |
| 7 | Curb ramp (608E52000) | SF | 3,789 | $30.00 | $23.00 | $18.25 | $18.25 |
| 8 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 21 | $750.00 | $1,450.00 | $1,250.00 | $1,250.00 |
| 9 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 2 | $1,500.00 | $1,900.00 | $1,500.00 | $1,500.00 |
| 10 | Calcium chloride (616E20000) | TON | 4 | $125.00 | $898.62 | $25.00 | $500.00 |
| 11 | Topsoil (659E00300) | CY | 8 | $250.00 | $95.00 | $75.00 | $250.00 |
| 12 | Seeding and mulching, class 1 (659E00500) | SY | 90 | $50.00 | $30.00 | $2.00 | $25.50 |
| 13 | Erosion control, as per plan (832E30001) | EACH | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | 6" unclassified pipe underdrains with geotextile fabric, as per plan (605E13411) | FT | 200 | $25.00 | $25.00 | $8.00 | $8.00 |
| 15 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 120 | $1,250.00 | $1,000.00 | $2,000.00 | $2,000.00 |
| 16 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 5 | $2,000.00 | $2,100.00 | $2,500.00 | $2,500.00 |
| 17 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 21 | $1,250.00 | $1,300.00 | $1,500.00 | $1,500.00 |
| 18 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 5 | $1,750.00 | $2,100.00 | $2,500.00 | $2,500.00 |
| 19 | Special - miscellaneous metal (611E99820) | LB | 15,000 | $3.00 | $2.50 | $5.00 | $5.00 |
| 20 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 600 | $70.00 | $30.00 | $60.00 | $70.00 |
| 21 | Pavement planing, asphalt concrete, as per plan, T (254E01001) | SY | 43,495 | $4.00 | $5.00 | $5.75 | $3.15 |
| 22 | Patching planed surface (254E01600) | SY | 700 | $15.00 | $5.22 | $0.50 | $1.00 |
| 23 | Full depth pavement removal and rigid replacement, type 1, class QC MS, as per plan (255E15001) | SY | 900 | $250.00 | $190.00 | $175.00 | $175.00 |
| 24 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 9 | $250.00 | $500.00 | $575.00 | $800.00 |
| 25 | Aggregate base, as per plan (304E20001) | CY | 88 | $100.00 | $100.00 | $25.00 | $25.00 |
| 26 | Non-tracking tack coat (407E20000) | GAL | 6,550 | $2.00 | $2.90 | $2.40 | $2.50 |
| 27 | Asphalt concrete surface course, type 1, (448), as per plan (441E50101) | CY | 1,816 | $220.00 | $336.00 | $240.00 | $250.00 |
| 28 | Asphalt concrete intermediate course, type 1, (448), as per plan (441E50201) | CY | 1,816 | $200.00 | $246.00 | $200.00 | $215.00 |
| 29 | Curb, type 6, as per plan (609E26001) | FT | 360 | $50.00 | $43.00 | $45.00 | $45.00 |
| 30 | Special - pavement reinforcing fabric (690E12030) | SY | 43,545 | $4.95 | $4.75 | $4.95 | $4.95 |
| 31 | Void reducing asphalt membrane (vram) (872E10000) | FT | 13,753 | $3.00 | $2.25 | $2.10 | $2.10 |
| 32 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 1 | $1,000.00 | $1,900.00 | $1,500.00 | $1,500.00 |
| 33 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 42 | $750.00 | $400.00 | $1,000.00 | $1,000.00 |
| 34 | Service box adjusted to grade, as per plan (638E10901) | EACH | 5 | $750.00 | $300.00 | $750.00 | $750.00 |
| 35 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 9 | $1,000.00 | $1,900.00 | $1,500.00 | $1,500.00 |
| 36 | Ground mounted support, no. 3 post (630E03100) | FT | 30 | $41.24 | $15.00 | $41.24 | $15.00 |
| 37 | Sign, flat sheet (630E80100) | SF | 8 | $44.90 | $30.00 | $44.90 | $30.00 |
| 38 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $16.55 | $100.00 | $16.55 | $100.00 |
| 39 | Center line (644E00300) | MI | 2.89 | $5,340.00 | $5,200.00 | $5,340.00 | $5,340.00 |
| 40 | Channelizing line, 8" (644E00400) | FT | 586 | $1.00 | $2.00 | $1.00 | $1.00 |
| 41 | Stop line (644E00500) | FT | 575 | $4.50 | $7.50 | $4.50 | $4.50 |
| 42 | Crosswalk line, 12" (644E00620) | FT | 2,559 | $3.55 | $5.85 | $3.55 | $3.55 |
| 43 | Transverse/diagonal line (644E00700) | FT | 462 | $4.30 | $6.50 | $4.30 | $4.30 |
| 44 | Lane arrow (644E01300) | EACH | 11 | $125.00 | $125.00 | $125.00 | $125.00 |
| 45 | Word on pavement, 72" (644E01400) | EACH | 4 | $150.00 | $400.00 | $150.00 | $150.00 |
| 46 | Pull box, misc.:pull box removed and replaced to G (625E31600) | EACH | 5 | $1,200.00 | $2,600.00 | $1,200.00 | $1,200.00 |
| 47 | Detector loop, as per plan (632E26501) | EACH | 24 | $1,450.00 | $2,000.00 | $1,450.00 | $1,450.00 |
| 48 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $100.00 | $80.00 | $100.00 | $120.00 |
| 49 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,039.10 | $900.00 | $1,000.00 | $1,050.00 |
| 50 | Work zone center line, class I, 642 paint (614E21100) | MI | 5.78 | $1,580.00 | $1,200.00 | $1,580.00 | $1,580.00 |
| 51 | Work zone center line, class III, 642 paint (614E21550) | MI | 2.89 | $1,175.00 | $1,200.00 | $1,175.00 | $1,175.00 |
| 52 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 1,220 | $0.55 | $0.74 | $0.55 | $0.55 |
| 53 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 610 | $0.50 | $0.70 | $0.50 | $0.50 |
| 54 | Work zone stop line, class I, 642 paint (614E26200) | FT | 1,200 | $3.50 | $3.75 | $3.50 | $3.50 |
| 55 | Work zone stop line, class III, 642 paint (614E26610) | FT | 600 | $3.40 | $3.75 | $3.40 | $3.40 |
| 56 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 22 | $70.00 | $45.00 | $70.00 | $70.00 |
| 57 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 11 | $65.00 | $45.00 | $65.00 | $65.00 |
| 58 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $50,000 | $25,000 | $23,000 | $20,000 |
| 59 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $195,000 | $140,000 | $199,490 | $465,000 |
| 60 | Construction layout stakes and surveying (623E10000) | LS | 1 | $1,000.00 | $200.00 | $5,000.00 | $25,000 |
| 61 | Mobilization (624E10000) | LS | 1 | $120,000 | $79,000 | $207,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.