| 1 | Clearing and grubbing (201E11000) | LS | 1 | $180,000 | $25,000 |
| 2 | Pavement removed (202E23000) | SY | 21,020 | $11.00 | $20.00 |
| 3 | Wearing course removed (202E23500) | SY | 76,733 | $3.00 | $5.10 |
| 4 | Walk removed (202E30000) | SF | 1,606 | $1.50 | $17.50 |
| 5 | Curb removed (202E32000) | FT | 502 | $7.00 | $21.50 |
| 6 | Curb and gutter removed (202E32500) | FT | 2,463 | $5.00 | $23.50 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 2,023 | $15.00 | $42.00 |
| 8 | Pipe removed, over 24" diameter (202E35200) | FT | 50 | $29.00 | $315.00 |
| 9 | Guardrail removed, as per plan (202E38001) | FT | 18,564 | $4.00 | $2.00 |
| 10 | Catch basin removed (202E58100) | EACH | 79 | $316.00 | $800.00 |
| 11 | Special - pipe cleanout, 27" to 48" (202E70120) | FT | 115 | $27.00 | $55.00 |
| 12 | Removal misc.: inspection well (202E98100) | EACH | 2 | $464.00 | $1,700.00 |
| 13 | Removal misc.: conduit (202E98200) | FT | 65 | $15.00 | $215.00 |
| 14 | Removal misc.: conduit with concrete encasement (202E98200) | FT | 192 | $28.00 | $110.00 |
| 15 | Excavation (203E10000) | CY | 20,425 | $24.00 | $36.50 |
| 16 | Embankment (203E20000) | CY | 3,820 | $35.00 | $36.50 |
| 17 | Embankment, as per plan (203E20001) | CY | 50 | $29.00 | $115.00 |
| 18 | Subgrade compaction (204E10000) | SY | 56,631 | $2.50 | $1.00 |
| 19 | Excavation of subgrade (204E13000) | CY | 947 | $25.00 | $43.00 |
| 20 | Granular material, type B (204E30010) | CY | 413 | $108.00 | $90.00 |
| 21 | Proof rolling (204E45000) | HR | 31 | $550.00 | $125.00 |
| 22 | Geotextile fabric (204E50000) | SY | 1,600 | $1.00 | $6.00 |
| 23 | Ditch cleanout, as per plan (209E10001) | FT | 277 | $18.00 | $37.00 |
| 24 | Guardrail, type MGS (606E15050) | FT | 9,488 | $20.00 | $19.00 |
| 25 | Guardrail, type MGS with long posts (606E15100) | FT | 6,300 | $25.00 | $24.00 |
| 26 | Anchor assembly, MGS type E (606E26150) | EACH | 46 | $2,500.00 | $2,485.00 |
| 27 | Anchor assembly, MGS type T (606E26550) | EACH | 43 | $1,400.00 | $1,375.00 |
| 28 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 8 | $2,600.00 | $2,445.00 |
| 29 | 4" concrete walk (608E10000) | SF | 1,303 | $12.00 | $10.00 |
| 30 | Curb ramp (608E52000) | SF | 303 | $36.00 | $28.50 |
| 31 | Special - mailbox support system, single (690E50100) | EACH | 69 | $550.00 | $195.00 |
| 32 | Special - mailbox support system, double (690E50200) | EACH | 29 | $648.00 | $320.00 |
| 33 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 89 | $171.00 | $165.00 |
| 34 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 33 | $166.00 | $80.00 |
| 35 | Tied concrete block mat with type 2 underlayment, as per plan (601E21061) | SY | 12 | $155.00 | $173.00 |
| 36 | Rock channel protection, type A with geotextile fabric (601E32004) | CY | 13 | $325.00 | $255.00 |
| 37 | Rock channel protection, type B with filter (601E32100) | CY | 5 | $360.00 | $290.00 |
| 38 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 28 | $300.00 | $270.00 |
| 39 | Rock channel protection, type C with filter (601E32200) | CY | 10 | $472.00 | $400.00 |
| 40 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 2 | $733.00 | $745.00 |
| 41 | Rock channel protection, type D with filter (601E32300) | CY | 34 | $200.00 | $270.00 |
| 42 | Soil analysis test (659E00100) | EACH | 2 | $26.00 | $350.00 |
| 43 | Topsoil (659E00300) | CY | 5,395 | $19.00 | $40.00 |
