ODOT contract 250434 bid tabulation
D08-Bridge Maintenance FY2026 (BRIDGE REPAIR). Let by Ohio DOT on September 25, 2025, District 8. 2 bids received; low bid $2,785,148 by Complete General Construction Company, +14% against the engineer's estimate of $2,446,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 92
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $2,785,148 | Low | +14% |
| 2 | Prus Construction Company | $3,892,942 | +40% | +59% |
Engineer's estimate: $2,446,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Prus Construction Company |
|---|---|---|---|---|---|
| 1 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 800 | $75.00 | $120.00 |
| 2 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 4 | $1,850.00 | $4,500.00 |
| 3 | Detour signing (614E12420) | LS | 1 | $25,000 | $38,500 |
| 4 | Barrier reflector, type 1 (bidirectional) (614E13310) | EACH | 26 | $12.00 | $18.00 |
| 5 | Object marker, two way (614E13360) | EACH | 26 | $19.00 | $22.00 |
| 6 | Portable changeable message sign, as per plan (614E18601) | SNMT | 2 | $1,100.00 | $825.00 |
| 7 | Portable barrier, unanchored (622E41100) | FT | 1,120 | $26.00 | $40.00 |
| 10 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $30,000 | $90,000 |
| 11 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 68 | $50.00 | $6.00 |
| 12 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 38 | $75.00 | $52.00 |
| 13 | Class QC2 concrete, superstructure (511E34410) | CY | 4 | $3,000.00 | $3,125.00 |
| 14 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 689 | $37.00 | $55.00 |
| 15 | Concrete repair by epoxy injection (512E10600) | FT | 21 | $150.00 | $165.00 |
| 16 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 668 | $30.00 | $132.00 |
| 17 | Field painting of damaged structural steel, as per plan (514E21001) | LS | 1 | $13,000 | $14,300 |
| 18 | Patching concrete structure, as per plan (519E11101) | SF | 275 | $225.00 | $230.00 |
| 19 | Fence, misc.:vandal protection fence rebuilt (607E98200) | LS | 1 | $45,000 | $45,000 |
| 20 | Damage assessment (849E10000) | LS | 1 | $4,900.00 | $5,500.00 |
| 21 | Surface preparation (849E10500) | LS | 1 | $3,250.00 | $2,750.00 |
| 22 | Repairing damaged members by grinding (849E10600) | HR | 20 | $650.00 | $715.00 |
| 23 | Edge line, 4" (646E10000) | MI | 0.11 | $17,950 | $19,800 |
| 24 | Lane line, 4" (646E10100) | MI | 0.11 | $9,215.00 | $19,800 |
| 26 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 7 | $265.00 | $700.00 |
| 27 | Test slab (848E50100) | LS | 1 | $8,000.00 | $2,825.00 |
| 28 | Existing concrete overlay removed (T = 2.5") (848E50320) | SY | 1,430 | $20.00 | $16.00 |
| 29 | Hand chipping (848E50000) | SY | 110 | $75.00 | $170.00 |
| 30 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $50,000 | $4,500.00 |
| 31 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 826 | $37.00 | $52.00 |
| 32 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 446 | $25.00 | $110.00 |
| 33 | Concrete repair by epoxy injection, as per plan (512E10601) | FT | 249 | $125.00 | $165.00 |
| 34 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 826 | $30.00 | $132.00 |
| 35 | Field painting, misc.:painting of existing railing (514E27710) | FT | 929 | $285.00 | $315.00 |
| 36 | Bridge railing rebuilt, as per plan (517E75501) | FT | 90 | $45.00 | $50.00 |
| 37 | Patching concrete structure, as per plan (519E11101) | SF | 24 | $185.00 | $615.00 |
| 38 | Patching concrete structures with trowelable mortar, as per plan (843E50001) | SF | 557 | $179.50 | $330.00 |
| 39 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $60,000 | $105,000 |
| 40 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 169 | $35.00 | $6.00 |
| 41 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 55 | $75.00 | $78.00 |
| 42 | Class QC2 concrete, superstructure (511E34410) | CY | 10 | $3,000.00 | $11,000 |
| 43 | Class QC2 concrete, superstructure, as per plan (511E34411) | CY | 1 | $5,000.00 | $40,000 |
| 44 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $70,000 | $120,000 |
| 45 | Special - pressure relief joint, type C (451E32000) | FT | 41 | $1,500.00 | $600.00 |
