ODOT contract 250323 bid tabulation

PER-CR 22-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on June 26, 2025, PER. 1 bid received; low bid $1,392,603 by Shelly Company, -6.6% against the engineer's estimate of $1,491,000.

Owner
Ohio DOT
Letting
26 JUN 2025
Pay items
18
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$1,392,603Low-7.0%
ODOT contract 250323: bids by rank

Engineer's estimate: $1,491,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company
1Pavement planing, asphalt concrete (depth varies) (254E01000)SY4,538$4.55
2Tack coat (407E10000)GAL4,303$2.25
3Tack coat (407E10000)GAL6,881$2.25
4Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY2,989$201.25
5Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY34$201.25
6Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000)CY73$201.25
7Asphalt concrete intermediate course, type 1, (448) (441E50200)CY2,392$201.25
8Compacted aggregate (617E10100)CY800$82.50
9Special - special-hauling pavement planing materia (690E98800)TON312$22.35
10Edge line, 4" (648E00100)MI14.52$1,540.00
11Center line (648E00300)MI7.26$2,750.00
12Work zone marking sign (614E12460)EACH89$92.00
13Asphalt concrete for maintaining traffic (614E13000)CY5$210.00
14Work zone center line, class III, 642 paint (614E21550)MI14.52$950.00
15Premium for contract performance bond and for payment bond (103E05000)LS1$5,000.00
16Maintaining traffic (614E11000)LS1$57,500
17Construction layout stakes and surveying, as per plan (623E10001)LS1$1,500.00
18Mobilization (624E10000)LS1$40,000
ODOT contract 250323: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of June 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy