ODOT contract 260121 bid tabulation
HAM-CR 158/CR 460-02.04/00.54 (INTERSECTION). Let by Ohio DOT on March 26, 2026, HAM. 4 bids received; low bid $2,411,597 by Sunesis Construction Co, +6.0% against the engineer's estimate of $2,275,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 136
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sunesis Construction Co | $2,411,597 | Low | +6.0% |
| 2 | Barrett Paving Materials Inc | $2,412,139 | 0.0% | +6.0% |
| 3 | Prus Construction Company | $2,536,744 | +5.0% | +12% |
| 4 | John R Jurgensen Company | $2,719,403 | +13% | +20% |
Engineer's estimate: $2,275,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sunesis Construction Co | 2. Barrett Paving Materials Inc | 3. Prus Construction Company | 4. John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $13,024 | $5,000.00 | $1,000.00 | $8,712.19 |
| 2 | Pavement removed (202E23000) | SY | 1,301 | $14.33 | $30.00 | $43.00 | $28.85 |
| 3 | Walk removed (202E30000) | SF | 7,575 | $1.32 | $4.00 | $3.50 | $3.03 |
| 4 | Steps removed (202E30200) | FT | 18 | $64.06 | $35.00 | $42.00 | $181.04 |
| 5 | Curb removed (202E32000) | FT | 1,313 | $2.08 | $8.00 | $23.00 | $13.55 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 246 | $17.94 | $20.00 | $7.50 | $75.90 |
| 7 | Manhole removed (202E58000) | EACH | 1 | $1,312.48 | $750.00 | $1,850.00 | $1,998.43 |
| 8 | Catch basin removed (202E58100) | EACH | 5 | $567.71 | $500.00 | $1,110.00 | $1,998.44 |
| 9 | Valve box removed (202E75610) | EACH | 7 | $169.14 | $150.00 | $345.00 | $594.25 |
| 10 | Excavation (203E10000) | CY | 1,300 | $49.51 | $75.00 | $38.00 | $40.64 |
| 11 | Embankment (203E20000) | CY | 260 | $7.16 | $40.00 | $44.00 | $35.76 |
| 12 | Subgrade compaction (204E10000) | SY | 2,750 | $6.41 | $4.00 | $4.50 | $3.23 |
| 13 | Excavation of subgrade (204E13000) | CY | 678 | $36.06 | $50.00 | $47.00 | $84.41 |
| 14 | Granular material, type B (204E30010) | CY | 678 | $103.58 | $115.00 | $88.00 | $157.90 |
| 15 | Proof rolling (204E45000) | HR | 2 | $227.75 | $2,000.00 | $155.00 | $288.01 |
| 16 | Geotextile fabric (204E50000) | SY | 2,028 | $2.24 | $2.50 | $6.50 | $6.02 |
| 17 | Fence removed and rebuilt (607E35000) | FT | 50 | $65.00 | $92.50 | $103.00 | $65.00 |
| 18 | 5" concrete walk (608E12000) | SF | 7,370 | $9.80 | $11.00 | $12.00 | $10.68 |
| 19 | Concrete steps, type A (608E40000) | FT | 19 | $436.65 | $350.00 | $550.00 | $297.25 |
| 20 | Curb ramp (608E52000) | SF | 846 | $25.33 | $28.50 | $19.25 | $25.53 |
| 21 | Right-of-way monument, type B (623E40520) | EACH | 13 | $481.79 | $350.00 | $2,150.00 | $667.59 |
| 22 | Planting, misc.: replace disturbed landscaping (661E99940) | LS | 1 | $2,500.00 | $1,200.00 | $3,850.00 | $5,000.00 |
| 23 | Landscape watering, misc.: irrigation system (662E98000) | EACH | 1 | $2,250.00 | $2,000.00 | $2,750.00 | $7,829.55 |
| 24 | Soil analysis test (659E00100) | EACH | 2 | $54.67 | $200.00 | $220.00 | $200.00 |
| 25 | Topsoil (659E00300) | CY | 82 | $143.09 | $150.00 | $104.00 | $90.16 |
| 26 | Seeding and mulching (659E10000) | SY | 736 | $13.37 | $5.00 | $5.50 | $5.00 |
| 27 | Repair seeding and mulching (659E14000) | SY | 37 | $0.28 | $1.00 | $1.15 | $1.00 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.10 | $345.60 | $1,500.00 | $1,650.00 | $1,500.00 |
| 29 | Lime (659E31000) | ACRE | 0.15 | $51.87 | $200.00 | $220.00 | $200.00 |
| 30 | Water (659E35000) | MGAL | 3 | $1.39 | $1.00 | $1.00 | $1.00 |
| 31 | Mowing (659E40000) | MSF | 1 | $2.00 | $1.00 | $1.00 | $1.00 |
| 32 | Erosion control (832E30000) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 33 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $3,475.20 | $15,000 | $19,450 | $25,086 |
| 34 | 6" shallow pipe underdrains (605E11100) | FT | 2,123 | $17.39 | $25.00 | $22.00 | $41.22 |
| 35 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 83 | $45.93 | $45.00 | $44.00 | $75.88 |
| 36 | 12" conduit, type B (611E04400) | FT | 229 | $110.32 | $145.00 | $188.00 | $178.65 |
| 37 | 12" conduit, type C (611E04600) | FT | 138 | $83.60 | $125.00 | $193.00 | $162.40 |
| 38 | 15" conduit, type B (611E05900) | FT | 87 | $138.51 | $235.00 | $205.00 | $438.20 |
| 39 | 15" conduit, type C (611E06100) | FT | 26 | $137.34 | $195.00 | $130.00 | $227.06 |
| 40 | Conduit, misc.: replace yard drain outlet (611E97200) | EACH | 2 | $603.20 | $400.00 | $875.00 | $1,974.78 |
| 41 | Catch basin, no. 3 (611E98150) | EACH | 10 | $4,894.82 | $6,500.00 | $5,925.00 | $7,377.19 |
| 42 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,628.54 | $3,500.00 | $3,265.00 | $5,556.25 |
| 43 | Manhole, no. 3 (611E99574) | EACH | 2 | $3,551.69 | $7,500.00 | $6,100.00 | $6,625.81 |
| 44 | Manhole adjusted to grade (611E99654) | EACH | 4 | $1,853.37 | $1,250.00 | $1,100.00 | $1,510.12 |
| 45 | Manhole, misc.: manhole adjusted to grade and repl (611E99690) | EACH | 1 | $1,853.36 | $1,750.00 | $1,450.00 | $2,333.53 |
| 46 | Special - gas valve box adjusted to grade (611E99700) | EACH | 18 | $53.99 | $250.00 | $505.00 | $817.53 |
| 47 | Pavement planing, asphalt concrete (3" depth) (254E01000) | SY | 4,640 | $5.91 | $7.50 | $9.00 | $8.00 |
| 48 | Asphalt concrete base, (449), as per plan, PG64-2 (301E56001) | CY | 312 | $432.77 | $275.00 | $465.00 | $420.00 |
| 49 | Aggregate base (304E20000) | CY | 212 | $149.03 | $140.00 | $250.00 | $274.35 |
| 50 | Non-tracking tack coat (407E20000) | GAL | 822 | $5.00 | $4.00 | $8.00 | $5.00 |
| 52 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 278 | $505.00 | $375.00 | $555.00 | $505.00 |
| 53 | Asphalt concrete surface course, 12.5 MM, type B (448) (442E20050) | CY | 278 | $405.00 | $300.00 | $450.00 | $405.00 |
| 54 | 7" non-reinforced concrete pavement, class QC 1P (452E11010) | SY | 684 | $102.77 | $120.00 | $140.00 | $100.36 |
| 55 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 38 | $115.00 | $140.00 | $233.00 | $109.05 |