| 46 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 236 | $25.00 | $6.00 |
| 47 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 76 | $75.00 | $75.00 |
| 48 | Class QC2 concrete, superstructure (511E34410) | CY | 14 | $3,000.00 | $6,750.00 |
| 49 | Class QC2 concrete, superstructure, as per plan (511E34411) | CY | 1 | $1,000.00 | $35,000 |
| 50 | Aggregate drains (605E31100) | FT | 32 | $60.00 | $115.00 |
| 51 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 54 | $40.00 | $55.00 |
| 52 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $95,000 | $72,000 |
| 53 | Patching concrete structure, as per plan (519E11101) | SF | 42 | $199.00 | $400.00 |
| 54 | Special - patching concrete structure (galvanic an (519E11600) | SF | 435 | $165.00 | $300.00 |
| 55 | Galvanic anode protection (844E20000) | EACH | 443 | $35.00 | $56.00 |
| 56 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $35,000 | $30,000 |
| 57 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 694 | $25.00 | $22.00 |
| 58 | Sidewalk cover plate (516E12310) | LB | 1,040 | $90.00 | $75.00 |
| 59 | Patching concrete structure, as per plan (519E11101) | SF | 416 | $99.00 | $120.00 |
| 60 | Fence, misc.:vandal protection fence rebuilt (607E98200) | LS | 1 | $15,000 | $7,750.00 |
| 61 | Curb, type 4-C (609E24510) | FT | 20 | $225.00 | $225.00 |
| 62 | Center line, type 1 (642E00300) | MI | 0.04 | $56,135 | $110,000 |
| 63 | Patching concrete bridge deck - type B (519E12300) | SY | 68 | $950.00 | $2,900.00 |
| 64 | Portions of structure removed, as per plan (202E11501) | EACH | 4 | $1,925.00 | $1,020.00 |
| 65 | Structural steel members, level UF, as per plan (513E10201) | LB | 217 | $50.00 | $19.00 |
| 66 | Structural steel, misc.:, fillet welding (513E95000) | FT | 5 | $1,750.00 | $1,925.00 |
| 67 | Field painting of damaged structural steel, as per plan (514E20001) | SF | 60 | $380.00 | $418.00 |
| 68 | Damage assessment (849E10000) | LS | 1 | $15,000 | $5,390.00 |
| 69 | Surface preparation (849E10500) | LS | 1 | $5,500.00 | $5,500.00 |
| 70 | Repairing damaged members by grinding (849E10600) | HR | 9 | $250.00 | $275.00 |
| 71 | Straightening damaged members (849E10700) | LS | 1 | $12,200 | $13,200 |
| 72 | Portions of structure removed, as per plan (second (202E11501) | EACH | 9 | $5,000.00 | $453.20 |
| 73 | Structural steel members, level UF, as per plan (513E10201) | LB | 444 | $40.00 | $9.00 |
| 74 | Structural steel, misc.:repair of damaged secondar (513E95000) | FT | 18 | $685.00 | $750.00 |
| 75 | Field painting of damaged structural steel, as per plan (514E21001) | LS | 1 | $68,000 | $74,800 |
| 76 | Damage assessment (849E10000) | LS | 1 | $4,900.00 | $5,390.00 |
| 77 | Surface preparation (849E10500) | LS | 1 | $5,500.00 | $2,750.00 |
| 78 | Repairing damaged members by grinding (849E10600) | HR | 37 | $200.00 | $220.00 |
| 79 | Straightening damaged members (849E10700) | LS | 1 | $18,800 | $19,800 |
| 80 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $5,500.00 |
| 81 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $16,000 | $48,800 |
| 82 | CPM progress schedule (108E10000) | LS | 1 | $4,000.00 | $5,500.00 |
| 83 | Maintaining traffic (614E11000) | LS | 1 | $295,000 | $600,000 |
| 84 | Construction layout stakes and surveying (623E10000) | LS | 1 | $20,000 | $30,000 |
| 85 | Mobilization (624E10000) | LS | 1 | $140,000 | $100,000 |
| 100 | Walk removed (202E30000) | SF | 96 | $25.00 | $12.00 |
| 101 | 4" concrete walk (608E10000) | SF | 96 | $65.00 | $24.00 |
| 102 | Lane arrow (644E01300) | EACH | 2 | $1,080.00 | $605.00 |
| 103 | Removal of pavement marking (644E30020) | EACH | 2 | $520.00 | $82.50 |
| 104 | Lane arrow (646E20300) | EACH | 2 | $850.00 | $605.00 |
| 105 | Removal of pavement marking (646E50000) | EACH | 45 | $520.00 | $82.50 |
| 106 | Special - structures, temporary protective false D (530E00200) | LS | 1 | $65,000 | $80,000 |
| 107 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 1,430 | $75.00 | $70.00 |
| 108 | Surface preparation using hydrodemolition (848E20000) | SY | 1,430 | $95.00 | $78.00 |
| 109 | Full-depth repair (848E50200) | CY | 6 | $500.00 | $7,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.