| 44 | Seeding and mulching, class 1 (659E00500) | SY | 37,248 | $2.00 | $1.10 |
| 45 | Repair seeding and mulching (659E14000) | SY | 1,862 | $2.50 | $1.00 |
| 46 | Inter-seeding (659E15000) | SY | 1,862 | $0.25 | $0.10 |
| 47 | Commercial fertilizer (659E20000) | TON | 5 | $800.00 | $1,500.00 |
| 48 | Lime (659E31000) | ACRE | 8 | $50.00 | $0.40 |
| 49 | Water (659E35000) | MGAL | 102 | $1.00 | $40.00 |
| 50 | Slope erosion protection (670E00500) | SY | 18,253 | $2.50 | $2.50 |
| 51 | Ditch erosion protection (670E00700) | SY | 255 | $4.00 | $3.00 |
| 52 | Storm water pollution prevention plan (832E15000) | LS | 1 | $4,000.00 | $3,500.00 |
| 53 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $20,000 | $17,120 |
| 54 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $17,000 | $16,090 |
| 55 | Erosion control (832E30000) | EACH | 206,280 | $1.00 | $1.00 |
| 56 | Concrete masonry (602E20000) | CY | 3.70 | $2,500.00 | $3,555.00 |
| 57 | 6" shallow pipe underdrains with geotextile fabric (605E11110) | FT | 38,641 | $16.00 | $14.00 |
| 58 | 6" unclassified pipe underdrains with geotextile fabric (605E13410) | FT | 98 | $42.00 | $16.85 |
| 59 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 940 | $19.00 | $14.00 |
| 60 | Aggregate drains (605E31100) | FT | 2,600 | $17.00 | $26.00 |
| 61 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 890 | $41.00 | $20.00 |
| 62 | 6" conduit, type B (611E00900) | FT | 195 | $36.00 | $40.00 |
| 63 | 6" conduit, type C (611E01100) | FT | 8 | $77.00 | $85.00 |
| 64 | 6" conduit, type F (611E01500) | FT | 980 | $30.00 | $78.00 |
| 65 | 10" conduit, type D (611E03400) | FT | 4 | $350.00 | $520.00 |
| 66 | 12" conduit, type C (611E04600) | FT | 288 | $310.00 | $350.00 |
| 67 | 12" conduit, type D (611E04900) | FT | 20 | $319.00 | $460.00 |
| 68 | 15" conduit, type B (611E05900) | FT | 4 | $370.00 | $600.00 |
| 69 | 15" conduit, type C (611E06100) | FT | 1,334 | $127.00 | $150.00 |
| 70 | 15" conduit, type D (611E06400) | FT | 109 | $97.00 | $175.00 |
| 71 | 18" conduit, type C (611E07600) | FT | 72 | $415.00 | $475.00 |
| 72 | 21" conduit, type C (611E09100) | FT | 4 | $560.00 | $580.00 |
| 73 | 24" conduit, type A (611E10200) | FT | 10 | $329.00 | $880.00 |
| 74 | 24" conduit, type B (611E10400) | FT | 66 | $240.00 | $255.00 |
| 75 | 24" conduit, type C (611E10600) | FT | 56 | $360.00 | $525.00 |
| 76 | 30" conduit, type B (611E13400) | FT | 70 | $238.00 | $225.00 |
| 77 | 30" conduit, type C (611E13600) | FT | 23 | $435.00 | $510.00 |
| 78 | 36" conduit, type C (611E16600) | FT | 14 | $450.00 | $705.00 |
| 79 | 48" conduit, type B (611E20900) | FT | 117 | $650.00 | $415.00 |
| 80 | Conduit, misc.: type B for drainage discharge cont (611E97400) | FT | 65 | $33.00 | $100.00 |
| 81 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 65 | $33.00 | $100.00 |
| 82 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 65 | $33.00 | $100.00 |
| 83 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 65 | $33.00 | $100.00 |
| 84 | Catch basin, no. 3 (611E98150) | EACH | 16 | $6,300.00 | $5,400.00 |
| 85 | Catch basin, no. 3, as per plan (611E98151) | EACH | 2 | $6,200.00 | $7,800.00 |
| 86 | Catch basin, no. 6 (611E98370) | EACH | 1 | $6,400.00 | $5,300.00 |
| 87 | Catch basin, no. 2-2B (611E98470) | EACH | 45 | $3,800.00 | $3,800.00 |
| 88 | Catch basin, no. 2-2C (611E98504) | EACH | 3 | $3,700.00 | $4,000.00 |
| 89 | Catch basin, no. 2-3 (611E98510) | EACH | 9 | $3,800.00 | $4,200.00 |
| 90 | Catch basin, no. 2-4 (611E98540) | EACH | 5 | $4,300.00 | $4,200.00 |
| 91 | Catch basin, no. 2-6 (611E98600) | EACH | 1 | $18,000 | $11,000 |
| 92 | Catch basin adjusted to grade (611E98630) | EACH | 4 | $1,800.00 | $1,600.00 |
| 93 | Manhole adjusted to grade (611E99654) | EACH | 3 | $1,800.00 | $1,100.00 |
| 94 | Precast reinforced concrete outlet (611E99710) | EACH | 48 | $500.00 | $500.00 |
| 95 | Inspection well (611E99720) | EACH | 13 | $1,400.00 | $1,200.00 |
| 96 | Special - miscellaneous metal (611E99820) | LB | 1,950 | $2.50 | $5.00 |
| 97 | Cured-in-place pipe liner 24" diameter (899E10000) | FT | 170 | $500.00 | $420.00 |
| 98 | Pavement planing, asphalt concrete (T=3.5") (254E01000) | SY | 6,947 | $11.25 | $8.00 |
| 99 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 12,836 | $170.00 | $170.00 |
| 100 | Aggregate base (304E20000) | CY | 12,773 | $92.00 | $88.00 |
| 101 | Aggregate base, as per plan (304E20001) | CY | 212 | $990.00 | $120.00 |
| 102 | Rubblize and roll (320E70000) | SY | 76,733 | $3.25 | $1.95 |
| 103 | Tack coat (407E10000) | GAL | 13,608 | $2.00 | $2.50 |
| 104 | Non-tracking tack coat (407E20000) | GAL | 42 | $3.05 | $2.50 |
| 105 | Prime coat (408E10000) | GAL | 5,652 | $3.50 | $5.00 |
| 106 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 4,063 | $225.00 | $225.00 |
| 107 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 7,193 | $180.00 | $168.00 |
| 108 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 204 | $590.00 | $510.00 |
| 109 | Asphalt concrete intermediate course, type 1, (449), (driveways) (441E70600) | CY | 21 | $350.00 | $454.00 |
| 110 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 340 | $470.00 | $250.00 |
| 111 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 317 | $112.00 | $105.00 |
| 112 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 57 | $118.00 | $110.00 |
| 113 | Combination curb and gutter, type 2 (609E12000) | FT | 2,803 | $30.50 | $28.50 |
| 114 | Curb, type 6 (609E26000) | FT | 1,315 | $21.50 | $20.00 |
| 115 | Curb, type 7 (609E28000) | FT | 700 | $37.50 | $35.00 |
| 116 | Compacted aggregate (617E10100) | CY | 2,320 | $61.50 | $95.00 |
| 117 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 5.29 | $1,300.00 | $1,300.00 |
| 118 | Longitudinal joint preparation (874E21000) | MI | 5.29 | $4,900.00 | $13,000 |
| 119 | Fire hydrant adjusted to grade, as per plan (638E10401) | EACH | 14 | $3,350.00 | $3,000.00 |
| 120 | Valve box adjusted to grade (638E10800) | EACH | 9 | $500.00 | $900.00 |
| 121 | RPM (621E00100) | EACH | 485 | $38.00 | $37.00 |
| 122 | Raised pavement marker removed (621E54000) | EACH | 485 | $13.00 | $6.00 |
| 123 | Barrier reflector, type 1, BI-directional (626E00102) | EACH | 5 | $16.00 | $14.00 |
| 124 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 5 | $16.00 | $16.00 |
| 125 | Ground mounted support, no. 3 post (630E03100) | FT | 1,770 | $15.00 | $15.00 |
| 126 | Ground mounted support, no. 4 post (630E04100) | FT | 133 | $20.00 | $20.00 |
| 127 | Ground mounted structural beam support, S4X7.7 (630E06400) | FT | 208 | $36.00 | $36.00 |
| 128 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 245 | $40.00 | $40.00 |
| 129 | Sign post reflector (630E08600) | EACH | 49 | $46.00 | $45.00 |
| 130 | Breakaway structural beam connection (630E09000) | EACH | 10 | $550.00 | $550.00 |
| 131 | Sign support assembly, pole mounted (630E79500) | EACH | 5 | $220.00 | $210.00 |