| 56 | Curb, type 6 (609E26000) | FT | 1,612 | $30.56 | $35.00 | $46.00 | $33.57 |
| 58 | RPM (621E00100) | EACH | 123 | $68.31 | $45.00 | $50.00 | $45.00 |
| 59 | Ground mounted support, no. 3 post (630E03100) | FT | 116 | $16.00 | $22.56 | $25.00 | $16.00 |
| 60 | Sign attachment assembly, mast arm (630E79200) | EACH | 12 | $469.40 | $469.40 | $520.00 | $469.40 |
| 61 | Sign, flat sheet (630E80100) | SF | 149 | $25.50 | $24.30 | $27.00 | $25.50 |
| 62 | Removal of ground mounted sign and disposal (630E84900) | EACH | 3 | $20.00 | $16.56 | $18.00 | $20.00 |
| 63 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $30.00 | $22.08 | $25.00 | $30.00 |
| 64 | Edge line, 4" (644E00100) | MI | 0.37 | $5,800.00 | $460.00 | $6,400.00 | $3,655.00 |
| 65 | Center line (644E00300) | MI | 0.21 | $9,250.00 | $5,300.00 | $10,175 | $5,620.00 |
| 66 | Channelizing line, 8" (644E00400) | FT | 1,724 | $1.75 | $2.50 | $2.00 | $2.10 |
| 67 | Stop line (644E00500) | FT | 146 | $9.00 | $7.00 | $10.00 | $7.00 |
| 68 | Crosswalk line, 12" (644E00620) | FT | 554 | $5.00 | $7.00 | $5.50 | $3.50 |
| 69 | Transverse/diagonal line (644E00700) | FT | 103 | $8.50 | $7.00 | $9.50 | $7.00 |
| 70 | Transverse/diagonal line (644E00700) | FT | 22 | $8.50 | $7.00 | $9.50 | $7.00 |
| 71 | Island marking (644E00900) | SF | 24 | $6.00 | $8.00 | $7.00 | $4.20 |
| 72 | Lane arrow (644E01300) | EACH | 31 | $135.00 | $105.00 | $150.00 | $113.00 |
| 73 | Conduit, 2", 725.052 (625E25410) | FT | 36 | $5.38 | $5.30 | $6.00 | $5.30 |
| 74 | Conduit, 4", 725.052 (625E25606) | FT | 75 | $10.01 | $9.85 | $11.00 | $9.85 |
| 75 | Conduit, jacked or drilled, 725.052, 4" (625E25908) | FT | 339 | $95.49 | $94.00 | $103.00 | $94.00 |
| 76 | Trench (625E29000) | FT | 92 | $16.61 | $16.35 | $18.00 | $16.35 |
| 77 | Pull box, 725.08, 24" (625E30706) | EACH | 5 | $1,234.24 | $1,215.00 | $1,350.00 | $1,215.00 |
| 78 | Ground rod (625E32000) | EACH | 9 | $507.92 | $500.00 | $550.00 | $500.00 |
| 79 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007) | EACH | 5 | $1,229.16 | $1,210.00 | $1,335.00 | $1,210.00 |
| 80 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 7 | $1,869.14 | $1,840.00 | $2,025.00 | $1,840.00 |
| 81 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $655.21 | $645.00 | $710.00 | $645.00 |
| 82 | Covering of vehicular signal head (632E25000) | EACH | 12 | $86.35 | $85.00 | $95.00 | $85.00 |
| 83 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $86.35 | $85.00 | $95.00 | $85.00 |
| 84 | Pedestrian pushbutton (632E26000) | EACH | 8 | $284.43 | $280.00 | $310.00 | $280.00 |
| 85 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,146 | $2.49 | $2.45 | $2.75 | $2.45 |
| 86 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,245 | $2.69 | $2.65 | $3.00 | $2.65 |
| 87 | Signal support foundation, as per plan (632E64011) | EACH | 4 | $8,106.37 | $7,980.00 | $8,800.00 | $7,980.00 |
