ODOT contract 250328 bid tabulation

D03-CRSEAL FY2026 (CRACK SEALING). Let by Ohio DOT on June 26, 2025, District 3. 3 bids received; low bid $367,392 by Scodeller Construction Inc, -10% against the engineer's estimate of $409,000.

Owner
Ohio DOT
Letting
26 JUN 2025
Pay items
14
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scodeller Construction Inc$367,392Low-10%
2Bituminous Pavement Systems$521,587+42%+28%
3Strawser Construction Inc$540,597+47%+32%
ODOT contract 250328: bids by rank

Engineer's estimate: $409,000.

Bid tabulation

LinePay itemUnitQuantity1. Scodeller Construction Inc2. Bituminous Pavement Systems3. Strawser Construction Inc
1Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
2Crack sealing, type II (423E00204)SY691,962$0.32$0.41$0.42
3Edge line, 6", type 1 (642E00104)MI70.88$800.00$882.00$994.25
4Center line, type 1 (642E00300)MI40.89$750.00$734.40$800.00
5Channelizing line, 8", type 1 (642E00400)FT4,923$0.75$1.02$1.00
6Stop line, type 1 (642E00500)FT467$4.00$5.61$6.00
7Crosswalk line, 12", type 1 (642E00620)FT584$3.00$5.10$6.00
8Transverse/diagonal line, type 1 (642E00700)FT1,970$4.00$5.36$5.50
9Railroad symbol marking, type 1 (642E01000)EACH2$500.00$307.00$325.00
10School symbol marking, 96", type 1 (642E01110)EACH2$500.00$307.00$325.00
11Lane arrow, type 1 (642E01300)EACH115$60.00$102.00$115.00
12Premium for contract performance bond and for payment bond (103E05000)LS1$3,500.00$2,600.00$4,200.00
13Maintaining traffic (614E11000)LS1$16,000$48,000$60,000
14Mobilization (624E10000)LS1$14,000$59,600$45,000
ODOT contract 250328: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy