| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 8,498 | $20.00 |
| 3 | Walk removed (202E30000) | SF | 1,485 | $3.00 |
| 4 | Curb removed, as per plan (202E32001) | FT | 2,862 | $20.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 247 | $31.00 |
| 6 | Guardrail removed (202E38000) | FT | 1,073 | $3.00 |
| 7 | Catch basin removed (202E58100) | EACH | 16 | $1,550.00 |
| 8 | Removal misc.: conduit (202E98200) | FT | 20 | $31.00 |
| 9 | Excavation (203E10000) | CY | 2,331 | $38.00 |
| 10 | Embankment (203E20000) | CY | 59 | $53.00 |
| 11 | Subgrade compaction (204E10000) | SY | 8,718 | $5.00 |
| 12 | Excavation of subgrade (204E13000) | CY | 250 | $55.00 |
| 13 | Granular material, type B (204E30010) | CY | 250 | $125.00 |
| 14 | Proof rolling (204E45000) | HR | 4 | $100.00 |
| 15 | Geotextile fabric (204E50000) | SY | 500 | $5.00 |
| 16 | Guardrail, type MGS (606E15050) | FT | 978 | $22.00 |
| 17 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $2,300.00 |
| 18 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,175.00 |
| 19 | 4" concrete walk (608E10000) | SF | 1,164 | $18.00 |
| 20 | 8" concrete walk (608E15000) | SF | 54 | $30.00 |
| 21 | Curb ramp, as per plan (608E52001) | SF | 349 | $30.00 |
| 22 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 9 | $750.00 |
| 23 | Special - as-built construction plans (690E91000) | LS | 1 | $4,500.00 |
| 24 | Special - misc.: preconstruction video taping (690E98400) | LS | 1 | $750.00 |
| 25 | Special - survey control verification (690E98400) | LS | 1 | $10,500 |
| 26 | Soil analysis test (659E00100) | EACH | 2 | $100.00 |
| 27 | Topsoil (659E00300) | CY | 150 | $50.00 |
| 28 | Seeding and mulching (659E10000) | SY | 1,351 | $5.00 |
| 29 | Repair seeding and mulching (659E14000) | SY | 68 | $10.00 |
| 30 | Commercial fertilizer (659E20000) | TON | 0.18 | $1,000.00 |
| 31 | Lime (659E31000) | ACRE | 0.28 | $1,000.00 |
| 32 | Water (659E35000) | MGAL | 7 | $100.00 |
| 33 | Erosion control (832E30000) | EACH | 21,000 | $1.00 |
| 34 | 4" base pipe underdrains with geotextile fabric (605E06020) | FT | 2,564 | $30.00 |
| 35 | 6" unclassified pipe underdrains (605E13300) | FT | 10 | $30.00 |
| 36 | 4" conduit, type F for underdrain outlet (611E00410) | FT | 210 | $32.00 |
| 37 | 6" conduit, type B (611E00900) | FT | 10 | $350.00 |
| 38 | 6" conduit, type B (611E00900) | FT | 20 | $350.00 |
| 39 | 6" conduit, type C (611E01100) | FT | 5 | $350.00 |
| 40 | 6" conduit, type F (611E01500) | FT | 10 | $350.00 |
| 41 | 8" conduit, type B (611E01800) | FT | 10 | $355.00 |
| 42 | 8" conduit, type C (611E02000) | FT | 5 | $355.00 |
| 43 | 12" conduit, type B (611E04400) | FT | 19 | $360.00 |
| 44 | 12" conduit, type B (611E04400) | FT | 25 | $425.00 |
| 45 | 12" conduit, type B (611E04400) | FT | 40 | $400.00 |
| 46 | 12" conduit, type C (611E04600) | FT | 17 | $400.00 |
| 47 | 18" conduit, type B (611E07400) | FT | 50 | $405.00 |
| 48 | 24" conduit, type B (611E10400) | FT | 30 | $435.00 |
| 49 | Conduit, misc.: type B for drainage discharge cont (611E97400) | FT | 20 | $150.00 |
| 50 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 20 | $150.00 |
| 51 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 20 | $150.00 |
| 52 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 20 | $150.00 |
| 53 | Catch basin, no. 3 (611E98150) | EACH | 2 | $9,500.00 |
| 54 | Catch basin, no. 3A (611E98180) | EACH | 12 | $11,000 |
| 55 | Catch basin, no. 3A, as per plan (611E98181) | EACH | 2 | $17,000 |
| 56 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 7 | $1,250.00 |
| 57 | Special - miscellaneous metal (611E99820) | LB | 400 | $4.00 |
| 58 | Full depth pavement sawing (252E01500) | FT | 1,121 | $3.00 |
| 59 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,355 | $185.00 |
| 60 | Aggregate base (304E20000) | CY | 1,434 | $90.00 |
| 61 | Non-tracking tack coat (407E20000) | GAL | 894 | $5.00 |