| 88 | Pedestal foundation, as per plan (632E64021) | EACH | 4 | $2,529.43 | $2,490.00 | $2,750.00 | $2,490.00 |
| 89 | Loop detector lead-in cable, 2 conductor, no. 14 AWG (632E65300) | FT | 1,123 | $2.18 | $2.15 | $2.40 | $2.15 |
| 90 | Power cable, 3 conductor, no. 10 AWG (632E66104) | FT | 100 | $6.25 | $6.15 | $7.00 | $6.15 |
| 91 | Power service (632E70000) | EACH | 1 | $6,196.60 | $6,100.00 | $6,750.00 | $6,100.00 |
| 92 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 1 | $15,029 | $14,795 | $16,300 | $14,795 |
| 93 | Signal support, type TC-81.22, design 12, as per plan (632E72131) | EACH | 2 | $18,493 | $18,205 | $20,025 | $18,205 |
| 94 | Signal support, type TC-81.22, design 14, as per plan (632E72151) | EACH | 1 | $24,984 | $24,595 | $27,055 | $24,595 |
| 95 | Pedestal, 5', transformer base, as per plan (632E89803) | EACH | 1 | $1,249.48 | $1,230.00 | $1,650.00 | $1,230.00 |
| 96 | Pedestal, 8', transformer base, as per plan (632E89901) | EACH | 3 | $1,320.59 | $1,300.00 | $1,435.00 | $1,300.00 |
| 97 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $5,399.17 | $5,315.00 | $5,850.00 | $5,315.00 |
| 98 | Cabinet, type 332, as per plan (633E65521) | EACH | 1 | $21,713 | $21,375 | $23,500 | $21,375 |
| 99 | Cabinet foundation (633E67100) | EACH | 1 | $2,041.83 | $2,010.00 | $2,200.00 | $2,010.00 |
| 100 | Controller work pad (633E67200) | EACH | 1 | $1,396.77 | $1,375.00 | $1,525.00 | $1,375.00 |
| 101 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 1 | $8,913.96 | $8,775.00 | $9,650.00 | $8,775.00 |
| 102 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $6,348.97 | $6,250.00 | $6,875.00 | $6,250.00 |
| 105 | Atc controller, as per plan (809E69123) | EACH | 1 | $5,856.29 | $5,765.00 | $6,350.00 | $6,250.00 |
| 106 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,435 | $8,777.34 | $10,350 | $25,303 |
| 107 | Maintaining traffic (614E11000) | LS | 1 | $41,666 | $97,500 | $107,500 | $404,665 |
| 108 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 5 | $250.00 | $100.00 | $115.00 | $165.12 |
| 110 | Construction layout stakes and surveying (623E10000) | LS | 1 | $20,700 | $35,000 | $22,770 | $14,709 |
| 111 | Mobilization (624E10000) | LS | 1 | $138,059 | $100,000 | $100,000 | $130,000 |
| 200 | Concrete, misc.:concrete, cincinnati spec 1110 (511E71100) | CY | 21 | $372.24 | $160.00 | $180.00 | $350.00 |
| 201 | Unclassified excavation, as per plan (503E21101) | CY | 5 | $135.34 | $0.10 | $5.00 | $500.00 |
| 202 | Unclassified excavation, as per plan (503E21101) | CY | 5 | $53.11 | $0.10 | $5.00 | $500.00 |
| 203 | Structural steel, misc.:reinforcing steel, cincinn (513E90000) | LB | 2,986 | $2.26 | $0.70 | $1.00 | $1.00 |
| 204 | Special - structuressheeting and bracing ordered L (530E10700) | MFBM | 1 | $3.40 | $1.00 | $1.00 | $8,000.00 |
| 205 | Brick masonry (602E10000) | CY | 1 | $914.49 | $1.00 | $1.00 | $1,000.00 |