| 132 | Sign, flat sheet (630E80100) | SF | 1,003 | $19.00 | $19.00 |
| 133 | Sign, flat sheet, as per plan (630E80101) | SF | 18 | $27.00 | $27.00 |
| 134 | Sign, ground mounted extrusheet (630E80200) | SF | 351 | $25.00 | $24.00 |
| 135 | Ground mounted structural beam support foundation (630E84500) | EACH | 26 | $920.00 | $860.00 |
| 136 | Removal of ground mounted sign and disposal (630E84900) | EACH | 231 | $10.00 | $10.00 |
| 137 | Removal of ground mounted sign and reerection (630E85100) | EACH | 6 | $65.00 | $65.00 |
| 138 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 5 | $140.00 | $140.00 |
| 139 | Removal of ground mounted post support and disposal (630E86002) | EACH | 151 | $15.00 | $15.00 |
| 140 | Removal of ground mounted structural beam support (630E86102) | EACH | 10 | $300.00 | $295.00 |
| 141 | Removal of pole mounted sign and disposal (630E87500) | EACH | 5 | $45.00 | $45.00 |
| 142 | Edge line, 6" (646E10010) | MI | 12.16 | $3,150.00 | $3,150.00 |
| 143 | Lane line, 4" (646E10100) | MI | 0.37 | $2,000.00 | $1,895.00 |
| 144 | Center line (646E10200) | MI | 6.21 | $4,202.00 | $3,925.00 |
| 145 | Stop line (646E10400) | FT | 301 | $13.00 | $12.50 |
| 146 | Crosswalk line, 24" (646E10520) | FT | 108 | $14.00 | $13.50 |
| 147 | School symbol marking, 72" (646E20100) | EACH | 2 | $722.00 | $675.00 |
| 148 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $226.00 | $120.00 |
| 149 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 305 | $200.00 | $230.00 |
| 150 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 1,000 | $102.00 | $110.00 |
| 151 | Special - work zone traffic signal (614E11300) | EACH | 19 | $6,199.00 | $3,000.00 |
| 152 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 10 | $2,820.00 | $3,300.00 |
| 153 | Detour signing (614E12420) | LS | 1 | $13,000 | $9,450.00 |
| 154 | Asphalt concrete for maintaining traffic (614E13000) | CY | 417 | $200.00 | $125.00 |
| 155 | Barrier reflector, type 1, one way (614E13310) | EACH | 106 | $13.00 | $20.00 |
| 156 | Barrier reflector, type 2 (bidirectional) (614E13312) | EACH | 193 | $24.00 | $25.00 |
| 157 | Object marker, one way (614E13350) | EACH | 106 | $22.00 | $28.00 |
| 158 | Object marker, two way (614E13360) | EACH | 193 | $24.00 | $28.00 |
| 159 | Portable changeable message sign, as per plan (614E18601) | SNMT | 36 | $963.00 | $1,600.00 |
| 160 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.27 | $15,000 | $15,125 |
| 161 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 2.02 | $15,000 | $9,095.00 |
| 162 | Work zone dotted line, class I, 6", 648 (614E24142) | FT | 40 | $5.00 | $6.75 |
| 163 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 240 | $19.00 | $10.00 |
| 164 | Water (616E10000) | MGAL | 95 | $85.00 | $10.00 |
| 165 | Compacted aggregate (617E10100) | CY | 183 | $118.00 | $150.00 |
| 166 | Water (617E25000) | MGAL | 1 | $250.00 | $10.00 |
| 167 | Portable barrier, unanchored (622E41100) | FT | 5,306 | $15.00 | $19.00 |
| 168 | Center line (643E00300) | MI | 0.25 | $1,472.00 | $5,000.00 |
| 169 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 159 | $15.00 | $25.00 |
| 170 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 364 | $30.00 | $50.00 |
| 171 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 380 | $43.00 | $40.00 |
| 172 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 523 | $37.50 | $50.00 |
| 173 | Surface preparation of existing structural steel (514E00050) | SF | 6,288 | $16.00 | $20.00 |
| 174 | Field painting of existing structural steel, prime coat (514E00056) | SF | 6,288 | $7.50 | $10.00 |
| 175 | Field painting structural steel, intermediate coat (514E00060) | SF | 6,288 | $7.50 | $10.00 |
| 176 | Field painting structural steel, finish coat (514E00066) | SF | 6,288 | $6.00 | $7.00 |
| 177 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 40 | $160.00 | $100.00 |
| 178 | Final inspection repair (514E10000) | EACH | 4 | $535.00 | $100.00 |
| 179 | Special - structures: cleaning of bridge drainage (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 180 | Special - structures: cleaning of bridge joints (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 181 | Special - structures: cleaning of bridge seats (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 182 | Special - structures: sweeping bridges (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 183 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $1,070.00 | $1,000.00 |
| 184 | Approach slab removed (202E22900) | SY | 114 | $235.00 | $220.00 |
| 185 | Embankment, as per plan (203E20001) | CY | 19 | $214.00 | $200.00 |
| 186 | Unclassified excavation (503E21300) | LS | 1 | $12,878 | $12,000 |
| 187 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 100 | $11.00 | $10.00 |
| 188 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 546 | $30.00 | $50.00 |
| 189 | Sealing concrete bridge decks with HMWM resin (512E10300) | SY | 578 | $32.00 | $30.00 |
| 190 | Concrete repair by epoxy injection (512E10600) | FT | 12 | $161.00 | $500.00 |
| 191 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 546 | $29.00 | $50.00 |
| 192 | Semi-integral abutment expansion joint seal (516E14020) | FT | 86 | $69.50 | $65.00 |
| 193 | Porous backfill with geotextile fabric (518E21200) | CY | 21 | $359.00 | $335.00 |
| 194 | 6" perforated corrugated plastic pipe (518E40000) | FT | 182 | $30.00 | $28.00 |
| 195 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 60 | $37.50 | $35.00 |
| 196 | Patching concrete structure (519E11100) | SF | 146 | $214.00 | $300.00 |
| 197 | Reinforced concrete approach slabs (T=17"), as per plan (526E30001) | SY | 227 | $482.00 | $450.00 |
| 198 | Type C installation (526E90030) | FT | 68 | $535.00 | $500.00 |
| 199 | Special - structures: cleaning of bridge drainage (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 200 | Special - structures: cleaning of bridge joints (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 201 | Special - structures: cleaning of bridge seats (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 202 | Special - structures: sweeping bridges (530E00200) | LS | 1 | $3,212.00 | $3,000.00 |
| 203 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $78,000 | $75,000 |
| 204 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $6,542.00 | $50,000 |
| 205 | Maintaining traffic (614E11000) | LS | 1 | $395,150 | $1,175,500 |
| 206 | Field office, type C (619E16020) | MNTH | 18 | $4,300.00 | $4,000.00 |
| 207 | Construction layout stakes and surveying (623E10000) | LS | 1 | $151,000 | $120,000 |
| 208 | Mobilization (624E10000) | LS | 1 | $715,000 | $400,000 |
| 300 | Work zone center line, class I, 642 paint (614E21100) | MI | 5.74 | $1,472.00 | $1,525.00 |
| 301 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 11.49 | $744.00 | $975.00 |