| 62 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 282 | $280.00 |
| 63 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 395 | $265.00 |
| 64 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 116 | $175.00 |
| 65 | Curb, type 6 (609E26000) | FT | 2,812 | $60.00 |
| 66 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 5 | $1,100.00 |
| 67 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 15 | $13.00 |
| 68 | Ground mounted support, no. 2 post (630E02100) | FT | 273.60 | $15.00 |
| 69 | Ground mounted support, no. 3 post (630E03100) | FT | 317.30 | $20.00 |
| 70 | Street name sign support, no. 3 post (630E08520) | FT | 27.80 | $20.00 |
| 71 | Sign post reflector (630E08600) | EACH | 3 | $60.00 |
| 72 | Sign support assembly, pole mounted (630E79500) | EACH | 12 | $155.00 |
| 73 | Sign, flat sheet (630E80100) | SF | 308 | $20.00 |
| 74 | Removal of ground mounted sign and disposal (630E84900) | EACH | 32 | $20.00 |
| 75 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $100.00 |
| 76 | Removal of ground mounted post support and disposal (630E86002) | EACH | 23 | $25.00 |
| 77 | Removal of pole mounted sign and disposal (630E87500) | EACH | 14 | $23.00 |
| 78 | Edge line, 6" (644E00104) | MI | 0.43 | $9,500.00 |
| 79 | Center line (644E00300) | MI | 0.42 | $9,500.00 |
| 80 | Channelizing line, 8" (644E00400) | FT | 641 | $2.50 |
| 81 | Stop line (644E00500) | FT | 97 | $8.00 |
| 82 | Crosswalk line, 24", as per plan (644E00631) | FT | 288 | $8.50 |
| 83 | Transverse/diagonal line (644E00700) | FT | 64 | $10.00 |
| 84 | Lane arrow (644E01300) | EACH | 14 | $130.00 |
| 85 | Dotted line, 4" (644E01500) | FT | 514 | $2.00 |
| 86 | Bike lane symbol marking (644E01630) | EACH | 12 | $300.00 |
| 87 | Edge line, 4" (646E10000) | MI | 0.10 | $8,500.00 |
| 88 | Edge line, 6" (646E10010) | MI | 0.10 | $8,500.00 |
| 89 | Center line (646E10200) | MI | 0.13 | $8,500.00 |
| 90 | Channelizing line, 8" (646E10300) | FT | 421 | $2.00 |
| 91 | Stop line (646E10400) | FT | 115 | $10.00 |
| 92 | Crosswalk line, 24", as per plan (646E10521) | FT | 261 | $11.00 |
| 93 | Transverse/diagonal line (646E10600) | FT | 68 | $15.00 |
| 94 | Curb marking (646E10700) | FT | 149 | $10.00 |
| 95 | Island marking (646E10800) | SF | 8 | $35.00 |
| 96 | Handicap symbol marking (646E10900) | EACH | 1 | $350.00 |
| 97 | Parking lot stall marking (646E20200) | FT | 120 | $6.00 |
| 98 | Lane arrow (646E20300) | EACH | 8 | $250.00 |
| 99 | Dotted line, 4" (646E20502) | FT | 256 | $2.00 |
| 100 | Bike lane symbol marking (646E20600) | EACH | 2 | $200.00 |
| 101 | Shared lane marking (646E20650) | EACH | 6 | $250.00 |
| 102 | Removal of pavement marking (646E50000) | EACH | 1 | $200.00 |
| 103 | Removal of pavement marking (646E50100) | FT | 2,268 | $2.50 |
| 104 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $85.00 |
| 105 | Detour signing (614E12420) | LS | 1 | $20,000 |
| 106 | Portable changeable message sign, as per plan (614E18601) | SNMT | 16 | $1,200.00 |
| 107 | Work zone lane line, class I, 4" (614E20000) | MI | 0.14 | $2,000.00 |
| 108 | Work zone center line, class I (614E21000) | MI | 0.07 | $3,000.00 |
| 109 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.49 | $3,250.00 |
| 110 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.63 | $1,900.00 |
| 111 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 972 | $1.00 |
| 112 | Work zone stop line, class I (614E26000) | FT | 48 | $5.00 |
| 113 | Work zone stop line, class III, 642 paint (614E26610) | FT | 302 | $5.00 |
| 114 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 22 | $100.00 |
| 115 | Water (616E10000) | MGAL | 10 | $100.00 |
| 116 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 |
| 117 | Maintaining traffic (614E11000) | LS | 1 | $50,000 |
| 118 | Field office, type B (619E16010) | MNTH | 6 | $1,750.00 |
| 119 | Construction layout stakes and surveying (623E10000) | LS | 1 | $26,000 |
| 120 | Mobilization (624E10000) | LS | 1 | $40,000 |