Cole Burton Contractors, LLC submitted 11 bids on Ohio DOT contracts in the data, from 12 JAN 2023 to 31 OCT 2024, and was the low bidder on 5 of them (45%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $6,116,216
- Latest bid
- 31 OCT 2024
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 4 | 3 | 75% |
| 2024 | 7 | 2 | 29% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| GEA | 3 | 2 | 67% |
| LAK | 3 | 2 | 67% |
| POR | 1 | 0 | 0% |
| MED | 1 | 0 | 0% |
| CUY | 1 | 1 | 100% |
| TRU | 1 | 0 | 0% |
| ATB | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 11 | 11 (100%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 10 | 6 (60%) | $75.00 | $80.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 9 | 6 (67%) | $3.00 | $3.50 |
| Stop line | 646E10400 | FT | 7 | 5 (71%) | $12.50 | $13.00 |
| Work zone stop line, class I, 642 paint | 614E26200 | FT | 6 | 5 (83%) | $3.05 | $3.50 |
| Lane arrow | 646E20300 | EACH | 6 | 5 (83%) | $167.50 | $175.00 |
| Rumble stripes, center line (asphalt concrete) | 618E43000 | MI | 6 | 5 (83%) | $1,537.50 | $1,400.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 9 | 4 (44%) | $1,000.00 | $1,186.00 |
| Edge line, 6" | 646E10010 | MI | 6 | 4 (67%) | $3,270.00 | $10,000 |
| Transverse/diagonal line | 646E10600 | FT | 6 | 4 (67%) | $10.00 | $10.00 |
| RPM | 621E00100 | EACH | 6 | 3 (50%) | $40.25 | $52.92 |
| Work zone center line, class I, 642 paint | 614E21100 | MI | 6 | 3 (50%) | $1,195.00 | $1,485.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Karvo Companies Inc | 11 | 4 of 11 |
| Ronyak Paving Inc | 9 | 4 of 9 |
| Kokosing Construction Company Inc | 8 | 3 of 8 |
| Barbicas Construction Company Inc | 6 | 1 of 6 |
| Phillips Paving LLC | 6 | 1 of 6 |
| Shelly Company | 6 | 2 of 6 |
| Chagrin Valley Paving Inc | 2 | 0 of 2 |
| Kenmore Construction Co Inc | 1 | 0 of 1 |
| Melway Paving Co Inc | 1 | 1 of 1 |
| Shelly & Sands Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 OCT 2024 | 240483 | ATB | ATB-US 6-00.00 (TWO LANE RESURFACING) | 4 of 4 | $1,998,762 | +26% |
| 17 OCT 2024 | 240474 | TRU | TRU-SR 7/SR 7D-08.74/00.00 (TWO LANE RESURFACING) | 4 of 5 | $1,697,796 | +13% |
| 21 MAR 2024 | 240179 | LAK | LAK-US 6-00.44 (TWO LANE RESURFACING) | 2 of 6 | $1,161,800 | +2.0% |
| 22 FEB 2024 | 240137 | GEA | GEA-SR 608-00.00/05.22 (TWO LANE RESURFACING) | 2 of 6 | $719,676 | +7.0% |
| 25 JAN 2024 | 230593 | CUY | CUY-US 6-26.65 (TWO LANE RESURFACING) | 1 of 7 | $1,598,066 | Low, 2.0% under the second |
| 25 JAN 2024 | 240056 | LAK | LAK-Liberty Street (TWO LANE RESURFACING) | 1 of 6 | $969,935 | Low, 10% under the second |
| 11 JAN 2024 | 240020 | MED | MED-/WAY-SR 83/SR 585-00.91/11.98 (TWO LANE RESURFACING) | 5 of 5 | $1,696,131 | +31% |
| 14 DEC 2023 | 230602 | POR | POR-Frost Rd Ph 2 (Streetsboro) (TWO LANE RESURFACING) | 7 of 8 | $721,380 | +45% |
| 26 OCT 2023 | 230519 | GEA | GEA-SR 87-00.00 (TWO LANE RESURFACING) | 1 of 5 | $1,138,553 | Low, 7.0% under the second |
| 26 JAN 2023 | 230052 | LAK | LAK-SR 86-01.68 (FOUR LANE RESURFACING) | 1 of 5 | $1,079,980 | Low, 6.0% under the second |
| 12 JAN 2023 | 230014 | GEA | GEA-SR 87-07.70 (TWO LANE RESURFACING) | 1 of 6 | $1,329,683 | Low, 3.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.