| 206 | Water work, misc.:adjustments to existing valve CH (638E98000) | EACH | 2 | $880.66 | $800.00 | $800.00 | $1,500.00 |
| 207 | Water work, misc.: furnishing and installing curb (638E98000) | EACH | 14 | $1,576.76 | $880.00 | $415.00 | $350.00 |
| 208 | Water work, misc.:furnishing and installing fire H (638E98000) | EACH | 2 | $1,715.38 | $1,555.00 | $650.00 | $1,200.00 |
| 209 | Water work, misc.:furnishing and installing fire H (638E98000) | EACH | 1 | $1,715.38 | $1,775.00 | $650.00 | $1,200.00 |
| 210 | Water work, misc.: furnishing and installing fire (638E98000) | EACH | 1 | $1,715.38 | $1,905.00 | $830.00 | $1,200.00 |
| 211 | Water work, misc.:furnishing and installing valve (638E98000) | EACH | 9 | $3,729.41 | $620.00 | $475.00 | $500.00 |
| 212 | Water work, misc.:furnishing and installing valve (638E98000) | EACH | 7 | $2,247.91 | $1,330.00 | $1,400.00 | $1,000.00 |
| 213 | Water work, misc.: hauling and installing fire hyd (638E98000) | EACH | 3 | $4,632.10 | $2,940.00 | $2,100.00 | $1,800.00 |
| 214 | Water work, misc.:removing existing manhole curb A (638E98000) | EACH | 4 | $883.38 | $700.00 | $485.00 | $1,500.00 |
| 215 | Water work, misc.:removing existing valve box, cin (638E98000) | EACH | 3 | $204.78 | $350.00 | $145.00 | $750.00 |
| 216 | Water work, misc.:removing fire hydrant, cincinnat (638E98000) | EACH | 2 | $600.35 | $730.00 | $450.00 | $750.00 |
| 217 | Water work, misc.:changing 8? and under pipe sewer (638E98000) | EACH | 25 | $213.05 | $6.00 | $10.00 | $100.00 |
| 218 | Water work, misc.:changing 10? thru 24? pipe sewer (638E98600) | FT | 25 | $347.49 | $10.00 | $10.00 | $125.00 |
| 219 | Water work, misc.:furnishihng and installing 1? CO (638E98600) | FT | 138 | $244.98 | $280.00 | $210.00 | $100.00 |
| 220 | Water work, misc.:furnishihng and installing 3/4? (638E98600) | FT | 256 | $503.29 | $350.00 | $170.00 | $100.00 |
| 221 | Water work, misc.:furnishihng and laying 6? ductil (638E98600) | FT | 65 | $249.01 | $290.00 | $286.00 | $125.00 |
| 222 | Water work, misc.:furnishihng and laying 8? ductil (638E98600) | FT | 1,279 | $314.15 | $311.00 | $265.00 | $155.00 |
| 223 | Work zone center line, class I, 642 paint (614E21100) | MI | 1.11 | $1,200.00 | $2,000.00 | $1,325.00 | $900.00 |
| 224 | Work zone edge line, class I, 4" (614E22000) | MI | 1.81 | $600.00 | $1,200.00 | $660.00 | $600.00 |
| 225 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 7,672 | $0.45 | $0.70 | $0.50 | $0.60 |
| 226 | Work zone stop line, class I, 642 paint (614E26200) | FT | 593 | $2.50 | $4.00 | $2.75 | $2.50 |
| 227 | Work zone crosswalk line, class I, 24" (614E27020) | FT | 1,701 | $2.00 | $3.00 | $2.25 | $1.25 |
| 228 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 130 | $20.00 | $25.00 | $22.00 | $18.50 |
| 229 | Work zone island marking, class I (614E32700) | SF | 72 | $1.50 | $2.50 | $1.65 | $1.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.